    Deep Mixing Technology in Deep Excavation in Soft Soil Area of Shanghai

    By Jie-qun Zhai, Jian Jia, Ke Yang, Xiao-lin Xie, Yu Zhang

    "With cities’ development, underground space exploitation presents a need for bigger and deeper constructions now. Technical problems founded during the construction of deep foundation pit support bec

    Jan 1, 2015

  • DFI
    Marine Foundation Retrofi t for the Richmond - San Rafael Bridge

    By Patrick E. Durnal, Henrik Dahl

    "A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM + Harris) designed the $779 million seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the

    Jan 1, 2007

  • DFI
    PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation Subcontractors

    By Alexander Filotti, Richard Kalson

    "1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti

    Jan 1, 2017

  • DFI
    How Choice Of Foundation Can Alter The Fate Of A Bridge Project – 3 Case Studies

    By Alok Bhowmick

    The most uncertain and challenging part of a bridge design and construction is the ‘Choice of foundation’. During the planning and conceptual design stage, it is extremely important to choose the righ

    Nov 1, 2022

  • DFI
    Crosshole Sonic Logging Versus Perimeter Sonic Logging: What Have We Learned?

    By Cory McElprang, Enamul Hoque, Aaron Thomas, Scott A. Jacobs

    Crosshole Sonic Logging (CSL) only evaluates concrete on the inside of reinforcing cages leaving the outside unevaluated unless other types of testing are performed such as Perimeter Sonic Logging (PS

    Jan 1, 2019

  • DFI
    “Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall Construction

    By Thomas Domanski

    Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent

    Sep 1, 2022

  • DFI
    Anchored Double-Tier Retaining Walls on Sloping Embankment

    By Chu E. Ho, Paul Napoli

    A new waterfront park was developed on Long Island in close proximity to the East River and Newtown Creek. The existing ground consisted of fill over soft organic clay, medium dense silty sand, glacia

    Jan 1, 2019

  • DFI
    Effect of Free Standing Height on Rock Socketed Pile under Lateral Load

    By Prakash Annamalai Rangasamy, Muthukkumaran Kasinathan

    "Infrastructure development like elevated expressways, metro train and flyover are required proper foundation system to carry heavy traffic loads/significant lateral load, especially in the presence o

    Jan 1, 2015

  • DFI
    The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff Wall

    By Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers

    Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM

    Jan 1, 2019

  • DFI
    Forensic Evaluation Of Bored Piles For A Factory Project At Jhajjar

    By Sanjay Gupta, Sorabh Gupta, Ravi Sundaram

    A geotechnical forensic evaluation of piles for an industrial facility in Haryana was performed to assess the quality of the piles and to evaluate piles installed using two different types of rigs. Lo

    Sep 1, 2022

  • DFI
    Non-Destructive Testing, Evaluation And Re-Use Of Deep Foundations Along The East Coast

    By Matthew E. Meyer

    Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems

    Jan 1, 2009

  • DFI
    Installation Of Augered Cast-In-Place Piles

    By Michael Moran

    Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:

    Jan 1, 2005

  • DFI
    Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock Slope

    By Herbert F. ?Buck? Darling

    A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat

    Jan 1, 2013

  • DFI
    Undergraduate Learning Commons

    By William M. Tanner, Daniel C. Brahana

    "A drilled pier foundation was originally designed to support the proposed G. Wayne Clough Undergraduate Learning Commons on the campus of Georgia Tech in Atlanta, GA. Reflective of the site geology,

    Jan 1, 2015

  • DFI
    Automated Pile Load Test Monitoring

    By Joel L. Volterra

    Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site

    Jan 1, 2008

  • DFI
    Alameda Corridor-East: San Gabriel Trench Project

    By David Peterson, Terry Tucker, Rafael Serrano

    "The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin

    Jan 1, 2017

  • DFI
    Field Test of Electroosmosis with the Injection of Saline Solution of Taipei Silty Clay

    By Chang-Yu Ou, Shao-Chi Chien, Hsuan-Hsiang Chang

    "A field test was performed to investigate the applicability of electroosmosis with the injection of saline solution of Taipei silty clay. The calcium chloride solution and sodium silicate solution we

    Jan 1, 2005

  • DFI
    East Boston Branch Sewer Relief Project: Support Of Excavation Case Study

    By Eric P. Bregman

    As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

  • DFI
    East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)

    By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan

    "As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

    Jan 1, 2017

  • DFI
    Evolution Of Helical Screw Pile Design And Installation

    By Michael Perlow

    Helical screw piles in use since 1838 are routinely used for energy, transportation, municipal, industrial, marine and coastal infrastructure as well as for excavation support, environmental remediati