Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Innovative European Technologies To Accelerate Construction Of Embankment Foundations - Part II: DM, FMI, Mass Stabilization & CSV

    By Ali Porbaha

    In today's fast-track construction environment, owners are searching for non-conventional technologies to build their projects faster and safer while maintaining traffic flow during construction.

    Jan 1, 2002

  • DFI
    Environmentally Friendly Geothermal Piles At Keble College, Oxford, UK

    By Tony P. Suckling

    This paper presents a case study of a piling contract undertaken at Keble College in Oxford in the year 2001. Unusually, and for the first time in the United Kingdom, piles were successfully construct

    Jan 1, 2002

  • DFI
    4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction

    By B. De Paoli

    At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e

    Jan 1, 1994

  • DFI
    Micropiles For Rehabilitation Of Two Existing Structures

    By Jeffrey R. Hill

    This paper discusses the use of micropiles for the rehabilitation of the following two structures: the Milwaukee Auditorium Theatre, in Milwaukee, Wisconsin, and the Cupples Ballpark Lofts, in St. Lou

    Jan 1, 2008

  • DFI
    The Cosmopolitan Resort & Casino, Las Vegas, NV Specialty Foundation Work Under Extreme Conditions

    By Lawrence Piccagli

    This past spring of 2006, BENCOR installed the concrete reinforced diaphragm walls for the COSMOPOLITAN RESORT & CASINO in Las Vegas, Nevada. The project highlights include the excavation of approx. 3

    Jan 1, 2007

  • DFI
    Woodrow Wilson Bridge Cofferdams

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2005

  • DFI
    Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special Application

    By Andhra Pradesh, Nagarajkumar B. V

    As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad

    Sep 1, 2022

  • DFI
    Innovation In South East Asia - Synopsis

    By Brian Littlechild

    Whilst there is much innovative work being undertaken in South East Asia in the space allowed in this paper we have settled on describing in more detail the work that has been done with shaft grouting

    Jan 1, 2000

  • DFI
    A Review of the Design Formulations for Static Axial Response of Deep Foundations from Cone Penetration Test Data

    By Fawad S. Niazi

    Analysis of deep foundations in terms of axial capacity has been a topic of great interest in the soil-structure interaction problems. Soil behavior is governed by a series of complex stress-strain ch

    Jan 1, 2013

  • DFI
    An Investigation Of Pile Foundations Installed During The Late 19th And Early 20th Century For Re-Use In Building Support

    By Scott M. Doehla

    A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of

    Jan 1, 2008

  • DFI
    Performance Of Drilled Displacement Piles In The Midwestern United States

    By W. Morgan NeSmith

    Drilled displacement (DD) piles often develop significantly larger unit shaft resistance values than other drilled or augered pile systems in coarse grained materials. Minimal vibration and limited sp

    Jan 1, 2009

  • DFI
    Evaluating Installation Disturbance of Helical Anchors in Clay from Field Vane Tests

    By John Erikson, Alan J. Lutenegger, Nicholas Williams

    "In order to evaluate the level of disturbance produced in clays during installation, a series of single-helix and multi-helix anchors were installed at a test site consisting of a stiff overconsolida

    Jan 1, 2017

  • DFI
    Construction of Long Deep Mixing Columns by Low-Height Rig

    By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto

    "The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount

    Jan 1, 2015

  • DFI
    Pile Driving Hammers In Centrifuge Modelling - Synopsis

    By Daniel Levacher

    Pile load tests in site require extensive means of action and time. To get outstanding tests, the environmental test conditions must be perfectly known and acceptable. They concern the support install

    Jan 1, 1996

  • DFI
    Mansueto Library: Drama below Ground and Above

    By Patrick J. Lydon, Gregory A. Terri

    "The recently opened Mansueto Library at the University of Chicago campus was a 2012 OPA runner-up. The dramatic elliptical shaped dome of this structure tells only part of this structure’s story. The

    Jan 1, 2013

  • DFI
    Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.

    By Jim Bruce

    This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss

    Jan 1, 2004

  • DFI
    Underpinning Of A 16th Century Cistercian Abbey Foundation

    By Michel Bustamante

    The original Cistercian Lure abbey situated in eastern France and built in the second half of the 16th century, has become nowadays an administrative building. Because it has been founded on poor grou

    Jan 1, 2002

  • DFI
    Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container Ships

    By Bill Paparis

    The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which

    Jan 1, 2013

  • DFI
    Large Diameter Steel Tubular Piles For Optimum Seismic Performance

    By Ben C. Gerwick

    Large diameter steel tubular piles installed vertically or on a slight rake, offer many advantages as the foundations of major overwater bridge in regions of high seismicity. By proper selection of di

    Jan 1, 2013

  • DFI
    Wick Drain Guide Specification (Method)

    "1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi

    Jan 1, 2014