    Viceroy Minerals Corporation = Brewery Creek Mine Process Overview

    By Brad Thrall, Howard Bradley, Michael Samuels

    "LOCATIONViceroy Minerals Corporation owns and operates the Brewery Creek heap leach gold mine located approximately 55 kilometers northeast of Dawson City, Yukon Canada. Dawson was home of the Klondi

    Jan 1, 1999

  • CIM
    Using Magnetic Liners to Reduce costs and Improve Efficiencies

    By Terry Keough

    Contents for discussion ?Current liner technology ?Innovation of magnetic products ?Development of magnetic wear liners ?Installation and change out method ?Uses and capabilities ?Internal we

    May 1, 2010

  • CIM
    Economic and Agricultural Conditions in British Columbia

    By F. M. Clement

    British Columbia, unlike the Prairie Provinces, cannot lay claim to vast prairies. She can, however, claim many valleys, uplands and plateaus that are capable of marked agricultural development. It ha

    Jan 1, 1925

  • CIM
    Metallurgical Testing of Gold Ores

    By T. Salman

    Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)

    Jan 1, 1975

  • CIM
    ILTEC Technology – New Pathways towards Safe and Effective Cooling

    By T. Lux, M. Hanel, Degel, A. Filzwieser, R., H. Joubert

    It is the increasing demand for an economic and cost saving operation mode that requires effective cooling in order to achieve low refractory wear and good furnace lifetime, which is making cooling te

    Jan 1, 2019

  • CIM
    Improving Fine Lead and Silver Flotation Recovery at BHP-Billiton’s Cannington Mine

    By Glenn Clarke, Ben Holloway, Barry Lumsden

    "BHP-Billiton’s Cannington mine in Northwest Queensland produces a silver-rich lead concentrate and a zinc concentrate. The plant has the capacity to treat 3.1 mta and for the year to June 2006 mean f

    Jan 1, 2008

  • CIM
    A Strategy to Reduce the Consumption of Sodium Sulfide in Flotation of Molybdenite at the Sarcheshmeh Copper Complex

    By S. Banisi, M. Poorkani

    The Sarcheshmeh copper deposit contains 1 billion tones of ore averaging 0.7% copper and 0.025% molybdenum. It is located southeast of Iran and currently processes 41,000t/d. Molybdenite as a by-produ

    Jan 1, 2005

  • CIM
    From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles Concentrator

    By Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin

    "North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part

    Jan 1, 2003

  • CIM
    Jump-Start Your Safety Culture by Changing Environment Perception

    By A. Valdivieso

    Reducing accident rates keeps getting more and more complex as the usual tools enter a curve of diminishing results. Fortunately, nothing modifies behaviour in a stronger and wider way than having a r

    Jan 1, 2019

  • CIM
    Fundamental Study of Reactive Oily Bubbles in Sulphide Flotation

    By Carolyn Kenney, Jianjun Liu, Zhenghe Xu

    "The flotation of fine particles has been a challenge to scientists and engineers in mineral processing. A novel concept of reactive oily-bubbles as carrier to float fine particles is described in thi

    Jan 1, 2003

  • CIM
    Emperical Design of Stopes for the Lower Rodeo Orebody

    By Denis Thibodeau

    The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the

    May 1, 2002

  • CIM
    Environmental Regulation and Compliance - A Summary

    By S. W. Stogran

    "A brief summary of the environmental testing and analyses required to ensure and maintain compliance of mining properties will be discussed. Programs for new and existing properties and for propertie

    Jan 1, 1992

  • CIM
    The Red Dog VIP mill optimization project. Part B: An integrated approach to modelling and design of the flotation plant

    By B. K. Gorain, A. W. Stradling

    "The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h

    Jan 1, 2003

  • CIM
    Concepts for Remote Mineral Projects

    By L. J. Vincze

    The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a

    Jan 1, 1980

  • CIM
    Flotation Circuit Analysis at Zinifex Century Mine

    By Dan Alexander, Ivan Crnkovic, Sarah Schwarz

    "Several plant studies have been conducted at the Zinifex Century Mine over the past 5 years. For each of the plant studies, surveys of the zinc primary circuit were conducted, characterisation measur

    Jan 1, 2008

  • CIM
    Factors Affecting the Dissolution of Gold from Refractory Flotation Tailings

    By H. U. Ross

    "INTRODUCTION Extensive studies have been carried on pure gold to determine the various factors that affect its dissolution in alkaline cyanide solutions. With the extension of milling to refractory o

    Jan 1, 1973

  • CIM
    Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)

    By C. S. Maggs, L. Shwydiuk, H. W. Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    Jan 1, 2003

  • CIM
    Continuous Training – Insurance for Sustainable Operation

    By Richard Phiri, Mike Milupi, Jackson Kapobe, Anton Lemmer, Charles Mazala

    Sustainability of plant operations in a rapidly changing mining environment requires a well-trained workforce to ensure smooth running of operations. To ensure availability of trained labor, Mopani Co

    Jan 1, 2019

  • CIM
    The Post-Failure Characteristics of Rock - Pt 1: Intact and Broken Rock

    By T. G. Joseph

    A strain-softening constitutive relationship is introduced that describes the post-failure stress-strain curve for rock regardless of whether the rock is intact or broken. The core of this relationshi

    May 1, 2002

  • CIM
    Nickel production from low-iron laterite ores: Process descriptions

    By R. A. Bergman

    "Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge

    Jan 1, 2003