Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Canada's Role in the Atomic Age

    By F. R. Joubin

    MR. CHAIRMAN, Members of the C.I.M., and Friends -particularly friends, because I am not entirely a stranger in your city. I was last here some five years ago and it has given me a great deal of pleas

    Jan 1, 1958

  • CIM
    The Changing Canadian Nickel Smelting Landscape - Late 19th Century to Early 21st Century

    By C. M. Diaz, S. W. Marcuson

    In the late 19th century, the discovery of rich nickel-copper sulfide ore bodies in Sudbury and the need for tonnage quantities of the metal to be used in nickel steel armor provided the foundation fo

    Jan 1, 2005

  • CIM
    Cyclones

    By Norman A. Jull

    "IntroductionThe scope of this paper is intended to deal mainly with cyclones in grinding circuits. However, the section on Cyclone Equipment, contains more general descriptions, to cover most of the

    Jan 1, 1989

  • CIM
    Project Execution & Cost Escalation in the Mining Industry

    By John A. Wells, Leticia Conca, Kenneth G. Thomas

    "Since about 2002 there has been significant capital cost escalation, not inflation, in the mining industry causing turmoil for successful project completion. Project capital costs have more than doub

    Jan 1, 2014

  • CIM
    The Treatment of Roaster - Off Gases at Campbell Red Lake Mines Limited

    By J. S. Roberts

    "Campbell mines has been in operation since 1948. Part of the process consists of roasting of a flotation concentrate which contains arsenopyrite.At present operation level the milling rate averages a

    Jan 1, 1976

  • CIM
    Energy and Cost Comparisons of HPGR Based Circuits with the SABC Circuit Installed at the Huckleberry Mine

    By O. Mejia, J. Drozdiak

    "This paper summarizes a comprehensive energy and cost study comparing an existing SAG mill based circuit at Huckleberry Mine with two proposed circuits involving comminution technologies which are as

    Jan 1, 2013

  • CIM
    The Future of Sustainability

    By Bruce Conard

    For many years, Bruce Conard has been engaged in reading about and discussing the desired sustainability of the mining and metals resource industry. He has, however, become concerned that there is a g

    Jan 1, 2014

  • CIM
    Geophysical Case Study of the Gallen Deposit, Québec, Canada

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "As part of a larger research program, a number of MEGATEM airborne electromagnetic (EM) test flights were flown over the Gallen massive sulfide deposit in northwest Québec. A particularity of this te

    Jan 1, 2007

  • CIM
    Advanced Control for Column Flotation

    By G. A. Kosick, G. S. Dobby

    "This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense

    Jan 1, 1990

  • CIM
    Economic Optimisation of Pb-Zn Concentrates By Regrinding and Cyanidation of Silver from Zinc Concentrate

    By Carlos Avalos Casillas, Saul Ortiz Landeros

    The current work shows metallurgical results obtained at the Centro de Investigación y Desarrollo Tecnológico (Peñoles CIDT), as a continuation of the work first published in February 2012. With the a

    Jan 1, 2014

  • CIM
    Central Steam-Heating in Winnipeg

    By J. W. Sanger

    The establishment of a central steam-heating system in Winnipeg and its inauguration in October, 1924, has attracted a considerable amount of attention. Not only does it excite the curiosity of the en

    Jan 1, 1926

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • CIM
    The Mineral Industries Their Present Place in the Commercial Development of Canada

    By Charles Camsell

    At the last annual meeting of this Institute the programme very properly was drawn up and carried out with the special object of calling attention to the Dominion's position and problems with reg

    Jan 1, 1924

  • CIM
    Genetic Aspects & Classification of Important Canadian Uranium Deposits

    By R. H. McMillan

    A classification of important uranium deposits which utilizes both genetic and descriptive criteria is presented. The dual aspect is useful because, while the non-genetic nomenclature for the differen

    Jan 1, 1978

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • CIM
    The Colomac Project

    By V. N. Bryant

    "1.0 SYNOPSISThe Colomac property, located 137 miles by air northwest of Yellowknife in Canada's NWT. will recover gold from 10,000 tons per day of open pit ore.The decision to proceed with the projec

    Jan 1, 1990

  • CIM
    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • CIM
    Practical Operational Aspects of Dense Medium Cyclone Separation

    By Faan Bornman

    "Reeves and Platt1 stated that dense medium separation is one of the most complex unit processes in mineral processing today particularly if cyclones are used. It is also the most efficient gravity co

    Jan 1, 2014

  • CIM
    Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, Yukon

    By Nick D. Rose

    The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,

    May 1, 2002