Theory And Practice Of Pile Foundations ? SynopsisBy G. G. Meyerhof
The paper reviews the state of the art of estimating the bearing capacity and settlement of pile foundations in sand and clay soils, including the effects of pile installation, scale effects of pile s
Jan 1, 2010
-
Vacuum Wellpoints For Slope Stabilization In The Foundation Pit During A Dry Dock ConstructionBy Mai Yuanjian
The stabilization effect in large excavation slope with vacuum wellpoints system during construction of a dry dock located in Guangzhou is introduced in this paper. In-situ observations indicate that
Jan 1, 1991
-
Engineering Practice Of Ground Improvement ? IntroductionBy H. R. Taber
The extensive subject area "Engineering Practice of Ground Improvement" will be treated within the limitations of space and the writer on the basis of personal practice and experience?largely in North
Jan 1, 2010
-
Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load TestsBy David J. Puller
As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river
Jan 1, 2002
-
Presentation #7 - Bi-Directional Static Load Testing - Load Testing High Capacity Piles What Have We Learned?By Jorj Osterberg
550 load tests of up to 150 MN have been completed on driven and bored piles using the Osterberg Load Cell. Because the test measures side shear and end bearing separately, much can be learned about t
Jan 1, 2001
-
Augered Cast-In-Place Pile Installation, Grand Forks, North DakotaBy Kyle A. Kershaw
The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo
Jan 1, 2003
-
The Resonant Driver: Ultra High Frequency Pile And Casing InstallationBy Matthew Janes
The installation of piles and casings is becoming increasingly difficult as restrictions on vibration become common in major urban areas. The use of high frequency, resonant excitation of a pile or c
Jan 1, 2008
-
The FHWA Geotechnical Program for 2017"Every year during the Transportation Research Board (TRB) Annual Meeting in Washington D.C., the Federal Highway Administration (FHWA) National Geotechnical Team (NGT) takes time to talk about what w
Jan 1, 2017
-
Temperature, Velocity, Density, And Moisture In Drilled ShaftsBy Khamis Y. Haramy
Curing temperature, density, and moisture significantly affect the velocity measured in the crosshole sonic logging, the rate of strength gain, and the final strength of concrete in drilled shafts and
Jan 1, 2007
-
7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And ConstructionBy Aly M. Mohammad
The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent
Jan 1, 2003
-
Session 16 "Deep Mixing Method IV"By Mary Ellen Bruce
Let me first address the issue of the wet grab samples. The wet grab samples that were attempted to take on the Central Artery were hindered by the fact that the way the mixing was being done was only
Feb 10, 2003
-
Innovative SSP Design and Construction for a Complex Soil Remediation ProjectBy Matthew C. Janes, Mark C. Spence
"A former coal gasification site next to Rock Bay in Victoria, BC, Canada required a barrier to permit dewatering and excavation of the bay and surrounding property. The adjacent property owners had s
Jan 1, 2016
-
Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality ControlBy Franz-Werner Gerressen
New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su
Jan 1, 2019
-
Behaviour Of Model Pile Group Under Axial Monotonic LoadingBy A. Le Kouby
We present in this paper the results of a parametric study carried out in a calibration chamber on instrumented model piles. The aim is to point out group effect on piles within a group through their
Jan 1, 2006
-
Analysis On The Vertical Bearing Capacity Of Socketed PilesBy Yong Jingrong
Based on the results of several test socketed piles in Sichuan, the mechanism of the deformation for a loaded socketed piles is investigated, and the concept of the socketed effect is proposed. The be
Jan 1, 1991
-
Analysis And Design Of A Piled Foundation For A Tall Tower ? SynopsisBy I. K. Ozaydin
Analysis of piles groups loaded with large bending moments and both vertical and batter piles can be best performed by matrix analysis. In this paper, a case history about a tall marine control tower
Jan 1, 2010
-
Practice Of Arranging Drilling Piles In Subsiding GroundsBy Vladimir M. Korolev
The field studies conducted at the experimental-production sites allowed to develop the technology of arranging drilling piles in loess subsiding grounds over 25 m deep and over 250 mm in diameter, to
Jan 1, 2002
-
High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? IntroductionBy Dhanvin B. Mehta
Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica
Jan 1, 1996
-
Effects Of Permanent And Temporary Loads On Allowable Bearing Capacity Of Piles Subjected To Nagative Skin FrictionBy Mohammad T. Izadi
Piles are, often, used for transferring load from the super structure through soft consolidating strata onto relatively stiff uncompressible soils. Downward movement of the soft soil strata develops
Jan 1, 2001
-
Construction Of Large Scale Diaphragm Walling And Related Problems - Part One - The Building Of Diaphragm Walling - I. The General Situation Of The ProjectBy D. X. Xu
A pump station was constructed at the food of a steep mountain, very close to a riverside. To protect the pump station from being washed out, and to guarantee the stability of the steep hillside behin
Jan 1, 2010