Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Compromising Technology with Field Expedience in Fragmentation EvaluationBy Jason M. Ryan
"Along with recent advances in computer technology have come cost-effective systems desiiedto evaluate fragmentation distributions through digital images of particles. In mining operations andmineral
Jan 1, 1998
-
Sources of Nitrate in Groundwater Near Roadway Rock Blasting SitesBy David M. Langlais, Krystle Pelham
"Explosives used in blasting operations, natural and anthropogenic sources such as septic systems,fertilizers, and decomposing vegetation can potentially contaminate groundwater with nitrate in thevic
Jan 1, 2016
-
Evaluating Airblast Damage ComplaintsBy Lawrence W. Gubbe
Air blast associated with detonation of explosives in mining, construction or military applications is often responsible for complaints by people who live or work in the vicinity of the activity. Most
Jan 1, 2004
-
Haul Road Design CriteriaBy Laurance A. Beck
Safety is the most important aspect of haul road design. Although other aspects of road installation enter decisions on design, the safety of persons using the road has to be foremost for the duration
Jan 1, 1995
-
Wireless Electronic BlastingBy Daniel Mallette, Richard Goodridge, C M. Lownds
Despite a world of mobile devices that has many of us taking the ability to communicate wirelessly for granted, an in-hole wireless initiation system was thought to be not viable. The known and common
Jan 1, 2016
-
Stemming Enhancement TestsA series of stemming confinement tests were conducted at a test site near Vernal, Utah. The purpose of the study was to determine the relative performance of various stemming enhancement “plugs”, stem
Jan 1, 2000
-
600 000 M.T to move, a High Risk OperationBy Jean-Sébastien Lambert, Serge Roberge
"At the end of 2014, Holcim Canada (Demix Aggregates Division) considered the possibility of drillingand blasting a big volume of rock in order to expose a high-quality limestone bench in one of their
Jan 1, 2016
-
Hole Deviations in Mining Operations: Types, Sources and EffectsBy Sam Kangwa, Thomson Sinkala
Th e re are three basic types of hole deviations in long hole d ri l l i n g , n a m e l y collar i n g , alignment and tr a j e c t o r y dev i a t i o n s . In mining, the accur a cy in drilling has
Jan 1, 2004
-
Garbage Plug Demolition Using a Low Detonation Velocity Explosive in “Presa Mixcoac” Dam, in Mexico CityBy Enrique Albarrán, Julian Hernández
"In 1942 The “Presa Mixcoac” dam was built, along with 15 other dams, to control the rain fall waterin the mountains west of Mexico City. Mexico City’s population at that time was around 1.5 millionpe
Jan 1, 2016
-
Analytical High-Speed Photography to Evaluate Air Decks, Stemming Retention and Gas Confinement in Presplitting, Reclamation and Gross Notion ApplicationsBy Mark E. Hammele
A number of new thoughts have recently emerged concerning the role of air decks, stemming, gas confinement and gross motion in specific blasting environments and applications. Field research in full-s
Jan 1, 1989
-
Desensitization and Malfunction of Cap-Sensitive Explosives and Delay Detonators (3c055ade-7146-4060-a860-4133718a0454)By Michael S. Wieland
This report focuses on the U.S. Bureau of Mines research regarding desensitization and malfunction of delay detonators and cap-sensitive explosives. Delay blasting in underground coal generates tremen
Jan 1, 1992
-
A Case Study of Near-Field Vibration Monitoring, Analysis, And ModelingBy Tamara Whitaker, James Gunderson, Ruilin Yang
This paper presents the results of a vibration control project conducted in soft overburden at a surface coal mine located in the western United States. The study uses near-field blast vibration monit
Jan 1, 2008
-
Electronic Detonators and LightningBy J. Lindenau
One of the significant benefits of electronic detonators is their safety, especially their relative insensitivity to extraneous electrical energy. The various brands of electronic detonators on the ma
Jan 1, 2008
-
Application and Economics of Overburden Casting: Can it Work for You?By Conny Postupack
To make money in mining coal you have to sell it for a lot more than it cost you to get it out of the ground. And yet, every year it cost us more and more to stay inbusiness, while the price we get fo
Jan 1, 1990
-
Journal: Junction Chamber Blasting November 22,1999By Edward Walter
Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m
Jan 1, 2001
-
Stratablasttm - A New Mining MethodBy T Goswami
The conventional practice in open cut coal strip mining has been to blast the overburden or coal layers in separate blast events. This is done in order to maximise the benefits from throw blasting and
Jan 1, 2006
-
Thedaveytronic-Theintegrated Electronic Delay DetonatorBy Rapheal Trousselle
For over 5 years, Davey Bickford has been developing and testing an electronic detonator blasting system. These new-technology detonators provide more accurate timing than conventional systems that re
Jan 1, 1997
-
The Computerized Design Program for Tunnel BlastingBy Jeon Jeon, Yong-Kun Choi, Chung-In Lee, Yong-Hun Jong, Hag-Soo Kim
In this study, a computer program to design tunnel blasting pattern has been developed. The program consists of two parts; one is for tunnel blasting pattern design and the other is for blasting model
Jan 1, 2005
-
Structural Response of Brick Veneer Houses to Blast VibrationBy Adrian Moore, John Wilson, Alan Richards, Emad Gad
Project C9040 – ‘Structure Response to Blast Vibration’, funded by the Australian Coal Association Research Program (ACARP), involved the investigation of the structural response from blast vibration
Jan 1, 2003
-
Immediate Internet distribution of vibration data from the historic Byward Market, Ottawa, CanadaBy Robert Lee, Jeff Corace, Rob Cyr
Blasting in the heart of the historic Byward Market District of Canada’s capital, Ottawa, presents a unique set of challenges. The obvious difficulties arising on projects requiring blasting within 3
Jan 1, 2006