Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Challenging the Norm – Alternative Excavation Method in Mining

    By R Burke, G Ramage, C Donnelly

    Over the decades, Redpath has undertaken a multitude of tunnelling and underground excavation projects for civil and mining clients both domestically and internationally. These projects have been unde

    Mar 24, 2014

  • AUSIMM
    The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging Conditions

    By V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard

    This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil

    Sep 18, 2012

  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004

  • AUSIMM
    Improved sustainability through WHIMS Plant addition at Roy Hill

    By C Jenkins, J Jasper, Y Suryaputradinata, S Lozyk, M J. Hartmann

    The primary objective of mining companies is to function as a profitable business by delivering products that fit customer requirements in a safe and sustainable manner. Optimum resource utilisation i

    Nov 8, 2021

  • AUSIMM
    De-bottlenecking Iron Ore Transportation from Mine to Plant

    By T Tan, C P. Holmes, C E. Hartford

    Transportation of iron ore from the mine to the plant is critical to business success. Ore from the mine may have to be transported across states, countries and even continents to get to the processin

    Jul 13, 2015

  • AUSIMM
    Research on the Shape and Particle Size Distribution of Caved Ore Mass in Sublevel Caving

    By G J. Zhang

    The shape and particle size distribution of caved ore mass in sublevel caving were investigated in this study. The paper first reviews the main factors affecting the shape and characteristic of caved

    Jul 11, 2011

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Chronostatistics ù A Powerful, Pragmatic New Science for Metallurgists

    Forty years ago Dr Pierre M Gy, a metallurgist, introduced variography as applied to monitoring a process. Consequently, his followers used the variogram to elaborate meaningful process control charts

    Jan 1, 2006

  • AUSIMM
    Managing continuous improvement of Mine to Mill begins with measurement

    By J Loeb, R Ramanathan, H Ingham, P Cameron

    Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd

    Nov 8, 2021

  • AUSIMM
    Blast Engineering ù An Explosive Career

    This presentation is a 20 minute snippet of my professional career, and my progression in the mining industry, from a lazy uni student to an up-and-coming blast engineer in the middle of a mining boom

    Jan 1, 2006

  • AUSIMM
    Setting for Success – Private Equity Exploration and Mining Project Buy-in to Listing and Divestment

    By A Keogh, P Allen, P Stoker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Private equity (PE) firms are comparatively free of mandatory requirements for the level an

    Mar 18, 2015

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough Times

    By P Moynagh

    "A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua

    Nov 15, 2016

  • AUSIMM
    MEMS – The Mine Event Management System: a process to assist with incident management

    By B Stewart

    It has long been recognised that knowledge of the conditions existing in a mine after an incident is essential in deciding whether to deploy responders as part of the incident recovery process. Applyi

    Apr 16, 2024

  • AUSIMM
    Chemical Enhancement to Magnetic Separation for Effective Separation of Silicates from Titanium Phases at Finer Particle Size Fraction

    By S A. Ravishankar

    In heavy minerals separation, the titanium and iron oxide phases are separated from silicates in the coarser particle size range (80 - 150 mm) using magnetic and electrostatic separators. With the ong

    Oct 5, 2011

  • AUSIMM
    Projection of Ecological Restoration of Acid Mine Waste Rock of Shuilong Mountain at Dexing Copper Mine

    By L B. Zhou, Q Wang

    The present discussion focuses on the developmental directions of eco-restoration of acid mine waste rock dump, by using acid mine waste rock of Shuilong Mountain as an example. Based on the analysis

    Jul 10, 2012

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    An Occupational Health and Safety Perspective on the Water Systems in Mining

    By J Field

    Many aspects of water use in mining are driven by the technical requirements for water. There has been little consideration given to both the safety and the health requirements. Workers in the mining

    Jan 1, 2006

  • AUSIMM
    Preparing Effective Specifications for Occupational Health and Environmental Noise Objectives in Mining Project Design and Delivery

    By C Tickell

    Achieving occupational health and environmental noise objectives is a major consideration in the planning or operational phase of resource development and industrial projects to meet the needs of the

    May 9, 2016

  • AUSIMM
    Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and Future

    By M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan

    The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme

    Sep 29, 2013