Search Documents

  • CIM
    Comparisons of the Geology and Proposed Underground Mining Methods of the Panda and Koala Kimberlites at the EKATI Diamond Mine

    By Peter A. Oshust

    The EKATI Diamond Mine has successfully completed the development and commissioning of the Panda Underground Project to extract the ore below the Panda open pit. The dominant kimberlite domain of the

    May 1, 2006

  • AUSIMM
    Landslide Stabilisation at the Clyde Power Project: A Major Geotechnical Undertaking

    Construction work on one of the world's largest landslide stabilisation projects is drawing to a close in Central Otago. Begun in mid 1990, major stabilisation work has been carried out on seven

    Jan 1, 1992

  • CIM
    Developments and New Applications for Biogenic Sulphide Reagent in Hydrometallurgy and Mineral Processing

    By R. W. Lawrence

    "In the past year, BioteQ Environmental Technologies Inc. have initiated design and construction of new plants to add to an existing list of plants that utilize the BioSulphide® and ChemSulphide™ proc

    Jan 1, 2007

  • SME
    Middle Rouge Parkway Interceptor Extension—A Case History

    By Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty

    The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in

    Jan 1, 2007

  • DFI
    Ground Vibrations from Pile and Sheet Pile Driving Part 2 — Review of Vibration Standards

    By K. Rainer Massarsch, Bengt H. Fellenius

    "Abstract Vibration limits for buildings with respect to ground vibrations from pile driving published in international standards are reviewed. At first, relevant vibration parameters are defined and

    Jan 1, 2014

  • SME
    Computational Fluid Dynamics Simulations And Experimental Validation Of Tracer Gas Distribution In An Experimental Underground Mine

    Following a disaster in a mine, it is important to understand the state of the mine damage immediately with limited information. Computational fluid dynamics can be used to simulate and ascertain info

    Jan 1, 2011

  • SME
    Electrochemical Study Of Gold Dissolution In Cyanide Solution (Preprint 00-90)

    By H. K. Lin

    Cyclic voltammetric and potential step chronoam-perometric techniques were used to study gold dissolution in cyanide solution. Three distinct anodic and one cathodic peaks appear on the voltammogram b

    Jan 1, 2000

  • SME
    Evolution Of Controlled Blasting Practices Dragon Products Company, LLC Quarry Operations, Thomaston, Me

    By K. Boakye

    This paper presents the results of a review of historic blast design practices at the Dragon Products Company, LLC (Dragon) Quarry Operation, along with the results of two different blast design vibra

    Feb 27, 2013

  • SAIMM
    The Build Up Of Additional HCFeMn Production Capacity By The Deepening Of A Furnace

    By T. Nishi, D. Teguri, K. Saitoh

    In recent years the requirement for high carbon ferro-manganese (HCFeMn), which is the key product of our company, has increased due to bullish demand for steel products. In our Tokushima works, we

    Jan 1, 2007

  • CIM
    Effect of Pulp Temperature on Copper and Gold Collectors at Hudson Bay Mining and Smelting

    By Karl Hoover, Cassandra Spence, Brent Bachewich, Jaakko Levanaho

    "Since year 2000 the gold recovery into copper concentrate at Hudson Bay Mining and Smelting has reduced considerably during the summer months. This initiated a testwork program in the fall 2003 to fi

    Jan 1, 2005

  • CIM
    A New Design Approach of Roadside Cut Rock Slope Based on Ecological Environment Protection

    By Lian-Jin Tao

    With fast development of China modernization, road construction obtains great achievement. However, in the construction process of highway, especially the high-grade highway in mountainous area, there

    May 1, 2009

  • SME
    Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK

    By Andy Alder

    The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t

    Jan 1, 2008

  • SME
    Effects Of Water Sprays Used With A Machine-Mounted Scrubber On Face Methane Concentrations

    This study was conducted to determine the effects of a machine-mounted scrubber and water sprays on face methane levels. Testing was conducted in the NIOSH ventilation test gallery which was designed

    Jan 1, 2001

  • ISEE
    Control Blasting on the Cross Lake Weir Project

    By George McIvor, Bill Thompson, Don Whitmore, Brad Rhude

    "In 1972 Manitoba Hydro decided to develop the hydro electric potential of the Nelson River. This program included the construction of the Jenpeg Generating Station at the point where the channel of t

    Jan 1, 1992

  • CIM
    Plenary Presentation - Manual Control, Process Automation – Or Operational Performance Excellence? What is the Difference?

    By Phil Thwaites

    "The mining industry uses many types of mineral and metallurgical plants to produce saleable product from ore mined. Plant design history has left current operations with a mixture of manual operation

    Jan 1, 2013

  • NIOSH
    IC 7278 Some Suggestions on Care in the Use and Handling of Explosives in Coal Mines

    By Lloyd G. Fitzgerald

    "The dangerous nature of explosives makes them a potential hazard wherever they are used, but they are likely to exercise their greatest harmfulness under conditions inherent in coal mining. The ease

    Aug 1, 1944

  • SME
    Promoting Illinois Coal Utilization Through Underground Disposal Of Combustion By-Products – Preprints 97-136

    By H. Sevim

    The utilization of high sulfur Illinois coal by utility plants has been decreasing since the enactment of 1990 Clean Coal Air Act Amendment. Illinois coal producers can make their coal saleable by off

    Feb 24, 1997

  • ISEE
    Pre-Blast Surveys; a Public Relations and Claim Reduction Tool (b114a2f5-7740-4145-afd2-f7ffc2af0fcd)

    By David Harrison, Edward J. Walter, Meitra Ferek

    Agreat tool in the prevention of blasting complaints and subsequent damage claims. In today’s highly competitive industry, we are always looking for ways to become more cost effective. This article in

    Jan 1, 1995

  • ISEE
    Journal: An Overview of Industrial Explosives in Japan

    By Yoshikazu Hirosaki

    How big or small is the Japanese explosive market? Who are the major explosive customers? Is there any big construction project in which a large amount of explosives is expected? What is the future of

    Jan 1, 2001

  • DFI
    Alternative Deep Foundation Solutions ? Dmm At Lpv-111 In New Orleans

    By Wesley Schmutzler

    The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t