Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Deep Mixing Technology in Deep Excavation in Soft Soil Area of Shanghai

    By Jie-qun Zhai, Jian Jia, Ke Yang, Xiao-lin Xie, Yu Zhang

    "With cities’ development, underground space exploitation presents a need for bigger and deeper constructions now. Technical problems founded during the construction of deep foundation pit support bec

    Jan 1, 2015

  • DFI
    Material Properties for Analysis of Deep Mixing Support Systems

    By Alex Grenoble, Alex Reeb, George Filz, Farzad Abedzadeh

    "This paper summarizes available information on the characteristics and properties of deep-mixed soilcement produced by the wet method. The topics covered in this paper include: unit weight, unconfine

    Jan 1, 2015

  • DFI
    Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power Facility

    By David Gatto, Nicolas A. Willig-Friedrich, Jeff A. Segar

    "With the increasing demand for electricity, and requirements to generate this power cleanly, more producers are turning towards hydroelectric power. A project in Iowa currently under construction wil

    Jan 1, 2016

  • DFI
    Session 21 "Grouting in Karst"

    By Jim Henry

    I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi

    Feb 10, 2003

  • DFI
    Execution of Pile Installation in Environmentally Challenging Sites

    By Dena Morgan, Emre Biringen

    "Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t

    Jan 1, 2014

  • DFI
    Low Overhead Secant Piles Drilled From Within A Shaft

    By Allen B. Stanton, Parthiv Brahmbhatt, Michael Grimm, Stanley L. Worst

    Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead power

    Oct 1, 2022

  • DFI
    Access And Riser Shafts-Detroit River Outfall #2 ? Introduction

    By Edmund J. Cardoza

    The Detroit Water and Sewerage Department (DWSD) provides water and wastewater services to the Greater Detroit Metropolitan Area. Sewerage is treated at the DWSD Wastewater Treatment Plant (WWTP) loca

    Jan 1, 2001

  • DFI
    Hybrid Design Approach for Anchored Retaining Walls in Complex Geology

    By Christopher J. Ramsey, Don W. Dotson

    "An existing four lane section of US 27 was widened to eight lanes. The project lies in the rugged Valley and Ridge Province of the Appalachian mountains starting at the Tennessee River in Chattanooga

    Jan 1, 2015

  • DFI
    Optimized Neural Network Model For The Prediction Of Driven Pile's Resistance

    By Hyun. I. Park

    Although numerous investigations have been performed over the years to predict the behavior and bearing capacity of piles, the mechanisms of these behavior and bearing capacity of piles have yet to be

    Jan 1, 2006

  • DFI
    Comparison Of Large Plate Load Test Result With Predicted Deformation In Deep Vibro Techniques Treated Ground For Iron Ore Stockpile Yard In Vietnam

    By Leong, William. Chong, Kam Weng

    Deep Vibro Techniques namely Vibro Compaction (VC) and Vibro Replacement (VR) are widely used in ground improvement to densify sands and strengthen cohesive soils. This paper describes the application

    Nov 1, 2022

  • DFI
    East Boston Branch Sewer Relief Project: Support Of Excavation Case Study

    By Eric P. Bregman

    As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

  • DFI
    East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)

    By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan

    "As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

    Jan 1, 2017

  • DFI
    Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange Project

    By Seth H. Hamblin, Leo J. Hart, John E. Regan

    The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the

    Jan 1, 2019

  • DFI
    Ground Improvement Using Stone Columns To Mitigate Liquefaction, Reduce Settlements And To Increase Safe Bearing Capacity Of In-Situ Soils – A Case Study

    By Venkata Krishnaiah Yeddala, Sai Vivek Adari, Suresh Kumar Velugu

    Assam cancer care foundation (ACCF) proposed the construction of hospitals and related facilities across 18 locations in the state of Assam-India. Tezpur is one among the 18 locations of Assam with hi

    Nov 1, 2022

  • DFI
    Impact Of Groundwater Flow On Design Of Open Underground Excavation

    By Heman Manchanda, Sandeep Sharma

    Several infrastructure projects are in various stages of construction and planning in India and almost all of them involves open ground excavation extending to varying depths. These structures are gen

    Sep 1, 2022

  • DFI
    State-Of-Art Working Platform For Heavy Equipments Used For Deep Foundation Construction

    By Arunsiva R., Sivaranan S., Venugopal B., Kumaran M.

    Being a rapidly developing country, India is undergoing a massive infrastructure phase change remarkably. The construction industry is already set to boom, but the time and space constraints necessita

    Sep 1, 2022

  • DFI
    Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way Limits

    By Thomas D. Humbert, Christopher J. Ramsey

    Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi

    Jan 1, 2019

  • DFI
    Simplifying the Design of Laterally Loaded Piles for Waterfront Structures

    By Amanda R. Parry, Chris R. Pray

    Predicting and modeling the soil structure interaction of laterally loaded piles with significant unbraced lengths is one of the challenges faced in designing many waterfront structures. Designers of

    Sep 8, 2021

  • DFI
    Analysis of Soil and Structural Thermal Response of a Field Scale Geothermal Energy Pile

    By Mohammed Faizal, Abdelmalek Bouazza

    "The operation of ground source heat pumps combined with foundation piles can have an effect on the thermal behaviour of the pile and the surrounding soil. This paper presents the effects of continuou

    Jan 1, 1900

  • DFI
    Radium Hospital Project In Oslo, Norway

    By Wojciech Szczepiński, Dominik Gächter

    In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau

    Oct 1, 2021