Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Oscillating Disc Cutter - The Breakthrough Tool for Continuous Rock ExcavationBy X Li, H Alehossein
The oscillating disc cutter (ODC) is an innovative technology for the continuous excavation of hard rock. This paper will discuss:the reasons for its development;its method of operation;current experi
Jan 1, 1999
-
A Case Study Of Reserves Estimation For A Strip Coal MineUtah Development Company began prospecting for coking coal in 1961 and Blackwater Mine became a reality in June 1967. Exploratory and develop- ment drilling has been a continuing effort and reserves
Jan 1, 1979
-
Productivity Gain from Advances in Mining Geology - Signposts for the FutureBy White A, Price G
The main assets of a mining company are its orebodies; the second are the people who find and use them.The graphs in Figure 1 were derived from a paper by Rob Macdonald of Rothschild Australia present
Jan 1, 1993
-
Estimation of rock brittleness for jointed specimens under cyclic triaxial loadingBy P Khalkho, M Singh
Rock masses when subjected to uniaxial or triaxial cyclic loading (eg in hydraulic running tunnels, during retrieval and injection of oil and gas from storage underground caverns and haulage roads), t
Nov 29, 2022
-
Assessment of Options for Economic Processing of Preg-Robbing Gold OresBy K Buda, W Staunton, M Hill, V Tjandrawan
One of the challenges facing the gold industry in the 21st century is the continuing need to identify new reserves of economically treatable ores. Discoveries of large, metallurgically simple orebodie
Jan 1, 2007
-
High Intensity Reactor Systems for Smelting of Base and Precious MetalsThe factors affecting performance of base and precious metal smelting and converting processes are considered in relation to reactor characteristics. The chemical differences between processes are rel
Jan 1, 1992
-
Lessons from Manufacturing-Integrating Mining and Milling for a Complex OrebodyBy Tucker G, Clark A, Young M. F, Johnston M
Mount Isa Mines has made a huge commitment to process control in milling. Yet in lead zinc we still failed to achieve a steady operation. Comparisons with manufacturing plants showed the key differe
Jan 1, 1998
-
Thermodynamic of the Coal Reduction Process for the Upgrading of IlmeniteBy Merritt RR
The equilibrium phase relations in the Fe- Mn-Ti-0-S system were established at 1380 and 1485 K. The elemental distributions between the equilibrium phases were obtained by chemical- ly analysing se
Jan 1, 1980
-
Meeting Geotechnical Challenges - A Key to Success for Block Caving MinesThis paper presents a summary of tools and methods used for geotechnical assessments and monitoring systems at block caving mines. A critical review of these tools is given based on the authorÆs exper
Jan 1, 2000
-
Testing for the Selection of Comminution Circuits to Prepare Concentration FeedWhat is the best circuit to comminute primary crusher product to make beneficiation feed? Finding the best circuit to crush and grind minerals to beneficiation sizes is a complex problem that can l
Jan 1, 1978
-
Optimisation of Hydraulic Filling for Underground Disposal of Tailings in PeruBy D M R Stone
Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis
Jan 1, 1998
-
Using the Floatability Characterisation Test Rig for Industrial Flotation Plant DesignBy J-P Franzidis
Industrial flotation plant design is a complex process involving many aspects, one of which is the use of pilot-scale plants to test industrial plant flow sheets. Once test work on a pilot-scale has b
Jan 1, 2004
-
Developments in Geophysics for Prediction of Structures Influencing Production in MinesIn both surface and underground coal mines, the detection of geological structures ahead of workings is recognised as being fundamental to the efficient operation of the mine. Mining into zones of
Jan 1, 1988
-
Maintenance of Shaft Structures for Operational Safety in Older Deep ShaftsFor various reasons, the maintenance of shaft structures is becoming an increasingly important factor in the operation of underground mines. Deterioration mechanisms related to operation of the shaft
Jan 1, 2005
-
The Development of a Continuous Copper Drossing Process for Lead BullionThe first stage in the refining of lead blast furnace bullion is the removal of copper and this is normally done as a batch process in open kettles,A number of attempts have been made in the past to e
Jan 1, 1963
-
Maintenance Requirements and Procedures for Underground Mobile Equipment, C.S.A. Mine, CobarThe maintenance system for underground mobile equipment at Cobar Mines Pty. Ltd. has been modified from that originally planned as a result of experience gained in operating the equipment.Downtime due
Jan 1, 1969
-
Modern Management Systems for Higher Margins (287342e3-9503-42c0-a395-e57d01f1d6c3)Maximising margins in highly competitive international markets demands superior productivity. A key to superior productivity is using a process approach to enable rapid, ongoing improvement of produ
Jan 1, 1998
-
Development of a Near Field Damage Model for Cemented Hydraulic FillBy G P. F Chitombo
The dilution of blasted ore with cemented backfill materials has been recognised as a significant factor influencing the economics of some underground metalliferous mining operations. Several mechanis
Jan 1, 1998
-
Key Centre for Mines/International A New Regional Mineral Education InitiativeThe Key Centre for Mines consists of the School of Mines of the University of New South Wales and the Departments of Geology and Civil and Mining Engineering of Wollongong University. The Key Centre f
Jan 1, 1990
-
Novel Chemistry for the Removal of Gold and Silver from CarbonBy Monette J. C, Nulty J. H
High temperatures and pressures are required to obtain acceptable stripping rates. Higher chemically induced stripping rates could reduce the need for higher temperatures which lead to cyanide losse
Jan 1, 1991