    Experimental P-Y Curves from Centrifuge Tests on Pile Foundations Subjected to Liquefaction and Lateral Spreading

    By Arash Khosravifar, Nason McCullough, Stephen, Milad Souri, Scott Schlechter, E. Dickenson

    The results of five centrifuge models were used to evaluate the response of pile-supported wharves subjected to inertial and liquefaction-induced lateral spreading loads. The centrifuge models contain

    Jan 1, 2019

  • DFI
    Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, California

    By Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa

    "The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un

    Jan 1, 2015

  • DFI
    Vancouver Island Conference Centre Cutter Soil Mixer Technology Transforms Site

    By Brian Wilson, John Scholte, Megan Atkinson

    "In November 2004, the residents of the City of Nanaimo, B.C., Canada voted to approve a new conference centre as the centrepiece of a proposed revitalization project for the city’s historic downtown

    Jan 1, 2008

  • DFI
    The Potential Impacts Of Questionable Instrumenation Data

    By Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson

    This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t

  • DFI
    Deep Foundations for Top-Down Construction of High-Rise Project

    By Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin

    A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const

    Jan 1, 2019

  • DFI
    Assessment of Existing Bulkhead Walls for Dredging Impacts

    By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst

    "For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen

    Jan 1, 2017

  • DFI
    Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative Solution

    By Mario Mauro

    In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi

  • DFI
    Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling Techniques

    By Huw Williams

    "Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi

    Jan 1, 2005

  • DFI
    Effects of Atmospheric Conditions on Energy Pile Performance

    By Melissa S. Beauregard, Randall A. Pietersen

    This study focuses on quantifying the effects of water infiltration on a full-scale energy pile system’s ability to meet the thermal demand of an HVAC system. Theoretically, an energy pile system shou

    Jan 1, 2019

  • DFI
    Goethals Bridge Replacement Foundation Design Modifications Due to Field Conditions

    By John P. Turner, Mark Jen, Bobby Daita

    "The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-

    Jan 1, 2016

  • DFI
    Risks Associated With Finite Element Modelling Of Cut And Cover Structures

    By Tony Suckling

    The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This

    Jan 1, 2010

  • DFI
    Design Practice Of Circular Diaphragm Wall Structure With Large Diameter ? Synopsis

    By X. Y. Hou

    The design practice of several circular underground projects with large diameter is summarized. By taking the advantages of load-bearing of circular structure, a rational annular tensile bar support s

    Jan 1, 2010

  • DFI
    Design Of Well Cap, Pier And Well Steiming At The Junction Using Strut-And-Tie Model - Synopsis

    Pier, well cap and steining junction is a complicated 3-d re-ion. The prevalent design procedure for the pier, well cap and steining in isolated manner is not rational. In absence of an integrated app

    Jan 1, 1996

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d

    Jan 1, 2017

  • DFI
    Emergency Stabilization to Maintain CN Rail Service

    By Rick Deschamps

    "Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site

    Jan 1, 2017

  • DFI
    Shear Walls Used For Liquefaction Stabilization Of Earthen Dam Embankments

    By Peter J. Nicholson

    Recognition of the liquefaction susceptibility of dam embankments has been heightened since the San Fernando Dam near failure incident in 1971. Both the downstream and upstream slopes of dams can be

    Jan 1, 2008

  • DFI
    “Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down Method

    By Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi

    "The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,

    Jan 1, 2016

  • DFI
    Jet Grouted Foundation for 57-Story Tower

    By Robert Alperstein, Nidal AbiSaab, Joe Pastore

    "This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit

    Jan 1, 2016

  • DFI
    Innovative Methods Of Dealing With Contaminated Soils In Drilled Shafts - Synopsis

    By William F. Loftus

    When high capacity diameter pipe piles are driven open-ended into the underlying bedrock, the material gathered inside the pipe often must be excavated to allow concrete to be placed within, in a clea

    Jan 1, 1996

  • DFI
    Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, California

    By Michael Forrest, John Roadifer, Glen Gorski

    "The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d