Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Planning for Commercial Operation of the Honeymoon ISL Uranium Project

    A recoverable uranium resource, shown to be suitable for in situ leaching, was discovered at Honeymoon in South Australia in 1971. Exploration of the deposit was carried out during the period from 197

    Jan 1, 2002

  • AUSIMM
    Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in India

    By I D. Gregson, A S. Garcia, K M. MacAndrew

    The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm

    Nov 5, 2014

  • AUSIMM
    Iran Mining Industry Based on the 20-Year Perspective 2025

    By F Rashidinejad

    Iran has had an active mining sector for some 7000 years. Exceptional in terms of its mineral diversity, Iran produces 62 minerals, and is ranked among the world’s 15 most mineral-rich countries. Many

    Nov 22, 2011

  • AUSIMM
    Application of enterprise optimisation considering ultra high intensity blasting

    By J Pan

    This case study assesses the application of Mine-to-Mill optimisation combined with Whittle Consulting’s Prober<sup>®</sup> economic optimisation for the purpose of economic value upl

    Nov 21, 2018

  • AUSIMM
    Carbon Prefloat Improvements at Century Mine

    By D G. Rantucci

    Organic carbon is a major ore contaminant at MMG’s Century mine. This carbonaceous matter is associated with shale hosted sphalerite mineralisation. It occurs as elongated lamellae and as inclusions

    Aug 8, 2011

  • AUSIMM
    Flotation Optimisation Studies of the Perilya Broken Hill Lead Circuit

    By B Kilgariff

    Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at

    Jan 1, 2005

  • AUSIMM
    Phase equilibria of Al2TiO5–Ti3O5 pseudobrookite solid solution in the Al2O3–TiOx system under various oxygen partial pressures

    By W Y. Kim, Y B. Kang, Y J. Park

    The phase equilibria in the Al2O3–TiOx system were investigated in wide ranges of temperature and oxygen partial pressure: 1300~1600°C and 10-16.6~10-8 atm, respectively. The equilibrium phases and th

    Aug 21, 2024

  • AUSIMM
    Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, Laos

    By B Saunders, J Carpenter

    PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug

    Sep 20, 2017

  • AUSIMM
    Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to production

    By H Wright

    Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp

    Mar 29, 2023

  • AUSIMM
    Application of Heterogeneity Testing to Coarse Gold Ores

    By S C. Dominy, R C. A Minnitt

    Determination of the sampling constant and liberation diameter are of importance when applying the Fundamental Sampling Error (FSE) equation to optimise sampling protocols. The method for the direct d

    Aug 21, 2012

  • AUSIMM
    Evolution and technical considerations to manage tailings at the RPP- 140 mining title (Antioquia - Colombia)

    By García B., Wolff E.

    In Colombia, northeast of Antioquia, there is a gold deposit that has produced continuously since the middle of the XIX century, located within mining title RPP-140, property of Gran Colombia Gold Seg

    Jun 17, 2024

  • AUSIMM
    On the development of a viscosity model for molten multicomponent slag systems with several glass-forming, amphoteric and modifier oxides

    By G M. Zhomin, A S. Arkhipin, A Kondratiev

    Viscosity of multicomponent slags is one of the crucial physicochemical properties for many industrial processes and technologies. While the viscosity-temperature relationship of completely molten sla

    Aug 21, 2024

  • AUSIMM
    Mineral liberation studies of IMPTEC super-fine crusher – 130 crushed product

    By J Addai-Mensah, W Skinner, C Kelsey, J R. Kelly, E Baawuah

    Comminution continues to be the most capital-intensive unit operation in mineral processing. The fundamental purpose of comminution is to liberate the valuable minerals so that they can be economicall

    Aug 29, 2018

  • AUSIMM
    Taxonomy of Interactive Computer-Based Visualisation Systems and Content for the Mining Industry û Part One

    By C Caris, K Fowle, M Schmid, E van Wyk, D Schofield, A Squelch, M S. Kizil

    This paper has been written collaboratively by members of the International Mining VR Group. It is the first of a series of papers. Mining in the 21st century is a high technology industry that strive

    Jan 1, 2008

  • AUSIMM
    Heterogeneity, Sampling Errors and the Nugget Effect in Gold Ores - Implications for Evaluation, Exploitation and Extraction

    Sampling errors result from heterogeneities within the lot under study. Within a rock mass in situ heterogeneity results in the geological nugget effect, which accounts for most of the natural variabi

    Aug 1, 2010

  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017

  • AUSIMM
    Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn Deposit

    By B Armstrong

    The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value

    Sep 5, 2011

  • AUSIMM
    The CSA ventilation upgrade – geotechnical challenges and learnings

    By T M. Brettell, D Sidea

    The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre

    Oct 16, 2017

  • AUSIMM
    A Comparative Study of Manual Wagon Top Sampling and Auto Mechanical Sampling of 200 mm Size Coal with Respect to Stopped Belt Sampling of Thermal Coal at Indian Super Thermal Powerplants

    By K M. P Singh, K M. K Sinha, G S. Jha, T Gouricharan, K K. Sharma

    The majority of the powerplants in India are fed with non-coking coals, with the coals dispatched from their respective mines via wagons loaded by a rapid loading system or pay loader. The usual top s

    Jul 29, 2014

  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016