The Dual-Electrode DC Arc Furnace ? Modelling Insights
By Q. G. Reynolds
Keywords: Pyrometallurgy, furnace, DC, reverse polarity, dual-electrode The dual-electrode direct current (DC) arc furnace uses two graphite electrodes, one connected as cathode, and one as anode.
Jan 1, 2011
-
Kuyasa Mining: South Africa?s First Black Owned And Managed Mining Company
By R. Scott
This article describes and evaluates the establishment of Kuyasa Mining including the search for a suitable deposit, the ongoing lack of finance, and market constraints. Despite the dramatic initial g
Jan 1, 1998
-
The Use And Abuse Of Feasibility Studies (c627553d-2bd9-45a2-832d-29f2383e03fc)
By W. Mackenzie
The development of a resource project inevitably requires the investigation of a vast range of issues across most engineering disciplines - mining, metallurgical, chemical, civil, electrical, mechanic
Jan 1, 2007
-
Finite Element Modelling Of Electric Currents In Ac Submerged Arc Furnaces
By I. Mc Dougall
Finite element models were generated of two submerged arc furnaces of different geometries. A 48MW circular furnace and a 68MW 6-in-line rectangular furnace were studied. The electrodes, raw material,
Jan 1, 2007
-
Shear-flow coupling properties of a rock joint and its modelling by Geographic Information System (GIS)
By Y. Mitani, F. Vallier, T. Esaki
Shear-flow coupling tests are conducted using an original apparatus, and a shear-flow coupling model using Geographic Information System (GIS) is developed in order to evaluate shear-flow coupling pro
Jan 1, 2003
-
Cokriging for Optimal Mineral Resource Estimates in Mining Operations
Cokriging uses a sparsely sampled, but accurate and precise primary dataset, together with a more abundant secondary data-set, for example grades in a polymetallic orebody, containing both error and b
Jan 1, 2014
-
The Importance of People in the Process of Converting a Narrow Tabular Hardrock Mine to Mechanization
By D. Vogt, T. Hattingh
"This paper argues that the technology change to mechanization is also going to require a change in people. It presents a model for technological progress and adapts it to the mining industry. It then
Jan 1, 2016
-
Sulphuric Acid Manufacture
By M. J. King, A. Weissenberger, W. G. Davenport
Keywords: Pyrometallurgy, sulphuric acid, sulphur dioxide The raw material for sulphuric acid manufacture is clean SO2 gas. It comes from (i) burning molten by-product sulphur; (ii) roasting or s
Jan 1, 2006
-
Online Measurement Of Factors Influencing The Electrostatic Separation Of Mineral Sands
By J. M. Lottering
Paper written on project work carried out in partial fulfilment of B Eng (Chem) degree Operational factors influencing the electrostatic separation of mineral sands were investigated in a laborator
Jan 1, 2006
-
The Past, Present And Future Of Shotcrete At Elandsrand Gold Mine
By K. Collett
Elandsrand started shotcreting back in 1991. This paper will share the experiences of the mine by looking into the past, the present situation and the way Elandsrand plans to approach the future. It l
Jan 1, 1998
-
Mechanical–transport processes in salt: consequences for abandonment of underground exploitations
By M. Ghoreychi, X. Daupley
ABSTRACT: The paper is devoted to two major aspects related to the abandonment of salt mines: 1)- Long-term risk associated with the mechanical instability of surface and its consequences for public s
Jan 1, 2003
-
Geology, Hydrogeology And Structural Competency Of The Boundary Pillar At South Deep Gold Mine
By M. van Biljon
The possible closure and subsequent flooding of South Deep Gold Mine?s neighbouring Randfontein Estates Limited No. 4 Shaft (REL 4) necessitated the construction of five concrete plugs in the connecti
Jan 1, 2006
-
Simplification Of The Thabazimbi Dense Media Separation Plant Flow Line To Increase Capacity - Background
By E de Villiers
Several methods exist by which the capacity of a dense media separation (DMS) plant can be improved: 1) Increase the feed rate in spite of efficiency 2) Replace with bigger equipment 3) Add wh
Jan 1, 2006
-
Designing exploitation and dumping processes in brown coal mines using information technology techniques
By R. Chryst, R. Kus
In the Integrated IT Systems proposed by Przedsie? biorstwo Robót Geologiczno-Wiertniczych—Geological and Drilling Company (PRGW) a network connects a database with all of the departments of a mining
Jan 1, 2003
-
Financial Impact Of Resource/Reserve Uncertainty
In constructing a financial model of a project significant effort is expended on capital and operating cost estimation, commodity price forecasts, and choice of discount rates while uncertainty in the
Jan 1, 1999
-
Improving The Trough Opening Process At Premier Mine Utilizing Electronic Delay Detonators
By H. Möhle
Premier Mine is a large underground diamond mine, situated at Cullinan in the Gauteng Province of South Africa. The mine hoists over 3 millions tons of diamond bearing kimberlite per year, from a mode
Jan 1, 2000
-
The plasma manufacturing of titania pigment and nano-titania in a pilot plant - Synopsis
By J. T. Nel
The establishment of a pilot plant for the continuous production of titania pigment and nano-titania is discussed. The plant was designed, constructed and operated on the Necsa site. The TiO2 producti
Jan 1, 2010
-
On the surface noxious gas emissions from old iron mines
By D. Grabowski, Z. Pokryszka
A study carried out in the iron basin of Lorraine (North-East of France) highlighted the existence of under-oxygenated and noxious gas emissions (carbon dioxide, radon…) in vast built-up areas related
Jan 1, 2003
-
Guaigui Multipurpose Project Rock Slope Stability
By Bjørn Nilsen, Werner Stefanussen
The construction of the Guaigui Multipurpose Project includes a 74 metre high concrete face rock fill dam, a 350 metre long diversion tunnel and a 350 metre long spillway tunnel. The topography in the
Jan 1, 2006
-
Post Taphole Practices Adding Value
By H. Hearnden
Whereas in the past, ladles were simply a means of transferring molten products from furnace tapholes to points of discharge be they casting pans or waste dumps, the ladle is now becoming a more integ
Jan 1, 2004