Process Developments At Tailings Leach PlantBy Martin Banda, Gift C. Chisakuta, Moses Chabinga
KCM made a major modification to the Nchanga Tailings Leach Plant (TLP) changing the circuit from feeding post leach thickeners in parallel with leach discharge for solid ?liquid separation to a Count
Jan 1, 2005
-
Strategic mine planning?communicating uncertainty with scenarios - SynopsisBy G. L. Smith
This paper introduces and defines the concept of a linkage between long-term planning parameters (?global assumptions?) and possible future world views as conceived in scenario planning. Scenario plan
Jan 1, 2008
-
Accelerated Kimberlite Weathering - The Role Of Cation Type On The Settling Behaviour Of FinesBy E. T. Boshoff
Paper written on project work carried out in partial fulfilment of B. Eng. (Metallurgical Engineering) The weathering of kimberlite can be accelerated with cations in solution if swelling of the ki
Jan 1, 2005
-
The Process Design Of Gold Leaching And Carbon-In-Pulp Circuits - IntroductionAssuming that a gold ore has been effectively ground to ensure maximum economic liberation of gold, the circuits that will have the most effect on the successful operation of a gold plant will be that
Jan 1, 1999
-
‘Salem Box Test’ to predict the suitability of metallurgical coke for blast furnace ironmakingBy Ravichandar. D., K. B. Nagashanmugam, M. S. Pillai
"Blast furnace performance depends strongly on the coke reactivity index(CRI) and coke strength after reaction (CSR) properties. An innovative and cost-effective method, known as the Salem Box Test, h
Jan 1, 2015
-
Silicon Processing: From Quartz To Crystalline Silicon Solar CellsBy B. S. Xakalashe
Keywords: Pyrometallurgy, silicon, solar cells Silicon has been the dominant material in the photovoltaic (PV) industry since its application in the space industry in 1958. This review focuses on
Jan 1, 2011
-
Observed Spatial and Temporal Behaviour of Seismic Rock Mass Response to BlastingBy K. Woodward
"SynopsisSeismically active mines generally experience an increase in seismic hazard due to rock mass instability following blasting. Re-entry protocols commonly include measures to limit the spatial
Jan 1, 2015
-
Investigation of the geomechanical criteria for safe and efficient crown pillar extraction beneath stabilised rock rockfill at the Crusader MineBy J. Whitford
The established crown pillar extraction method at Gold Fields Australia Ltd.’s Crusader Mine, leads to the significant dilution and poor recovery of ore due to caving of the overlying loose rockfill.
Jan 1, 2003
-
Research into fire fighting and fire prevention in South AfricaBy A. Whillier
The decisive action taken by mine managements in recent years has been the main factor in bringing about the present downward trend in mine fires. A better understanding of the fundamental factors tha
Jan 1, 1981
-
Design of lining system for a pressure tunnel on the base of interaction between rock and liningBy A. Kazemi, M. A. Ahmadi
Pressure tunnels are constructed nurously in related with powerhouse. In some cases, according to high internal water pressure, rock mass around tunnel can seldom suffer this pressure. So installation
Jan 1, 2003
-
Mathematical Modelling Of Heat Transfer In Six-In-Line Electric Furnaces For Sulphide Smelting ? SynopsisAn efficient and portable mathematical model has been developed for simulating heat transfer in six-in-line slag-resistance-heating electric furnaces for smelting sulphide ores to produce base metals
Jan 1, 2011
-
PNEUFLOT® - Modern Flotation Technology In The 21st CenturyBy Lutz Markworth, Wolfram Jaspers, Johannes Kottmann
PNEUFLOT® technology has been applied for the past 20 years in coal, ore and other minerals processing plants. During the last two years this technology has achieved a breakthrough with some 42 units
Jan 1, 2007
-
A Mining Perspective on the Potential of Renewable Electricity Sources For Operations in South Africa Part I—The Research Approach and Internal Evaluation ProcessBy R. G. Votteler, A. C. Brent
"The business performance of mining corporations in South Africa is adversely affected by the constantly increasing electricity costs. The most commonly used power sources are the national utility sup
Jan 1, 2017
-
A More Corrosion Resistant Herculestm Alloy.By M. J. Papo, A. Muwila
Hercules? is a low nickel austenitic stainless steel developed at Mintek that has a typical composition of 9 wt% Mn, 0.05 wt% C, 2 wt% Ni, 0.25 wt% N and 16.5 wt% Cr. A more corrosion resistant versi
Jan 1, 2006
-
Evaluation Of Oxine-Type Ligand Coordination To Zirconium (IV) - SynopsisBy M. Steyn
[Zr(C9H6NO)4]?(HCON(CH3)2)?(H2O), where (C9H6NO) = 8-hydroxy quinoline (oxH), was synthesized and characterized. This tetrakis-coordinated zirconium complex crystallized in the triclinic crystal syste
Jan 1, 2013
-
Designing an Advanced RC Drilling Grid for Short-Term Planning in Open Pit Mines: Three Case StudiesBy J. M. Ortiz
This paper shows the usefulness of geostatistical conditional simulation combined with the quantification of sampling errors obtained from the analyses of fundamental errors ? validated from duplicate
Jan 1, 2014
-
Design and development of a low noise rockdrillBy R. W. Ottermann, N. D. L. Burger, A. J. von Wielligh, P. R. de Wet, J. L. Steyn
A low noise blast hole drilling system was developed to limit the risk of noise induced hearing impairment in mining operations. Noise induced hearing loss has been identified as a major occupational
Jan 1, 2003
-
The ROMA Project (Resource Optimization And Recovery In The Material Industry) ? A Typical Cooperation Project In NorwayBy M. Tangstad
Keywords: Pyrometallurgy, ROMA, Norway, furnace, fines The ROMA project is a competence project on optimizing the usage of raw materials and energy in the ferromanganese, silicon, and aluminium in
Jan 1, 2011
-
Bord And Pillar Applications On The Platinum Mine: T-Cut Mining MethodBy C. C. Oosthuizen
Paper written on project work carried out in partial fulfilment of Technikon Practical Training Frank shaft is mining both Merensky reef and UG2 reef. The Merensky orebody is almost depleted and th
Jan 1, 2005
-
Measurement of induced stress under high rock stress by compact conical-ended borehole overcoring techniqueBy K. Sugawara, H. -S. Jeong, Y. Ishiguro, J. Otani, Y. Obara, A. Hirata
A series of measurements of induced stress by the Compact Conical-ended Borehole Overcoring (CCBO) technique was performed within rock mass around a tunnel excavated in a region that an underground po
Jan 1, 2003