A Case Study Of Reserves Estimation For A Strip Coal Mine

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
5
File Size:
115 KB
Publication Date:
Jan 1, 1979

Abstract

Utah Development Company began prospecting for coking coal in 1961 and Blackwater Mine became a reality in June 1967. Exploratory and develop- ment drilling has been a continuing effort and reserves have been assessed at several stages. Some of the history of exploration and reserves assessment is given and practices in drilling, sampling and testing are described, particularly in regard to objectives of drilling and reserves estimation. The current methods for calculation of reserves are described and some comment is made regarding use of the data in mine blending control and plant operation including correla- tion of results.
Citation

APA:  (1979)  A Case Study Of Reserves Estimation For A Strip Coal Mine

MLA: A Case Study Of Reserves Estimation For A Strip Coal Mine. The Australasian Institute of Mining and Metallurgy, 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account