Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Optimization of Microwave-Ultrasound Assisted Leaching of Copper Anode Slime Based on Central Composite Design

    By Z. Y. Ma, H. Y. Yang

    The process of microwave-ultrasound assisted leaching of valuable metals from copper anode slime was proposed in this paper. Design of experiments has been used to study the effect of the main leachin

    Jan 1, 2014

  • CIM
    Safety and training

    By Richardson A. H.

    "IntroductionSafety and training in the mineral industry will always be issues that are hotly debated and discussed.The nature of the mining industry, where people and equipment work in close quarters

    Jan 1, 1989

  • CIM
    Successful energy management

    By D. Berkley

    "Economic and environmental constraints drive more and more industrial organizations in using energy management as one of the means for addressing these issues. The recent increase in energy price cou

    Jan 1, 2005

  • CIM
    Pyrrhotite Rejection at the Strathcona Mill

    By J. Coffin, M. Muinonen, D. Fragomeni, R. Multani, C. Deredin

    "Rejection of pyrrhotite from pentlandite is of critical importance to the economics of nickel concentrate production and the main goal of the Strathcona milling operations. A joint team of XPS, Glenc

    Jan 1, 2018

  • CIM
    The Application of Cementation in Mining

    By Lionel A. York

    THE first application of the cementation process took place in the year 1864, according to H. Standish Ball, when a break in the brickwork lining at a depth of 270', in one of the Rhine Preussen pits

    Jan 1, 1961

  • CIM
    Mount Isa Mines Necessity Driving Innovation

    By N. Aslin, G. Heferen, H. DeWaal

    "Mount Isa Mines (MIM) acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry starting in the 1978’s through until the early 2000’s.

    Jan 1, 2018

  • CIM
    The Murray Deposit, Restigouche County, N. B. A Geochemical--Geophysical Discovery

    By H. W. Fleming

    In 1955, the results of a regional, geological interpretation of the northern portion of New Brunswick were used as a basis for selecting, for intensive exploration, three areas in which structural an

    Jan 1, 1961

  • CIM
    Energy Considerations in Iron Ore Pelletizing

    By S. S. Sephton, Kirit C. Vyas, Melvin J. Greaves

    Energy requirements for various pelletizing systems are considered from a fuel and power aspect, with the presentation of typical energy heat balance flow sheets. A partial calculation for the firing

    Jan 1, 1976

  • CIM
    Evaporation Losses from Crude Oils

    By J. W. Gregg, P. M. Dranchuk, D. L. Flock

    "From preliminary investigations it has been observed that although evaporation losses may be estimated by comparing single values of certain physical properties of crude oils and their evaporation re

    Jan 1, 1960

  • CIM
    Reduction of Arsenic Releasing In Aqueous Environment by Scorodite Encapsulation

    By S. D. F. Rocha1, L. Katsarou, G. P. Demopoulos

    "Crystalline scorodite (FeAsO4·2H2O) has been pointed out as the most stable compound to immobilize arsenic for disposal due to its good stability performance according to EPA’s TCLP test. However, in

    Jan 1, 2012

  • CIM
    Formability and Friction Evaluation of 6000 Aluminum Grades

    By Jamie N. Burdeski, Susan E. Hartfield-Wünsch

    Aluminum sheet use has been steadily increasing in the automotive industry to achieve mass reduction and improve fuel economy. One significant manufacturing challenge for aluminum sheet implementatio

    Jan 1, 2015

  • CIM
    Pneumatic Backfilling With Crushed Rock at the Sullivan Mine

    By J. W. Reynolds

    Use of crushed waste rock recovered by sink-float separation from normal ore production for backfill is an established procedure at Commco's Sulhvan mme, Kimberley, British Columbia. Need for a safe m

    Jan 1, 1972

  • CIM
    Downsizing: a consultant's perspective

    By John Stoten

    "The 1980s have proven extremely difficult years for many resource-based organizations. Mining companies have learned how to weather the negative effects of inevitable economic cycles. However, with s

    Jan 1, 1989

  • CIM
    Prospects for Canada's asbestos industry

    By A. Ignatow

    "A review is made of some of the principal factors and conditions that are, and will be, important to the over-all market climate for asbestos fibre and for the future of Canada's asbestos indust

    Jan 1, 1985

  • CIM
    Development of a Low-Carbon Calcium Aluminosilicate Binder for Gold Mine Tailings Backfill.

    By Farzaneh Abedini, Narain Hariharan, Lucas C. McFarlane, Nikolas A. Romaniuk, Tiffany Thayne

    The use of dewatered mine tailings as backfill material (commonly referred to as ‘paste’ backfill), is the most practiced form of backfill in Canada providing significant environmental benefits by red

    May 4, 2025

  • CIM
    Synthesis of Scorodite Coated in-Situ with Hydrated Ferric Oxide and its Leaching Stability

    By Pingchao Ke, Zhihong Liu

    "To overcome the problem that scoroditeis not stable in neutral and alkaline solutions, we proposed and investigated a synthesis method of scorodite coated in-situ with hydrated ferric oxide in the Fe

    Jan 1, 2017

  • CIM
    Recent Developments in Gold Milling Practice

    By W. B. Timm

    Introduction In preparing this paper on Recent Developments in Gold Milling Practice, the idea occurred to me that possibly the best way to deal with the subject would be to take you in thought on a

    Jan 1, 1935

  • CIM
    The Cablebolting Cycle —Underground support engineering

    By D. Jean Hutchinson, Mark Diederichs

    "Cable bolts are an important support component in modern underground mines. If an optimized cable bolt system is to be achieved, it is insufficient to focus on cable bolt layout design or on cable bo

    Jan 1, 1996

  • CIM
    1-Rock-Bursts at the Teck-Hughes Mine

    By J. D. Christian

    WHEN mining development began in the Kirkland Lake camp, twenty-five years ago, there was very little information obtainable from surface showings as to the nature of the ore deposits. A length of alm

    Jan 1, 1939

  • CIM
    A Success Path from Process R&D to Commercial Plants

    By A. Tohn, L. May, Adham. K.

    The path from process conception to commercial implementation poses significant technical, economic, and sometimes political challenges for every project team. Solving the technical challenges typical

    Jan 1, 2011