The Process Design Of Gold Leaching And Carbon-In-Pulp Circuits - Introduction

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 14
- File Size:
- 600 KB
- Publication Date:
- Jan 1, 1999
Abstract
Assuming that a gold ore has been effectively ground to ensure maximum economic liberation of gold, the circuits that will have the most effect on the successful operation of a gold plant will be that of the leaching and carbon-in-pulp circuit (CIP). The reagent and utilities operating costs associated with leaching, adsorption, elution and regeneration would typically make up some 15% of total operating cost, whilst the capital costs associated with these areas is about 16% of the total. Although not largest (capital and operating costs associated with comminution are generally dominant) these items represent a significant proportion of capital and operating cost. Much more importantly, these plant areas represent the primary gold recovery process and their technical and operational efficiencies will have a significant impact on overall plant efficiency. The objective during process design of these sections is thus to develop a design which provides maximum technical and economic efficiency and which is robust to potential changes in ore throughput, mineralogical characteristics and head-grade. Experience has shown that, particularly for longer life and higher-grade projects typical of the South African underground gold mining industry, small changes in recovery and efficiency have a significant value over the life of the project.
Citation
APA: (1999) The Process Design Of Gold Leaching And Carbon-In-Pulp Circuits - Introduction
MLA: The Process Design Of Gold Leaching And Carbon-In-Pulp Circuits - Introduction. The Southern African Institute of Mining and Metallurgy, 1999.