Search Documents

  • DFI
    Effects Of Helical Anchor Geometry On Long-Term Performance Of Small Wind Tower Foundations Subject To Dynamic Loads

    By Amy B. Cerato

    The application of this study is to use helical anchors as a foundation system for small wind tower (1 ? 10 kW) guyed cables. Helical anchors are currently used to anchor guyed cables of telecommunic

    Jan 1, 2008

  • CIM
    The Importance of Efficient Mass Flow Balance in Crushing and Screening Plants

    By Fernando Romero Lage

    The purpose of this paper is to analyze detailed crushing and screening configurations and the interrelationship as they relate to mass flow balance, operating efficiency, plant availability and final

    May 1, 2010

  • AIME
    Iron-ore Sinter

    By G. M. Schwartz

    THERE has been considerable controversy regarding the structure and mineral constituents produced when iron ore is sintered. This investigation was undertaken in order to establish the fundamental rea

    Jan 1, 1929

  • SAIMM
    Determining the impact of haulage optimisation on addressing open pit mining economic and environmental challenges: A case study blasting

    By B. Genc, P. Malepfane

    This study proposes a new approach to reduce the environmental impact during surface mining by improving environmental factors through the incorporation of carbon footprint into strategic mine plannin

    Jan 30, 2026

  • SME
    Miners Remain Upbeat at NWMA Meeting

    By Steve Kral

    As the current boom in the global mining industry rumbles on, mining companies have had to step up their efforts to replace mined reserves. Many of the majors are replacing and adding to their reserv

    Jan 1, 2006

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • IOM3
    Nature of gold mineralization at Mule Canyon, Lander County, Nevada, USA

    By T. J. Serenko

    The epithermal deposit is hosted by Tertiary volcanic rocks that lie between mid-Miocene normal faults of the Northern Nevada Rift. Petrographic, laser-ablation and metallurgical observations suggeste

    Aug 1, 1995

  • NIOSH
    IC 7436 Safety Catches on Mine Cages and Methods of Testing Them

    By J. H. East, D. Harrington

    "INTRODUCTION Shaft mines, coal and noncoal alike, have a common hoisting problem that remains largely unsolved - how to obtain a mechanical device that will suspend a cage or skip in a mine shaft if

    Feb 1, 1948

  • SME
    Demonstrating the Financial Impact of Mining Injuries with the Updated Safety Pays in Mining V2.0 Web Application - SME Annual Meeting 2024

    By J. R. Heberger, B. H. Ngo

    The Safety Pays in Mining v2.0 web application, developed by the National Institute for Occupational Safety and Health (NIOSH) Mining Program, helps mines determine the potential costs associated with

    Feb 1, 2024

  • SME-ICGCM
    Monitoring Mobile Roof Supports

    By Kenneth E. Hay

    Researchers from the U.S. Bureau of Mines conducted a field study to assess the safety of remotely controlled mobile roof supports (MRS) in a retreat pillar mining operation, Data were collected to pr

    Jan 1, 1995

  • DFI
    The Deep Cut-Off at the Walter F. George Dam

    "TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow

    Jan 1, 2014

  • AUSIMM
    The Kiewa Hydro-Electric Scheme Special Reference to Tunnelling Operations

    By Knevitt L. T

    PART 1Details of Kiewa Scheme.Introduction.Topography.Preliminary Investigations.Geology.Description of Project.Details of Main Works.Main Transmission of Power.Construction Facilities.PART 2Undergrou

    Jan 1, 1950

  • SME
    Comparison Of Oleate Adsorption At Calcite And Fluorite Surfaces: An In-Situ FT-NIR/IRS And MLRS Study

    By C. A. Young

    In-situ Fourier transform infrared/internal reflection spectroscopy (FT ?IR/IRS) has been extended to study oleate adsorption at a calcite surface. The birefringent and transmission limitations of cal

    Jan 1, 1993

  • SME
    Reclamation of the Canmore Creek Open Pit Coal Mines to Form Quarry Lake Heritage Park, Alberta, Canada; an Example of Successful, Walk-Away, Pit Lake Closure

    By H. G. Stephenson, D. Castendyk

    Open pit anthracite mining at the Canmore Creek Mines, Canmore, Alberta, south of Banff National Park, resulted in several pit lakes by the early 1970’s. To enable future mining opportunities in the R

    Jan 1, 2019

  • NIOSH
    Mineral-Dressing Characteristics Of The Red Iron Ores Of Birmingham, Ala. - Introduction

    By Will H. Coghill

    The scope of this paper is such that it was deemed advisable to group the contents into several main sections. They are: Section 1. Geography and Geology. Section II. Historical Review. (a) Mining

    Jan 1, 1946

  • CIM
    An Overview of the Lithium Carbonate Process Flow Sheet for Concentrates Derived from Hard Rock Lithium Sources

    By Tassos Grammatikopoulos, Gary Pearse, Massoud Aghamirian, Charlotte Forstner, Stephen Mackie

    "SGS Minerals Services (Lakefield, Ontario site) has conducted a number of developmental and pilot programs that examined methods for the beneficiation, extraction and recovery of lithium from a varie

    Jan 1, 2012

  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • SAIMM
    New Developments On Mine Planning And Grade Control At Sishen Iron Ore Mine

    By D. J. Steynfaard

    Sishen Iron Ore Mine is situated 280 km north-west of Kimberley in the Northern Cape Province of South Africa. The mine produces and sells high quality iron ore of various specifications to various na

    Jan 1, 2003

  • AUSIMM
    The Development of the System of Siphons at Present in Use for Drainage Purposes at North Broken Hill Limited

    With the employment of a system of ore pillars to support the hanging wall during the mining operations at the North Mine, it was found that, when the stopes were worked out and the pillars remained i

    Jan 1, 1938

  • AUSIMM
    Some Notes on Recent Changes in Ore Extraction Practices in the Zinc Corporation and New Broken Hill Consolidated Mines

    Up to the end of World War n, flat-back cut and fill stoping with or without square sets was the universal method of ore extraction. Rapid changes in practice occurred during the post-war years; first

    Jan 1, 1957