Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Contrasting Styles of Gold Mineralization along the Grand Pabos-Restigouche Fault System: Implication for Carlin-like Au-mineralization in the Southwestern Gaspé Appalachians

    By André Chagnon, Michel Malo, Benoît Dubé, Chantal Pelchat

    "Abstract- In the southern Gaspé Appalachians, gold mineralization is spatially associated with the Acadian dextral strike-slip Grand Pabos-Restigouche fault system. Two different structurally-control

    Jan 1, 1998

  • CIM
    Designing of the Grinding and Classification Systems for Increasing the Concentrate Iron Grade in 4th Production Plant at Golgohar Mining and Industrial Company

    By Jamal Jafari, Abbas Sam

    "The concentration of the fourth production line at Golgohar includes 66% iron with Blaine number of 500 cm2/g. For pelletizing process, the feed iron grade should be greater than 68% with minimum Bla

    Jan 1, 2016

  • CIM
    Research on the Comparison of Operator Viewpoints Between Manned and Remote Control Operation in Unmanned Construction Systems

    By Akihiko Nishiyama

    Unmanned construction technology used for remote control operation of construction machines has some problems to solve compared with manned operation of construction machines, such as fatigue due to l

    Aug 1, 2013

  • CIM
    Cathodic electrodeposition of protective zirconia coatings

    By I. Zhitomirsky, X. Pang

    The outstanding thermal and chemical stability, excellent mechanical properties and biocompatibility of zirconia have made this material an important candidate for fabrication of advanced protective c

    Jan 1, 2004

  • CIM
    Flowsheet development, commissioning, and start-up of the Voisey’s Bay mill

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017

  • CIM
    Analyzing Building Information Using Graph Theory

    By S. Isaac

    The networks of interdependencies between elements in building projects, referred to as the project topology, are often complex and difficult for project teams to comprehend. It is hypothesized that a

    Aug 1, 2013

  • CIM
    The Silver Mining Industry in Canada

    By Arthur A. Cole

    Although the metal silver has been known and prized from very ancient times, it is in the New World that the greatest silver camps have been found. This is shown in the following comparison: [] For

    Jan 1, 1927

  • CIM
    Applied Environmental Forensic Science: Brazilian Illegal Mining Cases

    By Rodrigo Craig Cerello

    The Brazilian economy has always presented a strong correlation with the mineral activity. Since colonization days, due to the territorial expansion caused by the explorers search for gold, mining in

    Aug 1, 2013

  • CIM
    Computer Simulator of Slag Cleaning in an Electric Furnace

    By A. Warczok

    The computer simulator of slag cleaning in an electric furnace is based on a set of mathematical models describing heat liberation, the rate of slag reduction and gravitational coalescence of matte an

    Jan 1, 2007

  • CIM
    Backfilling at the Sullivan Mine

    By C. D. M. Chisholm

    IN discussing stope filling, or backfilling, at the Sullivan mine, at Kimberley, B.C., a brief description of the problem will first be presented. The Sullivan orebody is a replacement in quartzite, w

    Jan 1, 1941

  • CIM
    Modification of Feeding System for the Smelting Furnace and Other Recent Improvements at Gresik Copper Smelter

    By Kenta Kusunose, Dadang Sundana, Ahmad Munib Fikry, Yosuke Unno

    PT Smelting has operated the Mitsubishi Process in which feed materials are charged into the S- furnace through top lances using a pneumatic conveying system comprising 6 feeding tanks (S-Feeding Tank

    Jan 1, 2019

  • CIM
    Maximizing the Overall Effectiveness of Teleoperated Underground Loading and Haulage Equipment

    By Jacek Paraszczak

    Possibility to move human workers away from dangerous places ?enhanced safety and improved working environment; ? Increase of actual operational time: ? Less losses due to shift changes, regulatory

    May 1, 2010

  • CIM
    The Gwillim Gold Mine and Its Geological Setting

    By J. Guha, el, G. Bouchard, W. Zuckerk, J. Carignan, G. Archambault

    The Gwillim Mine, located 8 km northwest of Chibougamau, is underlain by two mafic volcanic cycles separated by a dominantly felsic cycle. These rocks are part of the Gilman Formation of the Roy Group

    Jan 1, 1984

  • CIM
    Strength Development and Characteristics of Sodium Silicate-fortified Sand Pastefill/The Effect of Binder Content, Sodium Silicate Concentration, and Pulp Density

    By M. Razavi

    This investigation is part an overall investigation on the effect of sodium silicate on the properties of the mine backfill. The results presented will highlight the effects of binder dosage, sodium s

    May 1, 2007

  • CIM
    Failure Mechanism and Damage Characterization in Axially Crushed AIMg3.5mn Aluminium Tubes

    By H. R. Shakeri, R. Mayer, M. J. Worswick, A. Rahem

    The current focus of research and development in transportation industry is to use lightweight materials such as aluminium alloys for more structural components. In this regard, maintaining safety of

    Jan 1, 2006

  • CIM
    New Miner Training Program

    By Denis Beaudoin

    Program Basics: Goals, Course Content & Training Process Sudbury: History of the Program & Lessons Learned Diavik: History of the Program & Lessons Learned Most Recent Program: Totten Mine in partn

    Oct 1, 2010

  • CIM
    Effect of GA on the Wettability of CUGA10 on 304L Steel

    By S. Pauly, U. Kühn, J. Eckert, I. Kaban, G. Wiehl, F. Silze

    In the present work, the effect of Ga on the wetting behavior of the Cu-rich braze filler CuGa10 (wt.%) on the steel 304L was investigated. For this, the macroscopic and microscopic effects governing

    Jan 1, 2014

  • CIM
    Fine sizing by Cyclosizer and micro-sieve

    By M. Leroux, J. A. Finch

    "Sizing below 38 µm (400 mesh) is an increasing requirement in mill testing laboratories. The Cyclosizer is gaining wide acceptance in this role. A recent alternative is to use electro-formed sieves (

    Jan 1, 1982

  • CIM
    Risks Analysis for Ventilation Network Optimisation Processes in Kazakhstan Metal Mines

    By A. Karzhau, B. Aldamzharov, Y. Tussupbekov

    "This case study produced for the metal mine operating in Kazakhstan, which has ventilation controlled manually and working continuously at maximum speed to keep air flowing through each part of the m

    Jan 1, 2019

  • CIM
    Recent Mineral Discoveries in Western Quebec

    By A. O. Dufresne

    The mineral wealth of pre-Cambrian rocks in Canada has been the subject of much study by geologists and engineers (members of this Institute), particularly so in the past few years, following discover

    Jan 1, 1926