Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The recovery and utilization of fine coal

    By W. L. Thayer, K. A. Jonasson, R. D. Coleman, J. D. Hazlett, C. E. Capes

    "Loss of coal fines in reject slurries limits the yield of coal cleaning operations. Difficulties in handling fines also limit the extent of physical cleaning in treating coals with finely-disseminate

    Jan 1, 1988

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • CIM
    Current Statistics on Coal in Canada

    "IntroductionThe Chairman, in his speech to this body last year in Montreal, stated that the Dominion Coal Board looked to and depended upon the Bureau of Statistics for statistical material, and the

    Jan 1, 1950

  • CIM
    Self-Tuning Flotation Control at Brunswick

    By M. W. Franklin, D. W. Hendriks

    "Changing ore types, feed grades and c1rculat1ng loads are some of the many factors that can make flotation feed-back control difficult. To control a flotation circuit using conventional fixed-paramet

    Jan 1, 1986

  • CIM
    Cobre Panama

    By Ian D. Pirie

    Presentation outline ?Project location ?Geology ?Resources and reserves ?Results of the FEED study ?Social and environmental considerations ?Project path forward

    May 1, 2010

  • CIM
    A Short History of Mineral Processing

    By Fathi Habashi

    "Crushing and grinding of ores and their beneficiation by washing away gangue minerals has been practiced since ancient times. Primitive crushing was done by hand pounding the ore with a hard stone th

    Jan 1, 2009

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    Belt conveyor booster drives

    By J. A. Stewart

    "A common problem in the mining industry involves the overloading of established conveyor systems. This overloading can have a number of causes, such as new production technology or a changing market

    Jan 1, 1982

  • CIM
    Modelling of the Dry Magnetic Separation Process at Rio Tinto Fer et Titane

    By Carl Bertrand, Patrice Nadeau, Claude Bazin

    "Rio Tinto Fer et Titane processes the ore extracted from the Lac Tio orebody to concentrate the hemo-ilmenite (FeO.TiO2-Fe2O3) mineral that is subsequently smelted to produce pig iron and titanium ox

    Jan 1, 2011

  • CIM
    Mechano-Column Flotation

    By Turgut Yalcin

    "High-grade concentrates are achieved in flotation columns primarily due to the use of thick froth layers and wash water, both of which facilitate the drainage of hydrophilic minerals from the froth.

    Jan 1, 1997

  • CIM
    Linking Flotation Efficiency to Bubble Size

    By Jose R. Hernandez-Aguilar

    "This paper revisits data from previous studies (Hernandez-Aguilar, 2010, 2011) to better understand the link between metallurgical performance and pulp-zone bubble size (Db) in full-scale flotation s

    Jan 1, 2017

  • CIM
    Antiscalants for Calcium Scale Control in Gold Process Circuits

    By Brad Wells, Wayne Bull, Wayne Dickinson

    "Antiscalants were evaluated for control of calcium carbonate (CaCO3) in gold processing applications. Under severely supersaturated conditions, 100 percent inhibition was achieved with 30 ppm antisca

    Jan 1, 2014

  • CIM
    Galore Creek Project

    Project Located in northwestern British Columbia 70km West of Cassiar Highway Galore Creek Project and Road Access Corridors Designated For Mineral Development in Stikine-Cassiar Land Resource Manag

    May 1, 2006

  • CIM
    Quartzites purs du Quebecia

    By Jehan Rondot

    Les bancs de quartzite inhabituellement purs et epais decouverts lors de la cartographie geologique de la region de Charlevoix sont maintenant entres au stade de !'exploitation et se revelent etre une

    Jan 1, 1984

  • CIM
    Synergie Production ? Maintenance par le soins des équipements (SDE)

    By Yves-Laurent Turcotte

    Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî

    Feb 1, 2008

  • CIM
    Geometallurgical Modeling of the Dumont Deposit

    "The Dumont deposit is a large (1066 Mt probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporation acquired t

    Jan 1, 2013

  • CIM
    Minage des zones étroites à la Mine Bousquet

    By Paul Gauthier

    Aujourd?hui, avec un faible prix de l?or sur le marché, les opérateurs miniers doivent revoir leur façon de faire. La méthode de minage «Eureka» permet de réduire les coûts de production et d?accélére

    Oct 1, 2001

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • CIM
    Recovery of thermal coal from waste dumps near Stellarton, Nova Scotia

    By L. C. Bird, N. T. L. Landgren, M. W. Mikhail

    "Through funds made available in 1972 by the Nova Scotia Department of Mines and Energy (DME) and the federal Department of Regional Economic Expansion, a program was initiated to recover saleable coa

    Jan 1, 1981

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014