Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Use of Isolated Tie-Back Plates to Stabilize a Landslide in Steep Terrain
By Scott D. Neely, Donald R. Clark
"An existing landslide located at the southeast corner of the Telluride Regional Airport has been in an active state of failure for several years. The presence of the landslide has represented an on-g
Jan 1, 2015
-
Alternative Deep Foundation Solutions – DMM at LPV-111 in New Orleans
By Peter Cali, Wesley Schmutzler
"The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t
Jan 1, 2017
-
TECHNICAL NOTE: Direct Solution of the Brinch-Hansen 90% Pile Ultimate Failure Load
By Don W. Dotson
In 1962, Kondner prepared several papers dealing with hyperbolic stress-strain response of cohesive soils. The following year, Brinch Hansen proposed 80% and 90% failure criteria for stress-strain be
Aug 1, 2013
-
A Review Low Strain Integrity Testing Practices In India And Complexities Involved In Evaluation Of Test Results
By RavikiranVaidya, Vishal Dhamecha
Low Strain Pile Integrity Testing has been used in India since 1990’s and several have tried to demonstrate the utility and benefits of this method. However, use of this technology was limited till 19
Sep 1, 2022
-
Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean
By Ihab Allam PE, Meeok Kim. PE. Ph. D
The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa
-
Assessment of Existing Bulkhead Walls for Dredging Impacts
By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Load Tests on Drilled Shafts at Goethals Bridge Replacement
By John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft
Jan 1, 2016
-
Bio-Grout Based Soil Improvement
By Terzis D. PhD, Katterbach M.
While awareness around the environmental impact of existing grout materials and chemical binders is increasing rapidly, biotechnologies are growing traction as sustainable alternatives in groundwork o
May 1, 2022
-
Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, Ga
By Robert L. Goehring, Fred Munene
This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.
-
Laboratory Validation Of In-Situ Tests - 1. Introduction
This paper summarizes seven years of Italian experience with the use of large calibration chambers for the calibration, under closely controlled stress and strain conditions, of some in situ testing
Jan 1, 1987
-
AUT-CPT & Pile Database for Piling Performance Using CPT and CPTU Records
By Sara Moshfeghi, Seyyed Majdeddin Mir Mohammad Hosseini, Abolfazl Eslami
"Due to variety of current pile bearing capacity methods based on the cone penetration test (CPT), for optimum design, it is necessary to evaluate the performance of such methods in different geotechn
Jan 1, 2017
-
Bertha Rescue Shaft – SR99 Tunnel
By Lance Rasband, Richard Hanke
"Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the
Jan 1, 2015
-
Three Deep Mixing Projects: Comparison between Laboratory and Field Test Results
By George Filz, Morales, Carlos, Bertero, Filippo Maria, Alessandro, Leoni
"The Deep Mixing Method (DMM) represents a viable solution to improve adverse geotechnical properties of foundation soils for many practical applications. A pre-construction soil investigation campaig
Jan 1, 2015
-
Design Issues for Mini-Caissons in the NYC Area
By Caciola Jr. Joseph J., Nidal M. AbiSaab
"Thanks in great part to the geology of the New York City Metropolitan area, mini-caissons are a popular choice for deep foundations. These drilled elements are readily available, easy to install with
Jan 1, 2016
-
Countermeasures Against Soil Liquefaction At Galataport Project In Istanbul, Turkey
By Carlandrea Albonico, Salvatore Miranda
The paper describes an innovative geotechnical engineering solution that has been provided within the scope of the Galataport Project, in Istanbul, Turkey. Among all interesting geotechnical works inc
Nov 1, 2022
-
A Study Of Aspects Of The Historical Development Of Geotechnical Engineering
By Thomas J. Kennedy, Michael D. Bennett
The study of geotechnical history is well-established. Most geotechnical practitioners, teachers, and graduate students have some grasp of the origins of the field. However, this understanding often c
Oct 1, 2022
-
Non-Destructive Testing Of Pile Foundations In India: Current Practices And Challenges
By Heman Manchanda, Jyoti Agarwal
Several infrastructure projects are under construction in India; many of them involves construction of deep foundations like reinforced concrete and steel piles to support super structures. As most of
Sep 1, 2022
-
Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DC
By Karl A. Higgins, Michael D. Venezia
The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o
Jan 1, 2019
-
Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And Analysis
By W. L. Chong, Y. Zou
There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process
Nov 1, 2022
-
Cockatoo Island Seawall Seepage Barrier (b791f2b4-d692-4b8a-afba-0ecd9b385be1)
By Chris L. Powell, Russell J. Denny
"The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165
Jan 1, 2017