Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Integrated Mine Plan - Connecting Long, Medium and Short Term Planning Strategies at Goldcorp PeñasquitoBy R. E. Vivas
Goldcorp is one of the largest gold producers in the world with projects in South, Central and North America. Goldcorp?s flagship operation is Peñasquito, a world-class, poly-metallic deposit that sta
Feb 23, 2014
-
An Integrated Mine Plan: Connecting Long-, Medium- And Short-Term Planning`By Vivas
Goldcorp is one of the largest gold producers in the world with projects in South, Central and North America. Goldcorp?s flagship operation is Peñasquito, a world class, polymetallic deposit that star
-
An Integrated Mineral Processing Pilot Plant Practical Programme Designed For Heavy Mineral Sands BeneficiationBy E. L. Thyse, P. Bepswa
The Western Cape Mineral Processing Facility (WCMPF) is a collaborative educational initiative between the Department of Process Engineering at the University of Stellenbosch and the Chemical Engineer
Jan 1, 2007
-
An Integrated Mining and Chemical Plant Complex for Various Strontium and Barium ProductsBy W. J. D. Stone
"For several years, the existence of a deposit of barite (BaS04) near Brookfield, Nova Scotia, has been known. A very large deposit of strontium (SrS04) near Sydney, Cape Breton, is a more recent disc
Jan 1, 1969
-
An Integrated Model for Thermomechanical Deformation and Microstructure Evolution during Metal ForgingBy S. Illendula, B. Q. Li, R. A. Mirshams
"An integrated mathematical model is developed to represent the thermomechanical behavior of the materials and microstructure evolution during metal forging. The model development is based on the fini
Jan 1, 1998
-
An Integrated Multi Objective Multi Stage Mining Fleet Management System Linking Dynamic Operation to Short-Term PlanBy S. Upadhyay, A. M. Afrapoli
"Fluctuation in market price of mineral products has enforced mining companies to cut down their operating costs. One useful way of reducing operating costs in mining operations is to make optimal ope
Jan 1, 2018
-
An Integrated Open Pit Optimization with Material SchedulingBy George Dogbe
Open pit optimization forms the basis of mine design, production planning and construction of mine facilities. The negative effects of this phase may include substantial reductions in ore recoveries,
May 1, 2004
-
An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part A - Crushing and GrindingBy M Korte, J McMaster, C Brent
The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and has increased production from the original 119 t/h design capacity to a milling throughput of 265 t/h in
Jan 1, 2009
-
An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part B - FlotationBy T Gibbons, M Korte, C Brent, K Runge
The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and steadily increased production from the original 119 t/h design capacity to 265 t/h milling throughput in
Jan 1, 2009
-
An Integrated Procedural Approach that Increases Value to Underground Mine PlanningThe value derived by good mine planning is often underestimated as many mines steer their attention to the more immediate and more easily recognised successes made by the day-to-day operational æbush
Jan 1, 2009
-
An Integrated Process For Recovery Of Coal Fines From Waste Streams Using The Packed Flotation ColumnBy D. C. Yang
A practical and economical flowsheet has been developed and demonstrated by integrating the packed column flotation with the GranuFlow process for fine coal recovery. Orimulsion, which was used as an
Jan 1, 1998
-
An Integrated Process for Separation and Purification of Rare Earth Elements in Chloride MediumBy Patrick Wong, Gareth Hatch, M. A. Halim, V. I. Lakshmanan, Darcy Tait
"This paper describes development of an integrated chloride process for separation and purification of REEs. The process includes atmospheric leaching of ore/concentrate with mixed chloride lixiviant
Jan 1, 2016
-
An Integrated Process Including Rb Leaching from Rubidium‑Bearing Polymetallic Ore and Calcium Removing from Leachate - Mining, Metallurgy & Exploration (2023)By Zhongran Dai, Nan Hu, Jianhong Ma, Hui Zhang, Zhihua Zhong, Han Zhou, Feng Li, Yonggen Qiu, Yang Ding, Yingchun Yang, Dexin Ding
In the traditional chlorination roasting-water leaching-solvent extraction process for the extraction of rubidium-bearing ore, Rb leaching from the ore and calcium removing from the leachate are condu
Sep 27, 2023
-
An Integrated Quality Management System for Piping Fabrication Using 3D Laser Scanning and PhotogrammetryBy M Safa
Addressing deficiencies and defects that occur during construction projects is costly and time consuming. The manual quality assurance programs currently used in the industry have certain limitations,
Aug 1, 2013
-
An Integrated Risk Management Approach For Underground Coal Pillar Extraction In South AfricaAnalysis for pillar extraction potential (A-PEP) is an intelligent tool, which could be used as a preliminary output indicator when considering the secondary extraction of regional support pillars in
Jan 1, 2005
-
An Integrated Size Reduction-Mineral Liberation ModelBy Ronald L. Wiegel
Success has been achieved in developing mathematical models of rod mills, ball mills and recently to a limited extent autogenous grinding mills. There is also considerable activity in the development
Jan 1, 1975
-
An Integrated Solid Waste Management Method for Western Macedonia, GreeceAn Integrated Solid Waste Management Method for Western Macedonia, Greece
Sep 13, 2010
-
An Integrated Solution for Project Cost ControlProject cost control procedures and computer systems have enjoyed a successful and simple relationship over the past decade, thanks primarily to the proliferation of portable computers or PC's
Jan 1, 1990
-
An Integrated Steel Plant for the Year 2000By Ian F. Hughes
"Concepts of an integrated steel plant for sheet products to be built and operating in the year 2000 will be described. The design and operating methodology of this market driven facility will integra
Jan 1, 1988
-
An Integrated Strategy for Whole Ecological Utilization of Typical Industrial Solid Wastes in ChinaBy Yong Li, Tao Jiang, Xiangxin Xue, He Yang
"In this paper, we describe the current status and research progress on the utilization of typical industrial solid wastes in China. We propose a creative method called “eco-utilizing wastes” with an
Jan 1, 2012