Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Osborne Deposit

    The Osborne copper-gold deposit (within the Trough Tank project area) is located in the Cloncurry Shire about 195 kilometres south-east of Mount Isa. It is hosted by Proterozoic metasediments of the E

    Jan 1, 1993

  • AUSIMM
    Assessment of Options for Economic Processing of Preg-Robbing Gold Ores

    By K Buda, W Staunton, M Hill, V Tjandrawan

    One of the challenges facing the gold industry in the 21st century is the continuing need to identify new reserves of economically treatable ores. Discoveries of large, metallurgically simple orebodie

    Jan 1, 2007

  • AUSIMM
    Trial of 14/12 millMAX <sup>TM</sup> Pump in the Ok Tedi Grinding Circuit

    By O K. Paki

    A 14/12 millMAXTM pump was installed in the SAG1 grinding circuit as a trial replacement for the existing 12/10 Warman for performance comparison and in an attempt to overcome process difficulties. Kr

    Jan 1, 2000

  • AUSIMM
    Mining Ironstone at Iron Knob

    SITUATED in the county of Manchcster, in Northern Eyre&apos;s Peninsula, the Iron Knob ore-deposits form the basis of the industry. These deposits are connected by the Iron Knob tramway to the port of

    Jan 1, 1930

  • AUSIMM
    Geology of the Tavua Goldfield, Viti Levu, Fiji

    CONTENTSSummaryIntroductionGeographical and Geological Outline of the RegionGrowth of the Mining IndustryTable 1: Production StatisticsGeneral GeologyRecent Alluvium and River GravelsSambeto SeriesMud

    Jan 1, 1953

  • AUSIMM
    Analysis of Lead/Zinc Concentrator Flotation Performance at Mount Isa Mines Limited

    By Watsford RMS, Wickham P

    In October 1980 the two existing flotation circuits were combined into a single new circuit. This circuit used modern 11.3 m3 flotation cells which replaced 1.4 m3 units. Sometime after this change

    Jan 1, 1978

  • AUSIMM
    Site Investigation Drilling on the Derwent River

    By Billingham R

    The Department of Mines Tasmania employs a Drilling Section for specialised drilling re- quired by government and semi-government bodies. The section has a complement of nine crews oper- ating auger

    Jan 1, 1977

  • AUSIMM
    Submerged Combustion Technology* Applied to Copper Slag Treatment

    By Leahy GJ, Wright DJ, Player RI

    The operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as r

    Jan 1, 1978

  • AUSIMM
    Tunnelling Under Steep, Dangerous Slopes

    By Shibata Y, Shimizu R, Fukushima A

    Kobe is divided by the Rokko Mountains, runn- ing from east to west. The southern section of Kobe is highly developed in contrast with the northern section, but big, new residential pro- jects like

    Jan 1, 1987

  • AUSIMM
    From Concept to Reality ù Process Water Treatment at the ERA Ranger Mine

    By D Jones

    The development, piloting and engineering design of an innovative water treatment system for process water produced by a uranium mine mill are described. The process incorporates lime/carbonate soften

    Jan 1, 2003

  • AUSIMM
    The Elimination of Nickel from Zinc Plant Solutions Using Dimethylglyoxime

    By Kershaw M. G, Maughan R. C A

    A process for eliminating nickel from electrolytic zinc plant solutions by precipita- tion with dimethylglyoxime (DMG) was developed to enable the Electrolytic Zinc Company of Australasia Limited (

    Jan 1, 1977

  • AUSIMM
    Mining a Narrow Ore Body - Innovative Mining and Blasting Methods

    By LeJuge G. E, McKenzie C. K

    Innovative mining and blasting techniques were demanded at the Richmont Mines, Francoeur Mine in Quebec, Canada, by a narrow, shallowly dipping high grade gold ore body. The ore body being mined oc

    Jan 1, 1992

  • AUSIMM
    Copper Skarn Deposits in Eastern China (92f36f50-d094-4edf-add9-cf3f94eac5a1)

    In eastern China, most of the copper skarn deposits occur in folded troughs which are controlled by the EW-trending faulted fold systems (the Pal-Asian geotectonic domain), and the NNE-trending rift

    Jan 1, 1995

  • AUSIMM
    The Establishment and Operation of Queensland Alumina Limited

    The operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as r

    Jan 1, 1978

  • AUSIMM
    The New Code

    By Miskelly N

    The Joint Committee of The Australasian Institute of Mining and Metallurgy (AusIMM) and the Australian Mining Industry Council (AMIC) have published a Code for the Reporting of Identified Mineral Reso

    Jan 1, 1990

  • AUSIMM
    Quality Control Systems at BHP's Mount Whaleback Iron Ore Mine, Newman, Western Australia

    The Mount Whaleback iron ore deposit at Newman, Western Australia comprises the largest known continuous iron ore deposit in Australia, originally with a Measured Resource in excess of 1700 Mt of h

    Jan 1, 1997

  • AUSIMM
    Investigations on the Ropes in Mine Hoisting Systems

    Wire rope, when used for hoisting on a mine is the weak- est and most vulnerable unit in the most expensive&apos;-group of installations or! the mine. With the introduction&apos; of hoisting on the

    Jan 1, 1964

  • AUSIMM
    Alkaline Oxidation of Pyrite in Gold Recovery

    By Spencer PA, Winborne DA

    The Porgera mineral deposit in Papua-New Guinea contains gold as finely divided, probably submicroscopic (1 um) particles dispersed in a pyrite sulphide matrix. Only 25-30% of the gold in pyrite

    Jan 1, 1984

  • AUSIMM
    Classification and Partition Performance of Dense Medium Cyclones

    Samples of the feed, underflow and overflow mediums from dense medium cyclones operating at low separation densities in eight commercial coal washeries were sized and analysed, to obtain comparativ

    Jan 1, 1993

  • AUSIMM
    Saxonvale Mine Development a Case Study in Project Planning and Project Management

    Saxonvale mine is a multi bench open pit coal mine developed to its Stage I capacity of 1.75 Mt/y of run of mine coal. Detailed engineering studies for the mine commenced in April 1980, approval t

    Jan 1, 1983