Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The evolution of structural and lithological domaining on the Spotted Quoll nickel sulfide mineral resource estimate

    By A D. Wulfse, C M. D Barton

    Underground fractured aquifers in the Ernest Henry deposit are to a large extent controlled by deposit scale brittle structures. The underground mine has been subdivided into nine water zones based on

    Mar 22, 2022

  • AUSIMM
    The Estimation of the Liquid Level in the Blast Furnace

    By Fukuda M, Kurita K

    A mathematical model for estimating the liquid level in the hearth is presented. The analytical result was checked on a cold two-dimensional model and an additional boundary condition for the fundame

    Jan 1, 1975

  • AUSIMM
    Plant Design for Closure

    By D P. Murphy, R F. Dewhirst

    Traditionally closure has been seen by the Resource sector solely as a green or an environmental issue, focused primarily on the requirement to rehabilitate the site following cessation of production

    Jan 1, 2006

  • AUSIMM
    ML and AI for resource estimation – what could possibly go wrong? Nothing! Everything!

    By M J. Nimmo

    extremely powerful tools for building predictive and generative models. ML can be used for building highly accurate regression and classification models. But without careful data science and statistic

    May 24, 2023

  • AUSIMM
    The Frieda Kiss – Keeping It Simple

    By S J. Tear, L D. Queen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Frieda River Project is located in the north-west of Papua New Guinea. The target commo

    Mar 18, 2015

  • AUSIMM
    Paper No. 158. Presidential Address. Ore Treatment at The Broken Hill Proprietary Mine.

    The treatment of the Broken Hill ores has,undergone many changes during the last ten years, and it may be of interest to some of the members to know what are the main lines on which the Proprietary Mi

    Jan 1, 1907

  • AUSIMM
    Effective Immersive Visualisation Systems for Mining Applications and Beyond

    By E Widzyk-Capehart, T Bednarz, O Daud, N Cutmore

    The interest of industry, in particular future mining, is pointing towards the use of novel visualisation systems to improve the operational efficiency of user interfaces. While the technologies used

    Nov 4, 2015

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    Driving Haulage Productivity Improvements through Industry–Academia Collaboration

    By R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch

    "The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e

    Nov 15, 2016

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Overseas Research Directions

    The Australian Mineral Industry's growth in the last two decades is directly related to the skill and experience of its consultants in mining, metallurgy, geology, finance, management, marketing

    Jan 1, 1986

  • AUSIMM
    Investigation and Development of Pasminco No 5 Ventilation Shaft, Broken Hill

    By de Bruin J H

    A method new to Australia was used for sinking a vertical shaft at Broken Hill in the development of Pasminco Southern Operations No 5 Ventilation Shaft. The 6 m diameter shaft of 820 m depth was plan

    Jan 1, 1993

  • AUSIMM
    Australian by Product Coking Practice

    Byproduct coking is practised in three of the major Australian ironmaking centres, the Newcastle and Whyalla works of the Broken Hill Proprietary Co. Ltd. and the Port Kembla works of Australian Ir

    Jan 1, 1972

  • AUSIMM
    A Formal Approach to Economic Analysis of Pit Slope Design

    By Coates D. F, Neil T. J, O&apos

    A proper economic analysis of pit slope design must reflect the trade-off between the benefits and the increased risks of slope fail- ure inherent in steeper slope angles. However, no formal framewo

    Jan 1, 1977

  • AUSIMM
    Planning Stable Post-Mining Landforms: The Application of Erosion Modelling

    By Riley S. J

    The basic aim of mine planning is to design mine layouts and schedules that achieve optimisation of operations, minimum cost and maximum resource recovery. Successful accomplishment of this aim is f

    Jan 1, 1994

  • AUSIMM
    An investigation into maximising the product grade and recovery of dense minerals in a single-stage REFLUX™ Classifier

    By J Zhou, L Crompton, K P. Galvin, J L. Sutherland, C P. Lowes, C Bezuidenhout, J Bijzet

    Platinum Group Metal (PGM) bearing ores from the Upper Group 2 (UG2) reef often contain significant concentrations of chromite which can potentially be upgraded to produce a saleable product. A common

    Aug 24, 2022

  • AUSIMM
    Blind Shaft Drilling of the Agnew Mine No. 1 Ventilation Shaft

    The Agnew Mine No. 1 Ventilation Shaft is the largest diameter shaft blind drilled in a hard rock mining environment. The selection of this method of shaft development was based on achieving an a

    Jan 1, 1983

  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015

  • AUSIMM
    Biomass and Renewables as Alternative Energy Sources and Reductants in the Minerals Industry

    Minerals processing operations use a significant quantity of fossil carbon to provide energy and as reductant. Greenhouse gas emissions from the use of this fossil carbon contribute to the global incr

    Jan 1, 2004

  • AUSIMM
    An analysis of impact of weak rock formation on mining-induced deformation of rock slope

    By A Sainoki, D Fukuda, K Shioya, C Zhang, M Sharifzadeh, T Yamaguchi, S Saydam, J Kodama, C A. Amagu, Y Fuji

    In an open pit mining, ensuring stability of rock slope has been one of the major challenges. As the instability of rock slopes can results in slope failures; consequently, endanger the lives of worke

    Nov 29, 2022