    The Effect of Froth Bubble Size Distribution on Flotation Performance in a Semi-Batch Lab Cell

    By M. H. Moys, C. Bhondayi, Eric Tshibwabwa

    "The relationship between froth bubble size as represented by intra-bubble impact distances (IID) and flotation performance is investigated. Experiments using an artificial ore comprising of limestone

    Jan 1, 2016

  • CIM
    Characterization of Frothers by Water Carrying Rate

    The recovery of fine hydrophilic gangue in flotation is related to the recovery of water. Water is carried by bubbles as a film and wake into the froth. The amount carried (entrained) depends on bubbl

    Jan 1, 2006

  • CIM
    Bioflotation of Sarcheshmeh Copper Sulphide Ore

    By A. Eslami, H. Tabatabaei, M. Kolandoozan, Z. Manafi, A. R. Shahverdi, M. Noaparast, M. Oliazadeh

    Application of Acidithiobacillus ferrooxidans bacteria to flotation of Sarcheshmeh low-grade copper sulphide ore was studied. Sarcheshmeh low-grade ore contains pyrite, which causes some problems in t

    Jan 1, 2004

  • CIM
    Coordination Polymers with Cyanoaurate Building Blocks: Structures, Physical Properties and Applications

    By Daniel B. Leznoff

    The cyanoaurate anions [Au(CN)2]- and [Au(CN)4]- are shown to be useful building blocks for synthesizing supramolecular coordination polymers. For the gold(I) unit, aurophilic interactions often incre

    Oct 1, 2003

  • CIM
    Crisis Management and Communications Preparing for the Unexpected

    By Dale Coffin

    Definition Of A Crisis Crisis \kri-ses:\ An unstable or crucial time or state of affairs whose outcome will make a decisive difference for better or worse (Webster's New Collegiate dictionary)

    May 1, 2004

  • CIM
    Is the Double Drum Hoist Still Viable at Depth? Recent Experiences

    By Bennett McLaughlin

    The Penna Shaft is the deepest single?lift shaft in North America. AGNICO-EAGLE started sinking the Penna shaft in 1995 with a hoisting plant capable of hoisting 1 800 tonnes per day from a 2 240-metr

    May 1, 2003

  • CIM
    Cost Control at Lamaque

    By W. Zieman

    "The low consumption of reagents can probably be attributed to a good clean type of ore. The cyanide level is kept at 0. 8 lb/ ton of solution and the lime at 1. 8 to 1.9 lb per ton of solution (pH 12

    Jan 1, 1964

  • CIM
    Packing in SAG Mill Shell Liners – Issues and Controls (9a0dbc8c-5b23-4b4b-94e7-4354b3142ec9)

    By D. Royston

    In SAG mills fed with a variety of ore types, hard packing between the shell lifters can come and go depending on rock type and rock size distribution and the presence of a binder. Packing can appear

    Jan 1, 2012

  • CIM
    The Snow Lake Concentrator

    By J. W. Stickney

    "On July 1, 1977 Hudson Bay Mining and Smelting Company Limited announced the commencement of construction of a 3800 ton per day concentrator at Snow Lake, Manitoba. Snow Lake, a community of 2200 peo

    Jan 1, 1981

  • CIM
    Carmen De Andacollo – Start-up of Teck’s New Copper Concentrator

    By L. Torres, C. S. R. Rondestvedt, M. Bustos

    In February 2010, Teck’s newest Concentrator at Mina Carmen de Andacollo (CDA), Andacollo, Chile was commissioned. The Concentrator is a single line configuration, comprising of one 36 ft diameter x 2

    Jan 1, 2012

  • CIM
    Quasi-Real Time Seismic Hazard Maps for Mining

    By Marty Hudyma

    Mining-induced seismicity and rockbursting is one of the primary risks in deep mines. Seismic data management software has been created to facilitate analysis of mining-induced seismicity. The Mine Se

    Oct 1, 2009

  • CIM
    Two-Stage Fluid Bed Reactor for Arsenic Removal and Fixation

    By K. Adham, C. T. Harris

    Arsenic is often associated with copper, nickel and gold in sulphide deposits. This paper describes a two-stage high-temperature fluid bed reactor for the removal and fixation of As from ores and conc

    Jan 1, 2014

  • CIM
    The Post-Failure Characteristics of Rock Pt 2: Application to Coal and Coal Pillars

    By T. G. Joseph

    The strain softening relationship developed in part 1 is now applied to coal. Having determined the post-failure stress-strain curve for coal specimens, this information can then be used in a finite e

    May 1, 2002

  • CIM
    Next Generation Mining Equipment

    By Charlie Graham

    Our Approach ? Industry Trends ? New Forces at Work in Mining ? Deep Mining ? Energy projects ? Air power ? Hydraulics ? Electric alternatives ? Drilling ? Productivity ? Conclusions ? Tran

    Oct 1, 2010

  • CIM
    Quasi-Real Time Seismic Hazard Maps for Mining (336da3c3-b002-41ab-b591-f666f29da050)

    By Marty Hudyma

    Mining-induced seismicity and rockbursting is one of the primary risks in deep mines. Seismic data management software has been created to facilitate analysis of mining-induced seismicity. The Mine Se

    Oct 1, 2009

  • CIM
    Give Your Electrical Mining Machines a Voltage Boost! Technology Update ? Voltage Regulation Systems for Mining Equipment

    By Tim Gartner

    This paper introduces a new application of a proven technology to provide dynamic, voltage regulation in underground mine electrical distribution systems. This technology acts to ?stiffen? the electri

    May 1, 2003

  • CIM
    High-Temperature Heat Pumps for Industry

    By Ron Ferris

    The Westinghouse Temptifier TM, using heat pump principles, recovers lowgrade waste heat in the 600P to 1600P temperature range and amplifies it to usable levels of up to 2200P. Coefficients of perfor

    Jan 1, 1979

  • CIM
    Ag Milling With and Without Pebbles Recycle - Effect on Multi-Component Ore Deportment and Throughput

    By D. Seke, E. Katsande, R. Khumalo, K. Seerane

    Palabora Mining Company (PMC) processes a multi-component ore body using a circuit consisting of two AG mills in parallel, closed with vibrating double deck screens and hydrocyclones. The bottom scree

    Jan 1, 2012

  • CIM
    Innovative CRF batch plant design at the Leeville Mine, Nevada

    By A. E. Reschke

    Optimized mine planning of the Leeville Gold Mine, Nevada, necessitated the requirement for an average of 2540 tpd of high quality cemented rockfill (CRF) in primary stoping blocks and underhand cut a

    May 1, 2007

  • CIM
    Progress Report on Use of On-Stream X-ray Analyser at Mattagami Lake Mines Limited

    By K. V. Konigsmann

    "The mill at Mattagami Lake Mines treats 3,850 tons per day. The mill feed is a heavy sulphide ore. It is composed ofPyrite & Pyrrhotite - 40%Marmatite - 17%Chalcopyrite - 2%Magnetite - 10%Talc and ot

    Jan 1, 1969