Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Correlation Between Ascending Mining and Stability of the Overlying Strata

    In the process of mining the lower seam in a multi-seam operation, a lot of oblique fract- ures appeared in the upper seam which was in the equilibrium zone. These fractures closed soon after the l

    Jan 1, 1986

  • AUSIMM
    Disclosure - Resource/Reserve Statements - Moving into the Nineties

    The equity market is now very much within a global village environ- ment, with various exchanges acting as agencies for the big casino. In this predicament, mining companies, who provide the most ext

    Jan 1, 1988

  • AUSIMM
    Methane Gas Emission and Recirculation in the Use of Scrubbers for Dust Control in Development Headings and Longwall Operations

    By Liu Y

    Mathematical modelling of scrubbers in development and longwall operations in underground mines produces useful results. Mathematical modelling on the mounting of scrubbers on longwall supports shows

    Jan 1, 1995

  • AUSIMM
    Application of Mineral Processing in Waste Treatment and Scrap Recycling

    Proceeding from statistical data on the development of waste volume, an endeavour was made to characterise waste materials with regard to the applicability of treatments based on mineral processing.

    Jan 1, 1993

  • AUSIMM
    Establishing a Sustainable Competitive Position at Hilton Mine

    Mount Isa Mines' Hilton Mine was brought into large-scale production in 1990/91 at a time of sharply falling metal prices. To ensure the operation's survival and eventual prosperity there

    Jan 1, 1993

  • AUSIMM
    Post-Permian Subsidence and Tectonics, Vulcan Sub-Basin, North West Shelf, Australia

    Tectonic subsidence plots have been calculated for well, extrapolated-well and significant off-well (seismically-based) locations in the Vulcan Sub-basin and adjacent highs (western Timor Sea). The su

    Jan 1, 1990

  • AUSIMM
    Computer Generated Three-dimensional Block Models as a Guide to Mineral Exploration - Analysis of Structural Controls on Mineralisation at the Central Extended Gold Deposit, Cracow

    Mining software packages are used extensively in industry for resource estimation as well as for mine design and operation. Research undertaken in the W H Bryan Mining Geology Research Unit at the U

    Jan 1, 1994

  • AUSIMM
    The Geology of the Wonthaggi Coalfield, Victoria

    By Knight J. L, Baker G

    The Wonthaggi coalfield is in South Gippsland, about 90 miles southeast of Melbourne. It is situated on the down-faulted block of the South Gippsland highlands that lies south of the Kongwak fault, be

    Jan 1, 1944

  • AUSIMM
    Rapid Three-Dimensional Modelling of Mine Geology - Structural Applications to the Globe-Progress Mine, West Coast, New Zealand

    By C McIntosh, M van Dam, N Whetter, R Lane, M McCulloch

    Mine geology is understood through synthesising large amounts of structural, lithological, geochemical and geophysical data derived from the original topographic surface, drilling and surfaces exposed

    Jan 1, 2009

  • AUSIMM
    A Zinc-Lead Ore Mine Water Contamination by a Paper Factory Fluid Waste

    By Motyka J, Adamczyk AF, Witczak S

    A case study of migration of a paper factory fluid wastes, on the distance of 5 km from an underground disposal site to an ore mine is presented. The ore mine in question, situated in SW Poland is

    Jan 1, 1988

  • AUSIMM
    Hydraulic Coal Mining - Development in New Zealand

    Hydraulic transport of coal has been used for many years on the West Coast of New Zealand to extract small blocks of steeply dipping coal. Recent development at Strongman 2 Mine has seen the use of hi

    Jan 1, 1998

  • AUSIMM
    Use of Polymeric Agglomeration Aids to Improve Heap Leach Recovery and Profitability

    By Gross A. E, Neville P. C

    Over the last decade heap leaching with a cement binder has allowed the economical leaching of low grade gold ores of less than 2 grams/tonne. Despite the continued use of cement as an agglomeration

    Jan 1, 1994

  • AUSIMM
    Strategic Relationship of the Panguna Mine Sequence, Bougainville Island, Papua New Guinea

    By Finlayson E, Hilyard D

    1:100 000 geological mapping of Bougainville Island has resulted in refinement of stratigraphic subdivisions and relationships. We subdivide the sequence into basement Atamo Volcanics (Late Eocene-Ear

    Jan 1, 1990

  • AUSIMM
    Ore Reserve Estimation at Renison Tin Mine

    Computer-based block modelling of orebodies is now used at Renison Tin mine for the estimation of ore reserves. It is considered that this has resulted in improved reserve estimation for complex &apos

    Jan 1, 1990

  • AUSIMM
    A Second Derwent Crossing for Hobart

    Proposals for engineering works in the River Dement in recent years have been made in the context of very little geological informat- ion. Breakage of the Tasman Bridge, forced a complete re-apprai

    Jan 1, 1977

  • AUSIMM
    Sampling Practice at Prestea Goldfields Ltd of Ghana

    By Baafi EY, Appiah HK

    The Prestea Goldfields Ltd of Ghana, West Africa has produced over 170 t of gold with average grade of 11 g/t since 1912. The deposits occur in a wide shear zone which closely follow the Birimian-Tark

    Jan 1, 1976

  • AUSIMM
    Performance Improvement of Longwall Machinery

    An integrated mining equipment development organisation is typified by Deutsche Montsn Technologic of Essen, Germany. working on improvements in reliability, production and control in coal mines. Exam

    Jan 1, 1991

  • AUSIMM
    Current Project of the Geological Survey of Queensland in Northern Queensland

    By Kay JR

    In 1984 a new Regional Geological Mapping Program (RGMP) was commenced by the Geological Survey of Queensland (GSQ); the new program was in response to the withdrawal of the Bureau of Mineral Resource

    Jan 1, 1986

  • AUSIMM
    Burden, Spacing and Borehole Diameter at Rock Blasting

    Most text books on rock blasting claim that the relationship between burden and borehole diameter is linear. The statistical calculation presented here with real values from one hundred open pit and

    Jan 1, 1990

  • AUSIMM
    Raise Drilling - A Safe and Effective Method of Horizontal Tunnelling

    By Anderson K

    In 1991, the first horizontal raise drill hole in Australia was successfully completed by Australian Raise Drilling Pty Ltd (ARD) at the Perseverance nickel mine of Western Mining Corporation's (

    Jan 1, 1993