Water Tightness Of Diaphragm Walls
By Radianto Elprama
For the realisation of the underground railway line RandstadRail in the city area of Rotterdam a bored tunnel is under construction. Diaphragm walls up to a depth of about 40 m were used to construct
Jan 1, 2006
-
Design Considerations For Underground Subway Station - Introduction
By Mohammed Z. Islam
As cities are growing all over the world, the need for urban transportation facilities are on the rise. Designers (of these facilities) today are faced with a number of constraints for their design, o
Jan 1, 1993
-
Capacity Of Driven Piles In Sand
By Mohab Sabry
Pile foundations are used extensively around the world to support both inland and offshore structures, including important structures such as nuclear plants and oil drilling platforms. The limit of th
Jan 1, 2006
-
Design Strategy For Deep Slurry Stabilized Bored Piles In Compression
By Chu E. Ho
Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p
Jan 1, 2002
-
Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 Introduction
By Peter Florian
At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning
Jan 1, 1993
-
Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :
By Virendra Singh
The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic
Jan 1, 1996
-
Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USA
By Rudolph P. Frizzi
This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary
Jan 1, 2003
-
Wanapum Dam Repaired Using Post-Tensioning Anchors
By Rick Deschamps, Brian Barkauskas, Aled Hughes, Abigail Stein
In central Washington, six miles south of the small town of Vantage, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and o
Jan 1, 2018
-
Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium
By Jacob Chacko
The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten
Jan 1, 2011
-
Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay Campus
By Robert E. Fosse
Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr
Jan 1, 2002
-
Response to Load for Four Different Types of Bored Piles
By Mario Terceros H., Bengt H. Fellenius
"ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore
Jan 1, 2014
-
Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place Piles
By Mike Muchard
Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an
Jan 1, 2000
-
Eglinton Crosstown, a New Step in Toronto’s Subway System
By Lars Richter, Franz-Werner Gerressen
"The Eglinton Crosstown Line was conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 as part of the Transit City plan, which included the implementation
Jan 1, 2017
-
Macropiles: Ultra-High-Capacity Micropiles For Foundation Support
By John R. Wolosick
MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr
Jan 1, 2006
-
Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)
By David B. Paul
"ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class
Jan 1, 2014
-
Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected Piles
By A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
-
Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? Synopsis
By G. Price
The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less
Jan 1, 2010
-
Comparison of Pile Foundations and Ground Improvement for Reduction of Seismic Displacements for a Wastewater Treatment Plant
By Andrew Port, Ali Ghandeharioon
Nonlinear seismic deformation analyses using the finite difference program FLAC were performed for a wastewater treatment plant to estimate foundation displacement and performance of two proposed tric
Jan 1, 2018
-
Residual Loads Measurements in Driven Steel H-Piles
By Reda M. Bakeer
"Measurements obtained during load testing of two steel H-piles driven at a site in Northeastern Mississippi are discussed. The general site conditions, equipment used, testing procedures and results
Jan 1, 2017
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)
By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010