Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Economics of the Carbon in Pulp Treatment of Low Grade Flotation Tailings: A Pilot Study

    By R. H. O. Wagner

    "This paper describes the bench testing, pilot plant studies of alternative flowsheets, to determine the feasibility of gold recovery, by carbon in pulp extraction, in the Schumacher Mill gold flotati

    Jan 1, 1984

  • CIM
    Brunswick Mine SAG Mill Liner Design and Wear

    By Chris Larsen, Ian Orford, Marilene Renaud, Mike Cooper, Lud Strah

    "An AG/SAG mill was commissioned at the Brunswick Mine concentrator in October 1998. This paper discusses the original liner design for the bi-directional AG/SAG mill, observed liner wear, subsequent

    Jan 1, 2003

  • CIM
    Revision of the Geology of the Southern Alberta Plains

    By Loris S. Russell

    THE plains of southern Alberta constitute one of the classic areas of geological investigation in Canada, for it was here in 1874, and in 1881 to 1883, that George Mercer Dawson (1, 2, 3) made the pio

    Jan 1, 1937

  • CIM
    Heap Leaching in Ontario - An Example

    By W. J. Witte, M. K. Witte

    "The purpose of this report is to present a generalized preliminary design and cost estimates for a typical heap leach operation such as might be undertaken in Northern Ontario. This report should be

    Jan 1, 1985

  • CIM
    Arctic mineral wealth — Will there be a two-sided coin?

    By Joanna LaForte

    "In response to “Arctic Mineral Wealth —Equitable Participation with Aboriginal Landowners – A slow or fast process?”, this author’s impression is one that, to her, seems obvious — this is definitely

    Jan 1, 1996

  • CIM
    Mill Modernization Program at Noranda Minerals Inc. Geco Division

    By L. S. Urbanoski

    This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine

    Jan 1, 1987

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • CIM
    Geology and Mine Development of the Red Dog Zinc Lead Deposit, Brooks Range, Alaska

    By Brigitte J. Dejou

    The Red Dog sediment-hosted zinc-lead deposit is located in the Brooks Range thrust belt in northwest Alaska, approximately 1000 km northwest of Anchorage. The mine constitutes the primary deposit in

    May 1, 2006

  • CIM
    The Coarse Particle Recovery Process (4291cbe3-857c-4d99-bb64-06edaaa4dc85)

    By Gregg S. Hill, Bert J. Huls

    "This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate an

    Jan 1, 2005

  • CIM
    The New Britiannia Project a TVX Gold Inc. /High Rlver Gold Mines Ltd. Joint Venture

    By Roy Lindsay, Paul O'Hara, Gary Halverson

    "The New Britannia Minesite is located in Snow Lake, Manitoba, 420 miles north of Winnipeg (figure 1). The mine previously operated from 1949 to 1958 extracting some 5.39 million tons of ore at a 0.15

    Jan 1, 1996

  • CIM
    Modelling and Resource Estimation of a Thin-Layered Lignite Deposit

    By Ioannis K. Kapageridis

    The lignite deposits of the Kozani-Ptolemais-Amyntaio basin in western Macedonia (North-West Greece) present a difficult modelling problem. Each deposit consists of several thin lignite layers ranging

    Oct 1, 2009

  • CIM
    A Preliminary Investigation of Respirable Silica Particle Surface in Central Appalachian Coal Mine Dust

    By L. Frost

    "Since the late 1990s, increased prevalence of severe lung disease among US coal miners has been observed, particularly in central Appalachia where thin-seam mining is prevalent. While respirable sili

    Jan 1, 2019

  • CIM
    Process Improvements at Placer Dome Campbell Mine

    By K. Norris

    "The Campbell mill has undergone numerous changes over the past 43 years. However the rate of change has increased significantly in the last 4 years. A new grinding circuit, carbon-in- pulp circuit, p

    Jan 1, 1992

  • CIM
    Indicator Mineral and till Geochemical Methods for Kimberlite Exploration in Glaciated Terrain

    By M. Beth McClenaghan

    This paper summarizes diamond exploration techniques used in glaciated terrain, focusing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history,

    May 1, 2002

  • CIM
    Considerations Regarding the Development of an Economic Mathematical Model for Optimizing the Technological Variants in the Coal Mine Faces

    By Dolea Gabriel Gheorghe

    In the present paperwork is proposed an economical-mathematical model (fuzzy) that aims optimize the technological variants of the mechanized coal face. By fuzzification, the issues to solve become mo

    Oct 1, 2009

  • CIM
    Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air Purification

    By Hiroaki Sakurai

    Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p

    Oct 1, 2003

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis, B. Sambirsky, J. Werner

    A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh

    Jan 1, 2004

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990