Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough Times

    By P Moynagh

    "A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua

    Nov 15, 2016

  • AUSIMM
    The Development of Hilton Mine, 1947-1985

    By Mutton B. K

    Hilton Mine is being developed as an integrated component of the Mount Isa operation, to achieve continuity of silver/lead/zinc production well into the next century. The mine has a chequered hist

    Jan 1, 1986

  • AUSIMM
    The Application of Heavy-Media Separation and Static Dry Cleaning of Coal at the Broken Hill Pty. Co. Ltd. Steelworks, Newcastle

    By Martin C. H, Met B

    INDEX OF CONTENTS:1. Introduction, Explanatory; and Reasons for Coal Cleaning.2. Principles on which Coal Cleaning is based.3. Location of Broken Hill Proprietary Co. Ltd. Plant.4. Description of Proc

    Jan 1, 1946

  • AUSIMM
    Managing Stress and Ground Condition Changes with Increasing Depth at Callie Underground Mine

    The Callie Underground Gold Mine (Callie) is owned by Newmont Asia Pacific and located 531 km north-west of Alice Springs in the Northern Territory. Historically, stopes have been mined util

    Nov 25, 2010

  • AUSIMM
    Advanced Technology for Setting Out of Blastholes and Measurement while Drilling

    By D Xiong, G Xu, L Yao, F Wang, Y Duan

    The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines

    Aug 24, 2015

  • AUSIMM
    Evaluating All the Alternatives to Select the Best Project Strategy

    It is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p

    Jan 1, 2007

  • AUSIMM
    Project Selection and Process Development for Mining Juniors

    By L Lorenzen, H Muller

    "Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th

    May 24, 2012

  • AUSIMM
    The challenges of the reuse of tailings and overburden

    By E M. Gama, L Resende

    The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels

    Jul 23, 2018

  • AUSIMM
    How Much Do We Need to Drill?

    By C Taylor, E Retz

    Sequential Gaussian conditional simulation of wide-spaced exploration data has been completed in order to optimise a drilling grid at Fortescue’s Eliwana deposit. The aim of this drill grid is to impr

    Jul 13, 2015

  • AUSIMM
    Maritime Bulk Cargo Transportable Moisture Limit Requirements for Iron Ore Shipments

    By K Williams, M Pender, T Honeyands, T Krull, D McCallum, R Holmes, R Orense

    Bulk cargoes, including iron ore fines, must be shipped according to the rules agreed by the member states of the International Maritime Organization (IMO). One critical safety measure is the transpor

    Jul 13, 2015

  • AUSIMM
    Mitigation of Post-blast Fume in Soft Ground and Wet Conditions

    By S S. Kanchibotla, E J. Sellers, L Julian, A Musunuri

    Fume events in coalmines are typically associated with wet conditions, soft ground and deep holes. An ACARP research project used laboratory and field testing combined with literature reviews, numeric

    Aug 24, 2015

  • AUSIMM
    Technical Challenges for the Pike River Coal Project in a Remote Mining Environment

    By J McNee

    Pike River Coal Limited (PRCL) is developing the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine is being developed to extract a coking coal deposit of the Brunner S

    Jan 1, 2007

  • AUSIMM
    Modelling of an Integrated Waste Storage Facility

    By P Edmondson, S Narendranathan, S Setchell

    The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s

    Jul 27, 2015

  • AUSIMM
    Development of a Sustainable Rehabilitation Strategy for the Management of Acid Rock Drainage at the Historic Mount Morgan Gold and Copper Mine, Central Queensland

    By T Laurencont

    The Queensland Department of Natural Resources and Mines (NR&M) accepted the environmental liability for the Mount Morgan minesite in 1991. This gold and copper mine located 38 km southwest of Rockham

    Jan 1, 2003

  • AUSIMM
    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • AUSIMM
    Mineral project risk and orebody knowledge – quantifying the value of drilling using decoupled net present value analysis

    By D Espinoza, I Rees, J Pocoe, P Collier

    P Collier, I Rees, J Pocoe and D Espinoza

    Mar 22, 2022

  • AUSIMM
    Development of a Predictive Geometallurgical Recovery Model for the La Colosa, Porphyry Gold Deposit, Colombia

    By S Leichliter

    La Colosa, Colombia is a large gold-porphyry deposit currently undergoing feasibility studies by AngloGold Ashanti. This period of development allows the opportunity to apply innovative and emerging t

    Sep 5, 2011

  • AUSIMM
    Molten slag flow in an ironmaking blast furnace – a mesoscopic level investigation

    By D Sert, A Jayasekara, P Gardin, B J Monaghan, S J. Chew, P Zulli, D Pinson, X F. Dong, R Ferreira

    In an ironmaking blast furnace (BF), molten slag and hot metal form in the softening-melting (cohesive) zone and then trickle through the coke packed bed before being discharged from the taphole. Duri

    Jun 19, 2024

  • AUSIMM
    Spontaneous combustion hazard assessment of McArthur River Mine waste rock

    By P Marianelli, J Theiler, B Beamish, A Spillman

    The presence of reactive pyrite in waste rock contributes to the hazard of spontaneous combustion in emplacement facilities as it acts as an initiator of self-heating at low ambient temperatures. Orga

    Jul 23, 2018

  • AUSIMM
    Characterising the Spontaneous Combustion Propensity of Waste Rock

    By J Theiler, B Beamish

    The presence of reactive metal sulfide minerals in waste rock contributes to the hazard of spontaneous combustion in dumps, as these minerals react with air and water entering the dump at ambient temp

    Jun 28, 2016