Development of Lattice-Shaped Cement Treatment Method for Liquefaction CountermeasureBy Seiji Mizutani, Hirofumi Taguchi, Makoto Yoshida, Hidenori Takahashi, Naotoshi Shinkawa, Kazuo Konishi, Yoshiyuki Morikawa, Masaya Kawata
"The lattice-shaped cement treatment method has been used to improve the seismic performance of liquefied sandy soil in Japan. The efficacy of the method has been confirmed by the huge earthquake in J
Jan 1, 2015
-
Drilled Displacement Piles in the Northeastern United StatesBy Jr NeSmith
"Drilled Displacement piles are a product of screw pile technology originally developed in Europe. The process involves rotating tool into the ground that displaces the soil laterally as it advances,
Jan 1, 2016
-
Deep Mixing in the United States: Milestones in EvolutionBy Donald A. Bruce
"The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments were strong
Jan 1, 2015
-
Value-Engineering of H-Pile Foundations in Karstic GeologyBy Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman
"A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert
Jan 1, 2016
-
John F. Kennedy Airport Site Redevelopment: Tapertube Pile FoundationBy Gisele R. Passalacqua, Aly Mohammad, Joanna Smith
The $13 billion John F. Kennedy (JFK) airport construction redevelopment program includes new terminals and buildings that are supported on piles to meet the airport expansion demand due to increased
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative SolutionBy Mario Mauro
In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
Urban High Capacity Deep Foundation Solutions in Sites with Complex History and GeologyBy Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t
Jan 1, 2019
-
Engineering The Mansion's HeritageBy Ken MacLeod
A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi
Jan 1, 2006
-
Excavation-Induced Movement of Adjacent FoundationsBy Hugo Meggitt, Damian R. Siebert, Wystan Carswell
Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras
Jan 1, 2019
-
Building The Devil’s Playground: How a Ground Improvement Program Eliminated the Need for Pile FoundationsBy Christian B. Woods, Joe C. Drumheller
"Kenneth A. Huber, P.E., Langan Engineering & Environmental Services, New York, New York, USAThe dream to bring New Jersey Devils hockey to the largest city in New Jersey became a reality in the summe
Jan 1, 2015
-
Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BCBy Keith MacKay, John Carter, David Siddle, Fernando Faminia
"The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands
Jan 1, 2016
-
Jet Grouting for Echo Dam Seismic RehabilitationBy Tara Schenk-McFarland, Mark Bliss
Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s
Jan 1, 2017
-
Adjacent Top-Loaded Bi-Directional Test And Conventional Bidirectional Load Test Results – Site IiBy Patrick J. Hannigan, Seth Robertson, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (―TLBT‖) and the conventional Bi-Directional Load Test (―BDLT‖) are full-scale static load test methods. In both methods, the test loads are applied bi-directionally
Oct 1, 2022
-
Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off WallBy James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016
-
Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier WallsBy R. Lee Wooten, David R. Shields, Darren D. Clark
"Borehole permeability tests that measure flow or head changes in boreholes located within seepage barrier walls are commonly used to estimate the in situ permeabilities of those walls for quality con
Jan 1, 2016
-
Driven Pile Foundation Design and Construction Issues for a Highrise Building in ManhattanBy Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer
"This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,
Jan 1, 2016
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load TestingBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021