Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Leaching of Some Australian Nickeliferous Laterites with Sulphuric Acid at Atmospheric Pressure
Sulphuric acid leaching at atmospheric pressure of a number of Australian nickeliferous laterites was examined in detail. The results obtained indicate that nickel can be extracted from these ores, al
Jan 1, 1978
-
Notes on the Working of the MacArthur-Forrest Process for Extracting Gold
In redesigning the cyanide plant at Mount Torrens, in conjunction with Mr. L. W. Grayson, the manager, several minor alterations were introduced in order to have the operations under thorough control,
-
Stratiform Basic Bodies Within The Yilmia Ophiolites, Western Australia
The authors describe two stratiform intrusions within a two miles thick ophiolite belt, one of the many ophiolite (serpentine) belts of the eugeosynclinal sequences of the Kalgoorlie System (metamorph
Jan 1, 1969
-
Background Geochemistry Downstream from Mines: USA Case Studies and NZ Significance
Background geochemistry of streams in mineralised terranes is affected by (a) natural sulphide oxidation and associated metallic discharges; and (b) previous mining history and associated discharges.
Jan 1, 1999
-
The Hatches Creek Tungsten and Bismuth Field
Hatches Creek has been inactive since 1961, but with better metal prices, interest in the field is reviving.The mixed gravity concentrates which were unsalable in 1951 have been experimentally separat
Jan 1, 1965
-
The Development of Processes for the Treatment of Crude Ore, Accumulated Dumps of Tailing and Slime at Broken Hill, New South Wales
The following paper on the development of processes for the treatment of crude ore, accumulated dumps of tailing and slime at Broken Hill, has been prepared by a committee of the Broken Hill Branch of
Jan 1, 1930
-
Diesel to electric – creating a positive paradigm in underground ventilation and cooling
By C McGuire, W Harris, S Arsenault, D Witow, B Rogers
Mining deep orebodies is increasingly becoming the norm as the ‘easy’ orebodies are depleted. Deep ore mining requires significant ventilation and cooling infrastructure to not only meet regulatory re
Aug 28, 2017
-
Mine Site Environmental Management and Sustainable Post-Mining Land Use in New South Wales, Australia
The Department of Mineral Resources has a statutory responsibility for mine site environmental management and control in New South Wales. The Department is focusing on an environmental management syst
Jan 1, 2002
-
Common pitfalls in sampling iron ore
By R J. Holmes
The procedures and equipment used for sampling iron ore process streams have generally improved in recent years. However, there are a number of areas where significant issues still commonly occur, inc
May 9, 2017
-
Foreign Investment - Policies and Effects on Mining in New Zealand
The theme of this conference is æRediscover OtagoÆ. In order to ensure the development and exploitation of mineral discoveries in New Zealand, considerable capital will be required, particularly from
Jan 1, 1992
-
The Importance of Sampling in the Mineral Industry
By R J. Holmes
An accurate knowledge of the chemical, mineralogical and physical characteristics of ores and mineral products that are mined, processed and traded is crucial to effective resource utilisation, plant
Jul 15, 2013
-
The Autogenous Fine Grinding Kelsey Axial Displacement (KAD) Mill
The Autogenous Fine Grinding Kelsey Axial Displacement (KAD) Mill The marginal improvements which continue to be made to fine grinding practices have exposed the limits of conventional technologies a
Sep 13, 2010
-
The Removal of Zinc from Lead Slag by Sulfation and Chlorination
By G C. Bolton
Experiments were conducted to access the feasibility of removing zinc from lead slag by sulfation or chlorination or both. Gaseous sulfation with sulfur dioxide and oxygen released only 50 per cent of
Jan 1, 1980
-
Geoscience input into blasting operations – let’s set a new standard
By T N. Little
The author contends that geoscience is presently under-utilised in the rock fragmentation by blasting process. Before we can set standards in this area, the following is required: mine geologists need
Sep 20, 2017
-
Government Coodrination and Liaison: The Lihir Project
By Van Dusen M
The involvement of concerned parties in all aspects of the Lihir Project from an early stage has promoted good relations between all groups. Activities involving landowners, the Lihir community, t
Jan 1, 1991
-
Quantification of Rock Mass Damage Associated with a Confined Blast Preconditioning Experiment at the Cadia East Block Cave
By G Chitombo, D Francis, P C. Stewart, I Brunton
The ability to precondition (weaken) a rock mass to enhance caving (cavability and fragmentation) is becoming increasingly important, as more potential caving deposits are in stronger rock masses, and
May 9, 2016
-
Start-up of Misima Mines Milling Operation
The physical setting and background to mining operations on Misima Island and the overall plant lay-out are outlined. Developments and changes made to each section of the plant are described as th
Jan 1, 1991
-
Petrology of the Zinc Lode, New Broken Hill Consolidated Ltd., Broken Hill, New South Wales
Drill cores from Section 62, New Broken Hill Consolidated Ltd., were used to study the petrology of rocks associated with the zinc lode. The distribution of the rock types in relation to the lode stru
Jan 1, 1961
-
McArthur River Mine Heavy Medium Plant – The Benefits of Applying Modern Coal Plant Design Principles to Base Metal Heavy Medium Separation
By K Cameron, S Strohmayr, J Wallace
In 2012, a single module heavy medium cyclone plant (HMP) was installed at the Glencore Zinc’s (then Xstrata Zinc) McArthur River lead zinc mine. The HMP formed the first part of the MRM Phase 3 Proje
Sep 7, 2015
-
Undercutting to Surface Breakthrough – Cadia East Panel Cave (Stage 1)
By B Mobilio, M Secheny, J Rachocki, G B. Sharrock, A Jäger, J L. Lett, I Brunton, G W. Capes
Establishment of the Cadia East Panel Cave Stage One (PC1S1) commenced with the firing of the first bell in early 2011. Production began with the completion of the undercut in May 2014. PC1S1 used a p
May 9, 2016