Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Collapse and Remining of Tunnel TO8 at THSRC Contract C230By William Stewart, John Tinkler, Gary B. Hemphill
Of the 345 km long Taiwan High Speed Rail Project, connecting the cities of Taipeiand Kaohsiung, the 23 km alignment on Contract C230 required the construction of5755 m of shallow mined tunnels rangin
Jan 1, 2005
-
Extreme Multiple Seam Mining in the Central Appalachian Coalfields (8129456e-a9ee-4edc-84af-bd34aa808bd3)Coal has been mined in the central Appalachian coalfields of southern West Virginia, western Virginia, and eastern Kentucky for more than a century. The dwindling reserve base consists in large part
Jan 1, 2006
-
Tailings Paste Disposal ? More Than Water RecoveryBy S. Slottee
The technology of making and using ?paste? from mine tailings is increasingly well known by the minerals industry. The primary applications are water recovery and ?stacking? of tailings with minimal
Jan 1, 2011
-
Phased Approach to Stormwater Tunnel RehabilitationBy Todd Wanless
This paper addresses the challenges experienced by the designer and three government agencies during implementation of major improvements for the Turkey Creek Tunnel in Kansas City, Kansas. The tunnel
Jan 1, 2008
-
Minnesota Mining Boasts Another Boom YearBy William R. Yernberg
The combined 80th Annual Minnesota Section of SME Meeting and 68th Annual University of Minnesota Mining Symposium was held April 17 and 18, 2007, in Duluth, MN. About 350 mining industry professional
Jan 1, 2007
-
The Northwest Side Relief Sewer Tunnel—Challenges Became Success StoriesBy Faruk Oksuz, Clay Haynes, Miguel Sanchez, Patrick Finn, Roger J. Maurer
The Milwaukee Metropolitan Sewerage District’s (MMSD)’s challenges of basement flooding and wet weather sewer overflows are being creatively addressed with the Northwest Side Relief Sewer tunnel. The
Jan 1, 2005
-
Ventilation and atmosphere control inside a 3-bar compressed air TBM headingBy B. R. Zernich
Advances in tunneling technology, such as Earth Pressure Balance and Slurry Shield methods, have allowed the tunneling industry to construct tunnels in increasingly difficult ground conditions. In rec
Jan 1, 2009
-
Finding Added Value At Newmont Through Large-Scale Mining Sequence, Cutoff Grade And Process Optimization Using Mixed Integer Linear ProgrammingBy L. Clark
Despite near-record commodity prices, the mining industry continues to search for ways to maintain profits in these times of steadily increasing energy prices and steadily decreasing grades. The pres
Jan 1, 2007
-
Port of Miami Tunnel Update?A View From Design Builder?s EngineerBy Wern-ping Chen
Technical and non-technical challenges exist in each mega infrastructure project. It?s no exception to the first US underground PPP Port of Miami Tunnel (POMT) project in Miami, FL. The POMT will conn
-
Haile Gold Mine Metallrgy And Flowsheet ReviewBy J. Wickens
Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through sev
Feb 27, 2013
-
Use Of Geologic Parameters For The Development Of Low-Grade Copper Reserves, Silver Bell Mine, AZBy Q. J. Browne, M. A. Miller
Silver Bell produces about 22,000T of fine copper annually from low-grade chalcocite and oxidized copper ore that is recovered by sulfuric acid leaching and SX-EW processing. The current mineable res
Jan 1, 2002
-
Northern Ontario Pushes to Expand Mining InvestmentBy Steve Kral
The mining industry in northern Ontario is known mostly for its huge nickel deposits. Inco’s and Falconbridge’s nickel mines in the Sudbury Basin are the best known. And with nickel prices being wha
Jan 1, 2006
-
Heap Leach Gold Production ModelingBy M. Irish, M. Jahraus
Accurate prediction of gold (or other metal) production from a heap leach operation is essential to the economic vitality of any such operation. However, this is also one of the most challenging issu
Jan 1, 2001
-
Life Of Mine Schedule From Multiple Pits: A Case Study For The Tenke Fungurume Mining DistrictBy R. Benito
This paper describes the development of a life of mine schedule (LOM) for one of the world?s largest known sedimentary Copper-Cobalt districts located in the Katanga Province, Democratic Republic of C
Jan 1, 2011
-
Tribute To J. Robert WoolseyBy Michael Cruickshank
Bob Woolsey was born in 1936 in the state of Georgia and grew up to be a man of great integrity, vitality, wisdom and charm, totally neutral on matters of race, gender, and religion. A true Southern G
Jan 1, 2008
-
Coal Pillar Strength Based On The Ground Reaction Curve ? A New ApproachBy Kazem Oraee
In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i
Jan 1, 2009
-
Tracer Gas Techniques For Mapping Air And Methane Migration Through A Longwall Waste In An Underground Coal Mine Using Tube Bundle SystemsBy G. W. Bonnell, D. A. Young, D. G. Genter
Through 1996 and 1997, CANMET and the Cape Breton Development Corporation (CBDC) conducted a project to study the Phalen Mine’s 7 East longwall ventilation network to help determine methane emission p
Jan 1, 2001
-
New Technology Changes Blind Shaft DrillingBy Alan Zeni
Blind shaft drilling equipment has not changed substantially since the 1970s. Since it resides in a niche market between conventional shaft sinking and raise boring, the relatively small demand has re
-
Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension TunnelsBy Christophe Bragard
The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project
Jan 1, 2008
-
East Side Access - Segmental Lining Design Challenges for Closely Spaced and Shallow TunnelsBy D. I. Smith
Constructing tunnels in congested urban areas requires tunnels to be placed closer together and with less cover than was previously necessary. Contract CQ031 of New York?s East Side Access project wil
Jan 1, 2008