Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Real Time Monitoring the Historic Old South Church, Boston, Massachusetts
By Pierre Gouvin, Michael Oakland
"This paper covers the rapid response methods used to monitor the emergency response to damage to an historic structure. An architectural gem, the latest incarnation of the old south Church was comple
Jan 1, 2017
-
Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 Introduction
By A. Paviani
The subject of this session is "Equipment Installation, Recent Developments". This is a subject which is not usually addressed at conferences of Foundation Engineering. It is rare to find sessions
Jan 1, 1994
-
Risk Assessment and Quality Control on Grouted Waterretaining Layers by Observational Engineering
By Bartho J. Admiraal
"As part of the Schiphol-Amsterdam-Almere project, the largest aqueduct in Europe is being built in order for the A1 motorway to cross the Vecht River. The A1 consists of 12 lanes and the total width
Jan 1, 2016
-
Slope Stabilization of Mill Creek Landslide Using Steel H-Piles
By Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis
"Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2
Jan 1, 2015
-
A Case Study Of Deep Shaft Excavation In River Channel Soil Deposit In Kolkata
By Kaustuv Bhattacharya, Manish Kumar, Nirbhay Singh, Prodyot Kr. Ray, Praveen Soin
This paper highlights salient features of an excavation 38 m (Length) by 10 m (Width) by 24 m (Depth) carried out in Central Kolkata. Secant pile wall (SPW) formed using a combination of alternating 1
Sep 1, 2022
-
Cast Insitu Piling For The King's Wharf Project, Sydney, Australia
By Slav Tchepak
The King's Wharf development is located in Sydney's Darling Harbour area. The site was originally used for industrial maritime purposes, which over the years has been reduced to accommodatin
Jan 1, 2000
-
Effect of Cold Joint on Behavior of Block Type Deep Mixing Improved Ground
By M. Kitazume, H. Imai
The deep mixing method was developed in Japan and put into practice in the middle of 1970s. Since then, the wet and dry type methods have been applied for various improvement purposes in Japan. One st
Sep 8, 2021
-
Friction Loss in Tieback Anchors used for Landslide Stabilization
By John P. Turner, Benjamin J. Turner
"Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho
Jan 1, 2017
-
Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water Tanks
By Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers
Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as
Oct 1, 2022
-
The Aged Reloading Response Of Piles In Clay
By Paul Doherty
It is known that the axial capacity of a displacement piles installed in clay varies with time. Consolidation theory suggests that dissipation of porewater pressure set-up during pile installation wou
Jan 1, 2011
-
Analysis Of Pile Behavior In Granular Soils Using DEM
By Jeremy G. Kress
We propose the discrete element method (DEM) as a complimentary alternative to analytical solutions and FEM models for the analysis of pile response. DEM is a novel approach to the engineering design
Jan 1, 2010
-
Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train Loading
By Pratik Goel, Sumanta Haldar
High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera
Sep 1, 2022
-
Effects Of Self-Weight On Thermomechanical Response Of Energy Piles
By Arash Saeidi Rashk Olia, Dunja Perić
The increasing demand for renewable energy has attracted attention to energy geostructures as means of extracting clean geothermal energy from the ground. To further advance the understanding of soils
Oct 1, 2022
-
Pneumatic Sinking 2.0: A World Record Caisson Project By Large Scale Innovations Evolution In Theory And Revolution In Practice
By Bartho J. Admiraal, Antoine Feddema
Pneumatic sinking of caissons has been established from mid-19th century. The technique of pneumatic sinking has been applied on many projects for underground construction up to depths over 20m below
May 1, 2022
-
Piled Rafts: Are We Modelling Them Correctly?
By Jonathan J. Dewsbury
It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e
Jan 1, 2010
-
30 Hudson Street Foundation Design and Construction in Variable Rock
By Joel Moskowitz, George J. Tamaro
"A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s
Jan 1, 2004
-
An Alternative Approach for Estimating the Vertical Capacity of L-Shaped Segmental Underpinning Systems in Urban Basement Construction
By Abid O. Adekunte, David Greentree, David Hilton
"The construction industry is witnessing an upsurge in demand by property developers to have basements incorporated into their residential and commercial development schemes. This is attributable to p
Jan 1, 2016
-
As-Built Analysis - An Integral Part Of Pile Foundation Design
By Dan Yang
Pile foundation designs are performed routinely based on geotechnical information available at the time of design, often with due consideration of large uncertainties inherent to soils and site condit
Jan 1, 2010
-
Ground-Supported Working Platforms For Tracked Plants And Mobile Cranes – Investigations Of Intercaction Effects
By Moritz Schleeh, Christian Moormann
Temporary working platforms are generally required in order to ensure that heavy construction machinery such as drilling and trench wall units, pile drivers, vehicle and crawler cranes can be set up s
May 1, 2022
-
Acceptance Of Timber Piles Based On Equivalent Driving Energy
By Chu E. Ho
This paper describes a case history involving the use of the Equivalent Driving Energy concept for evaluating timber piles that failed to achieve the termination criterion traditionally based on final