Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushersBy J V. Mehrabani, A R. Sayadi
Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul
Sep 26, 2011
-
Sustainability Reporting and Mining - An Assessment of the State of Play for Environmental IndicatorsThe global mining industry is perceived to be a world leader in sustainability reporting û with a 2008 Ernst & Young survey placing four mining companies in their top five performers in sustainabi
Jan 1, 2009
-
Modelling multi-seam interactions for longwall miningBy A Lines
This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan
Nov 30, 2018
-
Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network ApproachBy F M. Weir, M Fowler
The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc
Nov 5, 2014
-
Future Climate – Is Heat Stress a Real Risk for the Future and How Can We Better Manage It?By C Killip
Working in Australia’s harsh climate can have a significant impact on the health, safety and productivity of our teams, but is our working environment expected to be more prone to heat stress in the f
Nov 4, 2015
-
Ernest Henry Underground Mine – Access and Support Infrastructure DesignBy P Christen
The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in
Mar 21, 2011
-
Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern AustraliaBy D Timms
The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T
Aug 22, 2011
-
Orepass Loss Mitigation Approach in Malmberget MineBy A Salama, J Greberg, B Skawina
In today’s underground mass mining, the orepass is an important part of the infrastructure as it connects two or more mine levels and is used for conveying or storing large amounts of material. One of
May 9, 2016
-
A Case History of the Crusher Level Development at HendersonBy W D. Rech, K W. Keskimaki
As an integral part of the conversion from rail haulage to conveyor haulage at Henderson, over six kilometres of drifting and several large complex openings were mined. The deepest of these areas was
Jan 1, 2000
-
The basics of grinding circuit optimisationBy A Giblett, B Putland
This paper provides a simple guiding framework for grinding circuit optimisation, focussing on common themes in past optimisation success stories, the conditions for success and techniques that can be
Aug 29, 2018
-
Sustainable Steel Plant on an Environmental Protection AreaBy C A. Chaves
During most of its history, the metallurgical industry has been seen as a source of pollution for the environment. However, during the second half of the 20th century, as the world environmental legis
Jan 1, 2009
-
High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, PhilippinesBy C Harrison, A Bowskill
The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to
Sep 17, 2014
-
Practical Sampling for Online Analysis and Composite Samples of Slurries - The Art of CompromisesIn practice a sampling solution is a compromise of many requirements: the sample should be representative; the sampling system should also be reliable, less than 95 per cent availability rest
Mar 1, 2010
-
The Development of a Fan Range to Meet Increasingly Demanding Safety Criteria Inside TunnelsBy A G. Sheard
Fire safety requirements inside tunnels have become more demanding as tunnel designers consider the impact of potentially larger fires. Tunnel ventilation equipment is required to clear hot gases in t
Mar 8, 2011
-
Prediction of Yttrium, Lanthanum, Cerium and Neodymium Leaching Recovery from Apatite Concentrate Using Artificial Neural NetworksBy A H. Bagherieh, S Mesroghli, H Jorjani, S Chehreh Chelgani
The rare earth elements (REEs) assay and recovery in leaching processes is being determined using expensive analytical methods, ICP-AES, and ICP-MS. This paper presents a neural network model to predi
Jan 1, 2008
-
Design and testing of high capacity surface supportBy T Roberts, S Talu
Steel wire weld mesh is a common industry standard surface support used in underground mining, traditionally installed with mining drills during the bolting cycle. As underground mining depth and stre
Nov 30, 2018
-
Improvement in Iron Ore Agglomeration Through Design Modification in Coke Crushing PlantsBy B K. Da, S A. Balaji, G P. Roy, T K. Dutta
The raw material handling complex at the Durgapur steel plant provides iron ore, crushed coke and flux to two sinter plants. Either some facilities were not envisaged or not properly designed before t
Jan 1, 2005
-
Improving the Performance of Precipitator Tanks in an Alumina Refinery Using CFD ModellingBy A Manzoori, M T. Shadloo
This paper describes a CFD modelling study which was carried out to investigate possible improvements in the design of an alumina precipitator tank at the Jajarm plant of Iran Alumina Company. In part
Jan 1, 2006
-
Didipio Flash Flotation and Gravity Recovery CircuitBy M McGrory, A Rodolfo, J Paredes, L E. Manguba, K A Villaspir, G Webb, R Setiagani, H Cardenas
"OceanaGold’s Didipio operation has been in operation for three years. Integral to the flow sheet design is a flash flotation circuit treating a portion of cyclone underflow, consisting of an Outotec
Oct 10, 2016
-
Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level caveBy P Nichols, C te Kloot, A Harrison
Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/
Nov 21, 2018