How To Ensure Seismic RequirementsBy A. Fuerst
The recent seismic events have shown that earthquakes have an immense destructive power. Chile was hit in February 2010 with a seismic intensity of 8.8 on the Richter scale, and had loss of about 700
Jan 1, 2012
-
Preventing Injuries Caused By Unrecognized Stone Mine Roof Beam Failures with A Pro-Active Roof Control Plan (85d735da-d993-4220-8da3-ce267d853005)By C. S. Compton, T. E. Marshall, D. R. Dolinar, R. Grau, L. J. Prosser, A. T. Iannacchione, D. C. Oyler
Unrecognized roof beam failures resulted in 69% of the falls of ground injuries occurring in underground U.S. stone mines from 1990 to 1996. Field investigations at 45 underground stone mines suggest
Jan 1, 1999
-
Vendors Show Off Latest in Mining Technology at SME ExhibitBy Georgene Renner, William R. Yernberg, Steve Kral
ABB offers complete electrical revamps of mining shovels with ac or dc drives, drive control, frequency converters with insular gate bi-polar transistor technology, intelligent control packages and vi
Jan 1, 2005
-
The Candelaria Concentrator Expansion ProjectBy D. L. Ogonowski, J. O. Marsden
The Candelaria copper-gold mine is located approximately 25 km south and east of Copiapo in Region III, Chile. The original concentrator was designed to treat 28,000 t/d (30,800 stpd) of chalcopyrite
Jan 1, 1999
-
Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? IntroductionBy A. Jennings
[ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran
Jan 1, 2012
-
Handling Infiltration Into Underground StructuresBy Edward D. Graf
Once the heavy work of mining, supporting and completing an underground structure is finished, there is frequently the problem of handling unwanted water infiltration into the opening. Methods of cont
Jan 1, 1987
-
Challenges and Opportunity in Modelling and Simulation of Mineral Processing SystemsBy K. V. S. Sastry, K. D. Lofftus
Mathematical modeling and computer simulation are two valuable quantitative tools that are being effectively applied to mineral process- systems. This paper presents an up-to-date assessment of proces
Jan 1, 1989
-
Hydrologic Assessment Of Waste Rock Stockpiles: A Case Study From Ajo Mine, ArizonaBy A. L. Williamson, G. Savci
Hydrologic assessments of existing and proposed waste rock stockpiles (WRS) are typically required for application of operating and closure permits at mine sites. The results of these assessments can
Jan 1, 2002
-
Pumping and DrainageBy Christopher J. Bise
INTRODUCTION The control of nuisance water in a mine is extremely important; left uncontrolled, nuisance water can have a severe effect on haulage, ventilation, production, and the health and safe
Jan 1, 1986
-
Ion Exchange Resins Tailored For Effective Recovery And Separation Of Rhenium, Molybdenum And Tungsten - IntroductionBy M. Mikhaylenko
Rhenium, molybdenum and tungsten are the elements demanded by high-end technologies. These metals are found in process solutions in forms of their oxyanions: ReO4-, MoO42- and WO42-. The later two
Jan 1, 2012
-
Reducing The Fire And Explosion Hazards Of Flame Cutting And Welding In Underground Coal Mines - Preprint 09-007By W. D. Monaghan
Flame cutting and welding is one of the major causes of fires and explosions in underground U.S. coal mines. On May 20, 2006, a flame cutting operation at the Darby Mine No. 1 led to an explosion tha
Jan 1, 2009
-
Mine Health and Safety at the Turn of the MillenniumBy Raja V. Ramani
As the new millennium approaches, it is appropriate to assess the progress that has been made in mine health and safety, a matter of concern to management, labor and government. One can hardly look a
Jan 1, 1999
-
Square Set Timber in Load-Haul-Dump Stopes at the Bunker Hill Mine, Kellogg, IdahoBy John Songstead
INTRODUCTION The Bunker Hill mine, located at Kellogg, ID, in the Coeur d'Alene mining district, has been a major pro¬ducer of lead-zinc-silver ore since 1887. Since its dis¬covery, it has produ
Jan 1, 1982
-
Importance Of Geotechnical Field Mapping In Assessing The Stability Of Underground ExcavationsBy A. Adu-Acheampong
Stope instability at Ashanti Goldfields Company Ltd. (AGC) is a major concern. Using information from field mapping, major discontinuity sets were defined, Rock Quality Designation (RQD) was determine
Jan 1, 2003
-
Study On Leaching Vanadium From Roasted Residue Of Stone CoalBy D. He
In China, the total reserves of vanadium, reported as V2O5, in stone coal is 118 Mt (130 million st). Recovering vanadium from such a large resource is very important to China?s vanadium industry. The
Jan 1, 2008
-
Analysis Of A Dense-Medium Separator For Coarse Coal Separation Using Computational Fluid DynamicsBy F. F. Peng
The raw-coal feeding system and the upward medium current flow in a dense-medium vessel (DMV) are, in addition to the residence time of particles in the separator, important factors for efficient coar
Jan 1, 2007
-
Design Considerations For Structures To Be Built On Subsidence Prone LandBy R. D. Begley
This paper will present detailed design drawings of a flexible single floor residential superstructure proposed for both longwall and room and pillar mining conditions. All efforts were made to provid
Jan 1, 1986
-
Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, ORBy Niels Kofoed
Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM
Jan 1, 2011
-
Preventing Injuries Caused By Unrecognized Stone Mine Roof Beam Failures With A Pro-Active Roof Control Plan (0c7b539f-811b-45a7-99b1-58337aa78aec)By A. T. Iannacchione
Unrecognized roof beam failures resulted in 69% of the falls of ground injuries occurring in underground U.S. stone mines from 1990 to 1996. Field investigations at 45 underground stone mines suggest
Jan 1, 1999
-
Engineering Geology Of The Mica Underground PowerplantBy Douglas D. Campbell, Alan S. Imrie
INTRODUCTION Mica Dam is located on the Columbia River just downstream of the "big bend" of the Columbia, where it leaves the Rocky Mountain Trench and begins to flow southwards, approximately 85 m
Jan 1, 1976