Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Recent Developments In The Law Of Deep Foundations
By Brian P. Waagner
Construction law in general and the law of deep foundations in particular continues to develop rapidly, particularly in the areas of risk allocation. Public and private owners are increasingly using c
Jan 1, 2002
-
The Use of Seismic Trace Characterization to Guide the Analysis of DST Results to Obtain More Accurate Soil Parameters
By Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is a very popular applied seismology site characterizing tool within geotechnical engineering. A challenging aspect of DST is to characterize the acquired seismic data s
Jan 1, 2018
-
New Concepts For CFA (Auger Cast) Pile Controle - Synopsis
By Shachar Magali
This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique
Jan 1, 2000
-
Case History: Estimating Ground Vibrations Caused By Pile Driving
By Tracy Brettmann
A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat
Jan 1, 1999
-
Carbon Footprint Of Common Quay Structures
By Dr Karsten Galipp, Kai-Julian I. Hendler, Prof. Manuel G. Pinheiro, Dr Peter J. Bourne-Webb
With a share of approximately 11% of global greenhouse gas emissions, the construction industry contributes significantly towards climate change. This is why construction projects should not only be a
May 1, 2022
-
Deep Soil Stabilization Using Lime Cement Columns - Synopsis:
By Melvin I. Esrig
Lime Cement column stabilization of soft clay and sand in Salt Lake City, Utah and in San Francisco California is described and discussed. Stabilization permitted the construction, in a single stage,
Jan 1, 2000
-
An Unusual Permanent Shoring Job
By Gordon Demetrick
3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi
Jan 1, 1987
-
Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis
By D. K. ] [Gupta
The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and
Jan 1, 1996
-
Some Experience With Large Diameter Caissons ? Synopsis
By I. H. Wong
The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee
Jan 1, 2010
-
What Causes Piles To Penetrate - Introduction
By George G. Goble
In the middle of the nineteenth century, the dynamic formula appeared as a description of pile penetration during impact driving. The simplicity of use of the formula combined with the power of the en
Jan 1, 1995
-
Press-In Piling: The Influence Of Plugging On Driveability - 1 Introduction - 1.1 Urban Construction Of Deep Foundations
By David J. White
The decreasing availability of land in urban areas, and the increasing demand for urban development is leading to the construction of taller and heavier buildings at increasingly marginal sites. Such
Jan 1, 2000
-
High Mobility Grouting Prevents Historic Fountain from Sinking
By Brian M. Fraley
"Portions of the Catholic Total Abstinence Fountain in Fairmount Park in Philadelphia, Pa., were in “imminent danger,” according to a restoration services request for proposals (RFP) issued by the Cit
Jan 1, 2017
-
High Capacity Drilled Cast-In-Place Piles, House Of Representatives Building, Lansing, Michigan - Summary
By Robert C. Rabeler
Soil and Materials Engineers, Inc. (SME) has utilized drilled cast-in-place (D-CIP) piles on a number of projects in the midwest. These foundation systems have typically consisted of drilling an 8 to
Jan 1, 1999
-
Design and Delivery of Micropile Installation Leveraging Augmented and Virtual Reality
By Guilherme L. M. G. Carvalho, Zachary T. Fleming
In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser
Jan 1, 2019
-
Ground Movements - A Hidden Source Of Loading On Deep Foundations (211df4c9-c07d-4182-8335-8f47bcc59b12)
By Harry G. Poulos
Ground movements can arise from a large number of sources and can have a significant effect on nearby piles and deep foundations. The loading of the piles by ground movements is a different mechanism
Jan 1, 2007
-
Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2002
-
South 196th/200th Street Corridor And Bridge Crossing, Kent, Washington
By James Su
The Green River Valley in Kent, Washington, is a fast growing area containing retail facilities, warehouse factories and industrial businesses, including the Boeing Space Center. Traffic from Intersta
Jan 1, 1998
-
Diaphragm Walls for Seepage Control and Remediation: Three Case Histories
By Fabio Santillán, Mario Mauro, Raffaella Granata
"This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis
Jan 1, 2016
-
History Of Foundation Pile Driving Hammers In New York City, 1900 To 2000 - Summary
By James S. Graham
Foundation pile driving hammers used in New York City in the past 100 years have been drop, steam, compressed air, diesel, and hydraulic. In 1992, the first hydraulic hammer in the New York City area
Jan 1, 2000
-
Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? Background
By Colin C. West
On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p
Jan 1, 1987