Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Use Of Large Diameter And Long Steel Pipe Piles In Japan ? SynopsisBy K. Kawakami
In Japan, pile foundations have been used extensively for buildings, bridges and port facilities. A large number of steel pipe piles were first used in the 1960's and the amount of steel used in
Jan 1, 2010
-
Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic TestBy Liqun Liang
Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and
Jan 1, 2011
-
Capacity Of Piles And Settlement Of Pile FoundationsBy M. Mets
Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo
Jan 1, 2000
-
Deep Mixing Method: A Global PerspectiveBy Donald A. Bruce
Various types of contemporary Deep Mixing Method (DMM) techniques have been used in the United States since 1986. Such techniques owe their origins to Japanese and Scandinavian developments, which beg
Jan 1, 1998
-
Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway BridgesBy Kouichi Tomisawa
Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri
Jan 1, 2006
-
Use of Menard Pressuremeter Test Results to Predict a Bearing Capacity and Settlement of Bored PilesBy Ramdane Bahar
"Abstract The design foundations can be performed using Menard pressuremeter rules that require a limit pressure and a pressuremeter modulus. In recent years, another trend of interpretation of this t
Jan 1, 2014
-
Advantages of Design in Drilled Displacement Type Piles in Tropical Porous Soil DepositsBy Jean R. Garcia, Paulo J. R. Albuquerque, Renato P. Cunha, Osvaldo Freitas Neto
"Abstract Results obtained from in-situ load tests carried out on drilled displacement piles sunk in a porous, lateritic and unsaturated soil deposit, are analyzed in this paper. Three slow-maintained
Jan 1, 2014
-
A Historic Capitol And A Deep ExcavationBy Richard F. Sliwoski
The Virginia State Capitol was designed by Thomas Jefferson and constructed in 1785. The Capitol is of great historic and architectural significance to not only the Commonwealth of Virginia but to the
Jan 1, 2006
-
Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :By Virendra Singh
The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic
Jan 1, 1996
-
Man - Organisation - Technology - Proposals For Optimising Preventive WorkBy Walter Ensinger
Working safely means working cost-effectively. Every "dangerous occurrence" and - even more so - every industrial accident causes disruptions in the planned course of construction. Besides moral and l
Jan 1, 2006
-
A Theoretical Study Of Underpinning Of Rigid Circular Foundations By Piles ? SynopsisBy M. Makarchian
Existing buildings sometimes experience excessive settlement under their design loads, or due to increased foundation loading, if a change of building use is required. One of the oldest and widely num
Jan 1, 1996
-
Analysis of Plugging Effect for Open-Ended Piles in Sandy SoilBy Sangseom Jeong, Moonkyung Chung, Junyoung Ko
"Abstract The plugging effect of open-ended piles in sandy soil is analyzed by full-scale field test and plugging measurement. PLR (plug length ratio) measurement data from 144 field cases are analyze
Jan 1, 2014
-
5 Pile Testing - Pile TestingBy George Goble
I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is
Jan 1, 1994
-
The Quality Control Of Pile Foundations Of Tall Buildings In ShenzhenBy Li Keqiang
Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on
Jan 1, 1991
-
Spring Constants of Belled Caissons for Seismic Retrofit of an Existing Critical Structure in a Seismically Active AreaBy David E. Albus, Ahmadreza Mortezaie, Bidjan Ghahreman
The structural evaluation of seismic performance of an existing hospital in Long Beach, California, required spring constants of foundation elements. The structure included support by deep foundation
Jan 1, 2018
-
Analyzing Drivability Of Open Ended Piles In Very Dense SandsBy James A. Schneider
The successful installation of long piles driven into very dense sands relies on the occurrence of the reduction in local friction with increased pile embedment, a phenomenon known as ?friction fatigu
Jan 1, 2010
-
Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? SynopsisBy G. Price
The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less
Jan 1, 2010
-
Helical Pile Foundation Anchors As A Practical AlternativeBy Dilip Khatri
Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ
Jan 1, 2003
-
Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? IntroductionBy Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990