Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance Techniques

    By S. Makni, A. Faucher, F. Robichaud, A. Bouajila

    "Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge

    Jan 1, 2012

  • CIM
    Maximizing Ore Extraction at Brunswick Mine

    By Barara Rose

    Presentation Outline ?Introduction of BMS ?Resource Integration Process ?Methodologies ?Tools ?Case Studies ?Zone 01 : 725 SOZ ?Zone 16/17 : 1000 NRP ?Conclusions

    Oct 1, 2010

  • CIM
    Wireless Communications in Mineral Processing Applications

    By Peter Metcalfe

    "Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen

    Jan 1, 2014

  • CIM
    Low PH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit (db4a4353-e70f-4fb2-9b3d-7daf6f017863)

    "The Ernest Henry Mining (EHM) ore body is an iron oxide copper gold deposit with an average grade of 1.1 percent copper, 0.5 g/tonne gold and 22 percent magnetite. At the end of 2009, EHM converted t

    Jan 1, 2014

  • CIM
    Red Lake Gold Mine Autoclave Optimization Project

    By K. K. Murray, D. G. Gelderland

    "The pressure oxidation autoclave at the Goldcorp’s Red Lake Gold Mines (RLGM) was commissioned in 1991. Since commissioning, the circuit has been well maintained and its capacity increased to mechani

    Jan 1, 2017

  • CIM
    Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits

    By J. A. McLennan

    Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer

    Apr 1, 2005

  • CIM
    The recovery and utilization of fine coal

    By W. L. Thayer, K. A. Jonasson, R. D. Coleman, J. D. Hazlett, C. E. Capes

    "Loss of coal fines in reject slurries limits the yield of coal cleaning operations. Difficulties in handling fines also limit the extent of physical cleaning in treating coals with finely-disseminate

    Jan 1, 1988

  • CIM
    Constancia Project Process Plant Design and Start Up

    By David Stephenson, Hugo Granados, Steven Klohn

    "HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv

    Jan 1, 2016

  • CIM
    Processing of Refractory Sulphides at Mantos de Oro, Chile

    By John G. Peacey, Leoncio Sevilla G., Ford. Kevan J. R., Erling Villalobos C.

    "Kinross Gold Corporation’s Mantos de Oro (MDO) gold/silver mine in northern Chile currently processes 15,000 tpd of oxide ores through a mill, whole ore cyanide leach plant followed by a Merrill-Crow

    Jan 1, 2009

  • CIM
    The Limitations of Activated Carbon in CIL Circuits Handling Preg Robbing Solids

    By Yeonuk Choi, Gus Van Weert

    "In regular CIL circuits, activated carbon is used for two purposes: avoiding solid/liquid separation after cyanide leaching, and minimizing gold losses in the tails. The carbon distribution and gold

    Jan 1, 2012

  • CIM
    Environmental consequences of the placement of radium-barium sludge in tailings areas

    By K. L. Murphy, G. Multamaki, P. M. Huck

    "A preliminary evaluation, based on existing data, has been made of the implications of placing radium-barium sludge in tailings areas. The study was restricted to a consideration of possible increase

    Jan 1, 1982

  • CIM
    802.11 Wireless Site Survey Methodologies in an Underground Mine Environment

    By Mark G. Lafontaine

    Underground 802.11 wireless communications has become widely adopted for automation and communication purposes but maximizing the wireless signal presents many obstacles given the harsh environment as

    May 1, 2013

  • CIM
    Development of Cable-Lok Anchor for Pre-stressed Cable Bolting and its Applications in Mines

    By Rocky (Yaokun) Wu

    This paper introduces the development and application of a new cable anchor - Cable-Lok for pre-stressed cable bolting in mines. Cable-Lok is a spring-loaded cable anchor suitable for the drill hole

    Oct 1, 2010

  • CIM
    Evolution of a Mine Development System: Tunnel Boring Machine I&C Cameco Cigar Lake

    By Neil H. Brown

    Outline ? Cameco - Cigar Lake ? Cigar Lake Mine Development ? MDS #1 ? MDS #1 Improvements ? MDS #2 ? MDS #2 Improvements Pending ? Acknowledgements Mine Development System ? Mining methods t

    Oct 1, 2010

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Nickel production from low-iron laterite ores: Process descriptions

    By R. A. Bergman

    "Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge

    Jan 1, 2003

  • CIM
    The Development and Commissioning of Ontario’s First Diamond Mine – The Victor Diamond Mine

    By Ian Holl, Adam Hempstock, Rickardo Welyhorsky, Niel Morrison

    "The Victor Diamond Mine is located in the James Bay lowlands, 90 km west of the First Nations village of Attawapiskat. The project was the first of its kind in northern Ontario and was completed appr

    Jan 1, 2010

  • CIM
    Effect of mineralogical and petrographical properties of marble on cutting by diamond wire

    By Y. Özçelik

    Rocks show a variety of engineering and physical properties that affect typical quarry operation such as diamond wire cutting in the marble quarry. The physical and mechanical properties of rocks depe

    Jan 1, 2005

  • CIM
    Application of biotechnology for treatment of nitrogen compounds in gold mill effluents

    By W. D. Gould, A. Kapoor, K. Morin, P. Bédard

    This paper presents the results of a research study that is being conducted by the Mine Effluents Program, Mining and Mineral Science Laboratory (MMSL), Natural Resources Canada aimed at evaluating bi

    Jan 1, 2004