Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Use of Models in Solving Support Questions in Pillar Extraction

    Physical model testing at Bergbauforschung is done in two rigs, a roadway rig and a longwall rig. The loading of such models, in scale relation to the con- ditions in the collieries provides valuable

    Jan 1, 1974

  • AUSIMM
    Work Organisation for Attractive Mining – Lean Mining and the Working Environment

    By J Johansson, J Lööw

    Attractive mining workplaces are good, safe and healthy environments. They are also workplaces that the workforce of the future wants to work in. As skilled miners and engineers are already scarce, th

    Nov 4, 2015

  • AUSIMM
    Super-Scavenging of zinc Residue by the FASTFLOT Process at Pasmico Mining, Broken Hill

    By Fickera M. A, Marshall S, Burgeese F. L, Burgees J, Estrina H

    A new high intensity flotation process FASTFLOT was deployed to recover residual zinc from the zinc circuit tailings at Pasminco Mining's Concentrator, Broken Hill. Performance of the FASTFLOT

    Jan 1, 1995

  • AUSIMM
    Aqueous oxidation of gold-bearing sulphides

    By Ostrea AM

    Aqueous oxidation in an autoclave at ele- vated temperatures and oxygen partial pres- sures is applied to Philippine gold-bearing sulfide ores and concentrates which respond poorly to conventional c

    Jan 1, 1986

  • AUSIMM
    Recovery of Silver from an Oxidised Lead-Silver Ore by Cyanide Leaching

    Cyanidation tests by bottle agitation were conducted on an oxidized lead-silver ore containing approximately 12% Pb and 500 g/t Ag. Over 60% of the silver was leached when the ore was ground to 10

    Jan 1, 1987

  • AUSIMM
    The Ability of Current Gas Monitoring Techniques to Adequately Detect Spontaneous Combustion

    This paper investigates the adequacy of current gas monitoring techniques to adequately detect spontaneous combustion in underground coalmines. Despite being in the 21st century spontaneous combustion

    Jan 1, 2005

  • AUSIMM
    Competitiveness of Australian Coal in Relation to Transport Distance

    By Gillies A. D S

    Rail, port and shipping charges represent 30 to 50 per cent of landed costs for Australian coal mines selling to Asia. This proportion is higher for sales to Europe, yet it is in Europe where Austra

    Jan 1, 1994

  • AUSIMM
    Numerical Modelling of Undermined River Valleys ù A Case Study

    By J W. Lee, E Baafi, N Aziz

    Ground subsidence due to mining is a common dilemma confronting the underground coal mining industry. The effects of underground longwall mining on river valleys have come under scrutiny, especially w

    Jan 1, 2005

  • AUSIMM
    Stable Isotopes and Ore Fluid Chemistry of Gold Mineralisation at Waitangi Deposit, Thames District, Coromandel Peninsula, North Island, New Zealand

    By C G. Ryan, D R. Cooke

    The Thames gold-silver deposits are part of the Hauraki goldfield, situated within the Miocene to Pliocene calc-alkaline Coromandel Volcanic Zone (CVZ). The Waitangi vein system is one of the minerali

    Jan 1, 1999

  • AUSIMM
    A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

    By Y Ren

    The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents

    Sep 26, 2013

  • AUSIMM
    Factors Affecting Hot Spot Development in Bulk Coal and Associated Gas Evolution

    By I Jabouri

    There are many physical factors that can affect the self-heating rate of coal. The presence of seam gas has often been referred to as inhibiting coal self-heating due to the limited access of oxidatio

    Jan 1, 2005

  • AUSIMM
    Computer Simulation of Stoping Methods at the Z.C. Mines Broken Hill Operations

    By Koeng R, Richardson M, Hoare R

    A discrete event computer simulation model was developed for two of the stoping methods currently used at the Z.C. Mines Broken Hill oper- ations. The objective in undertaking this project was to pro

    Jan 1, 1988

  • AUSIMM
    Mine Fill Research And Investigations At Rit's Division Of Mining

    After a short presentation of the Division of Mining at the Royal Insti- tute of Technology, Stockholm, Sweden, the author presents some of-the fill research carried out at the Division. Literatur

    Jan 1, 1973

  • AUSIMM
    Instability analysis in three-way and four-way coal mine intersections

    By B Abbasi

    It is well known that most roof falls in coal mines typically occur at and around intersections. Room-and-pillar and longwall coal mining systems typically develop 3-way and 4-way intersections. This

    Nov 30, 2018

  • AUSIMM
    Clean Energy and Mining – Future Synergies

    By R Memary

    The environmental and economic impacts of a significant dependence on fossil fuels are affecting the future of sectors such as of mining. These impacts are prompting the Australian Government to seek

    Nov 22, 2011

  • AUSIMM
    Technical Note - The Introduction of "Slit" Submerged Entry Nozzles to No.1 Slab Caster, BHP International Group Pt Kembla, NSW.

    The introduction ofa submerged entry tundish nozzle incorporating a cylindrical internal space for argon distribution to its inner bore slab is described. In co-operation with the refractory supplier,

    Jan 1, 1985

  • AUSIMM
    Gold-New Developments, Research, and the Future

    New technology is a significant factor in the present upsurge in world, and Australian, gold extraction and production. The main technologies in current use for gold production are described, ref

    Jan 1, 1986

  • AUSIMM
    Simcoa's Continuous Drive Towards a Quality Organisation Through its Quality Leadership Process

    By Brosnan J. G

    Simcoa Operations is the only silicon smelter in the region and since the plant was commissioned in late-1989, has progressed from supplying silicon metal to the secondary aluminium market to the cu

    Jan 1, 1995

  • AUSIMM
    An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation Plant

    By J Zhou

    This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl

    Sep 26, 2011

  • AUSIMM
    Geotechnical Challenges in Narrow Vein Mining

    By J Hadjigeorgiou

    Narrow vein mining, as most types of mining, faces important geotechnical challenges. The specificity of geotechnical challenges in narrow vein mines stems from the nature of the deposits, which are o

    Mar 26, 2012