Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2004
-
On The Effects Of Sand Grading On Driven Pile Performance
Precast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i
Jan 1, 1989
-
Discussion On Base Grouted Piles
By V. M. Troughton
Further pile load testing has been carried out at Canary Wharf to compare the performance of base grouted and ungrouted bored piles founded in the Thanet Sand. The testing regime included three prelim
Jan 1, 1991
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work
By Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
3 Recent Developments In Pile Design - Developments In Pile Design
By W. F. Van Impe
The design of piles and of pile groups has remarkably progressed over the past two decades. The increasing complexity of the building concept implements a more rational approach of the deep foundatio
Jan 1, 1994
-
Ladies And Gentlemen,
By George Koenig
I have been granted the outstanding privilege... and pleasure to introduce you this evening to the Grand-Duchy of Luxembourg and to tell you in a few words how this country came into existence, how it
Jan 1, 1987
-
Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History
By Gregory A. Stephan
A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is
Jan 1, 2003
-
Evaluating Geotechnical Resiliency Solutions in New York City
By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
When selecting a solution for improving resiliency at facilities, such as airports, utility and transit sites, there are many options to protect structures and equipment against potential flooding. Ea
Jan 1, 2018
-
The Type Of Wharf Structure On Soft Soil With Undulating Weathered Rock Bed
By Sun Shao Xian
The Port of Shekou is situated at Shenzhen Bay on the east side of the Pearl River estuary. Geological condition of the site is quite complicated. On top of the sea bed, there is a layer of soft silt
Jan 1, 1991
-
A Simple Evaluation Of Dynamic Pile Tests
By D. Kolymbas
A simple formula is introduced which allows the evaluation of dynamic pile tests. The following case is considered: The pile top is dynamically loaded by an impact. The velocity v of the pile top is r
Jan 1, 1989
-
Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. Applications
By William S. Heckman
a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and
Jan 1, 1997
-
Design And Construction Of The Sutong Bridge Foundations
By Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2005
-
Performance Of Three Unique Shoring Sections For Block 75 Shoring
By Chris Sammon
The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet
Jan 1, 2010
-
Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield Terminal
By Randy R. Huberty
Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result
Jan 1, 2001
-
Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway Bridges
By Kouichi Tomisawa
Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri
Jan 1, 2006
-
Piling Practice in Sedimentary Granular Soils of Santa Cruz, Bolivia
By Mario Terceros H, Bengt H. Fellenius
"ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su
Jan 1, 2014
-
Large Diameter Machine Bored Piles In Australia
By W. J. Kingwell
Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of
Jan 1, 1989
-
Analyses On Laterally Loaded Cast-In-Place Concrete Piles ? Synopsis
By Makoto Kimura
Failure tests on laterally loaded single and pile group are analyzed with a 3-dimensional elasto-plastic finite element program. In the analysis, the mechanical behavior of the ground is supposed to b
Jan 1, 1996
-
Static-Load Hydraulic Piledriving: An Alternative System For Noise & Vibration-Sensitive Applications ? Introduction
By Robert A. Field
Static-Load Piledriving systems utilize hydraulic push to advance piles into the ground. Dynamic systems (ie. hammers and vibratory equipment) utilize impact, or vibration, to advance the piles. S
Jan 1, 1995
-
Guidelines for Selecting Cutoff Wall Systems
By Mary Ellen Large
This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system
Jan 1, 2021