Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Con-Rycon Mine, Yellowknife, N.W.T.

    By C. E. White

    History The Con-Rycon mine is situated in the Yellowknife mining district, North West Territories, 608 air miles north of Edmonton, Alberta. The earliest reported discovery of gold in the area was

    Jan 1, 1949

  • CIM
    Small Scale Mining using the Modular Gold Processing Unit at the Granada Mine, Rouyn-Noranda, Quebec

    By Louis Cabot

    A pilot plant of the Modular Gold Processing Unit (MGPU) was designed, installed and operated, over a 8 months period, by RSW-Béroma, at the Granada Mine located near Rouyn-Noranda, Quebec. A descript

    May 1, 2001

  • CIM
    Hoisting Rope Research in Ontario Mines

    By R. E. Dye

    Introduction Research concerning all phases of hoisting practice, but more particularly the causes and prevention of hoisting rope deterioration and the improvement of safety dogs 158 for shaft con

    Jan 1, 1948

  • CIM
    The Effect of Inflation on the Evaluation of Mines

    By Herbert D. Drechsler, James B. Stephenson

    "AbstractThe paper identifies the major components of price change which affect the determination of the internal rate of return of a mining project. It illustrates several price indexes which may be

    Jan 1, 1977

  • CIM
    Enhancing CIL Gold Extraction by Hard Paraffin Wax Blanking of Double Refractory Ore Pre- or Post-Pressure Oxidation (POX)

    By G. Van Weert, O. Wang

    "As part of a general review of processing double refractory ores through Barrick Gold’s autoclaves / CIL facility at Goldstrike, blanking the preg robbing native carbon in the process solids with har

    Jan 1, 2012

  • CIM
    Grinding of Agrium phosphate ores in a 3' diameter pilot SAG mill

    By Rene Cane, V. I. Lakshmanan, John Starkey, Richard May

    "The Agrium Kapuskasing Phosphate Operation mines and processes up to 6,000 t/d of phosphate ore. Run-of-mine crushing to minus 6 inches is done in a toothed roll-crusher, while grinding is done in a

    Jan 1, 2002

  • CIM
    Mining taxation and global decision making

    By Robert B. Parsons

    "The last edition of Tax Notes expressed concern about two proposed tax changes in Finance Minister Paul Martin's 1995 budget that could have detrimental effects on Canada's mining industry.

    Jan 1, 1995

  • CIM
    Bench and pilot-plant beneficiation of calcium carbonate, sand and other industrial minerals

    By P. D. R. Maltby

    This paper describes the background and markets for calcium carbonate and silica sand in Canada, as well as the results of recent test work carried out at the Ontario Research Foundation. Tests on ser

    Jan 1, 1979

  • CIM
    The Utilization of High-Iron Chrome Ores

    By Marvin J. Udy

    THE preparation of this paper is in response to many requests for in-formation on the mining and smelting developments which have been carried on for the past three years or more by the Chromium Minin

    Jan 1, 1938

  • CIM
    Numerical Simulation of the Stress Field in Wushaoling Tunnel

    By Yang Shuxin, Guo Qiliang, He Ping, Lu Lizhi, Yao Rui

    "We combined stepwise regression and constrained regression statistical method to obtain the best boundary conditions for the calculation of in-situ stress field in Wushaoling tunnel using finite elem

    Jan 1, 2015

  • CIM
    Michelin Uranium Project, Labrador, Canada: Metallurgical Test Work, Economic Studies, and Process Design

    By J. R. Goode

    ABSTRACT Aurora Energy Ltd. is considering a 10,000 t/d process plant to produce 97 million lb (43,998,460 kg) of U3O8 over a 17-year project from uranium deposits in coastal Labrador. This paper summ

    Jan 1, 2012

  • CIM
    Syngenetic Gold: Lode Vein Geology and Exploration Implications

    By Kretschmar. U. H.

    Fieldwork in the Meguma of Nova Scotia and Archean equivalents shows that bedding-parallel quartz lode gold veins (LVs) commonly occur at the top of graded elastic sequences. We define a "gold cycle"

    Jan 1, 2011

  • CIM
    DEM Study of the Mechanical Behavior of a Leached Interface Upon Shearing

    By C. Lambert

    It has been shown that contacts between host rock and engineered barriers may be critical in the design of deep radioactive waste repositories. Water is expected to reach the interface zone after the

    May 1, 2009

  • CIM
    On-Stream Measuring of Mineral Concentrations in Slurries Using LIBS Results

    By Olli Haavisto, Lauri Koresaar, Navid Khajehzadeh

    In recent times sustainable minerals processing is an important topic in research. Sustainable mining is linked with efficient use of energy and human resource in all process stages including benefici

    Jan 1, 2016

  • CIM
    Some Aspects of Industrial Safety in British Columbia

    By W. K. A. Congreve

    Introduction Less than a hundred years ago the engineer was able to do his job without concern for the science that underlay his practices or for the men who operated his machines. But toward the e

    Jan 1, 1948

  • CIM
    Granite Burst Under Loading Conditions and its Characteristics of Energy Dissipation: Implementation by FDEM Method and Laboratory Experiments

    By H. Qi, J. L. Feng, D. J. Li

    "In the present paper, the characteristics of the granite burst under loading/unloading conditions was studied by means of both laboratory experiment and finite-discrete element method (FDEM). After g

    Jan 1, 2015

  • CIM
    Slim-Hole Drilling and 2 1/2.-lnch Casing, Tubingless Completions

    By John H. Nicholls

    In this paper, Imperial Oil Limited reports briefly on the drilling by contract rigs of twenty-nine slim holes in the Virden, Smiley, and Souris Valley areas. The investigations showed that slim-hole

    Jan 1, 1958

  • CIM
    Falconbridge Limited - Strathcona Mill

    By Peter Wells, Gordon Marrs, Dominic Fragomeni, Warren Holmes, Daryl Macnamara

    "LocationThe Strathcona mill ofFalconbridge Limited is located in Onaping, Ontario, 50 km northwest of Sudbury.GeneralOre from the Falconbridge mines in the Sudbury Basin (Strathcona, Fraser, Onaping,

    Jan 1, 2000

  • CIM
    Examination of Laterite Ferronickel Projects Using Pyrometallurgy Route in the Long Term

    By Reis. E., P. Pino Véliz

    "Along the process of defining the fundamentals of a ferronickel project, several questions require proper answers from the very beginning such as the size and characteristics of the laterite deposit

    Jan 1, 2017

  • CIM
    Evaluating the Effect of Operational Changes at Vale Inco's Clarabelle Mill

    By J. Doucet, C. Price

    In an industrial setting, operational changes are continually introduced, driven by new technologies or changing economics. Because of day-to-day variability, quantifying the impact of these changes b

    Jan 1, 2009