Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                    
                Gravity Flow of Broken Rock - What is Known and UnknownThe knowledge in the field has been reviewed by literature studies, and using experience from personal research in sublevel caving. There is a lot of material regarding gravity flow of fine grained ma
Jan 1, 2000
 - 
                    
                Evaluation of Underground Mining Options at Xstrata Copper's Ernest Henry Copper-Gold MineBy P Christen, D R. Ashley, G R. Power
The Ernest Henry Mine is currently a copper-gold open pit operation situated in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current throughput of 11 million ton
Jan 1, 2009
 - 
                    
                Traceability of native seed for mine rehabilitationBy A Grant, H Thomas, C Clarke, B Fuller
Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali
Aug 2, 2023
 - 
                    
                Tailings Disposal Costs ù The Hidden Design ParameterThe purpose of this paper is to look at the costs of tailings disposal, and in particular the comparative costs of different disposal methods in different situations. Costs are often the hidden design
Jan 1, 2000
 - 
                    
                Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based SimulatorsBy P Wood, S Leveritt
This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy
Sep 18, 2012
 - 
                    
                Mine Geology of the MacPhersons Reward Gold Mine, Coolgardie, Western AustraliaBy M D. Goodz
MacPhersons Reward gold deposit is in a post-kinematic tonalite intrusion which is a setting different from many other deposits of the Coolgardie goldfield that are hosted in early Archaean tholeiitic
Aug 22, 2011
 - 
                    
                Secondary Ventilation as a Value Proposition – A Case StudyBy A Golsby
Both primary and secondary ventilation is important in underground mining. Secondary ventilation refers to the provision of ventilation to development ends, stopes and services facilities, which const
Aug 31, 2015
 - 
                    
                Post-mining Land Use Options in the Appalachian Coal Mining Region of the USABy J Skousen, C E. Zipper
"Prior to the 1950s in the USA, surface coalmines were generally left without any reclamation. As government regulations advanced, mine operators were required to backfill the area and plant grasses o
Jul 16, 2014
 - 
                    
                Geology, Grade Control and Reconciliation at the Douglas Mineral Sands DepositThe Douglas mineral sands deposit is located 75 km north of Hamilton in western Victoria, Australia. The deposit was discovered in the late 1990s by Basin Minerals Limited and purchased by Iluka Resou
Jan 1, 2009
 - 
                    
                Effectively Installing and Commissioning Flotation EquipmentBy B Murphy, J L. Heath
Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th
Sep 1, 2014
 - 
                    
                Geomembranes – from design to handover and some of the lessons learntBy A Marta
Geomembrane (GMB) liners are being used more frequently for the storage or capping of mine waste due to stricter regulatory requirements relating to environmental protection. The longevity of any li
Jul 23, 2018
 - 
                    
                Roadway and Pillar Design Considerations for Development and Longwall Extraction at Central Colliery, QueenslandBy Ward B
Central Colliery was developed to exploit large underground reserves in the German Creek lease. It was planned from the outset as a retreating longwall operation and is the first longwall mine in
Jan 1, 1986
 - 
                    
                Mt Wright – geotechnical learnings from a sub level shrinkBy P Wilson
The Mt. Wright Underground Mine is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. The establishment
Nov 30, 2018
 - 
                    
                The æSmoking GunÆ of Detailed Mine Closure Cost Over-Run - A Review Using Case Studies of the Real Costs Associated with the Demolition and Removal of Infrastructure in Mine ClosureBy A Hutton, C Dick, D Fletcher
Mine and facility closure planning is a dynamic and rapidly evolving landscape. In this landscape, mining companies and industry consultants are generally good at estimating the associated earthworks
Jul 10, 2012
 - 
                    
                A Decision-making Framework for Water Supply and Flood Protection Options in Net Present Value TermsBy H J. J Boshoff, A J. Karrasch
Mine planners frequently face the challenge of mitigating the impact of climatic events on mining operations, such as floods and droughts. Specific water management infrastructure can be implemented t
Jun 28, 2016
 - 
                    
                Cost Management OptimisationBy B King
Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro
Nov 24, 2014
 - 
                    
                Optimisation Challenges in Underground Mine Planning and DesignUnderground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab
Dec 6, 2010
 - 
                    
                Do You Understand Your Legal Obligations in the Industry?Most new engineers in the mining industry do not realise the importance of legal obligations. During investigations the first question you are asked is: Do you have any proof or evidence? The smallest
Jan 1, 2007
 - 
                    
                Tailing Thickener Operability and Control Improvements at ProminentáHillBy J Lombardi, M Weidenbach
"OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township
Oct 29, 2012
 - 
                    
                Critical risks unveiled – the imperative of broad-brush risk assessmentsBy C Young
In the vast expanse of Western Australia’s mining sector, a critical issue has come to light: many mining operations overlook the power of a Broad-Brush Risk Assessment (BBRA) to uncover their critica
Apr 16, 2024