Search Documents

  • SME
    Times Square Connection: ?Supporting The Cross Roads Of The World?

    By Victor F. Paterno

    In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu

  • AUSIMM
    Wacker Sampling as an Effective Gold Exploration Tool in the Reefton Goldfield, Greenland Group, West Coast, New Zealand

    By M E. Dunphy, P Silversmith

    The Reefton Goldfield, both historically and potentially, represents a significant gold producing camp in the Westland province of New Zealand. Some two million ounces of gold have been produced from

    Jan 1, 1997

  • ISEE
    Risk Management in Blasting: Lessons Learned the Hard Way

    By Ralph E. Burnham, Jeff Taylor, Jonson Montgomery, J. Kelly Ratliff, Rennie Montgomery, Martin Brashear

    Top priorities for all blasting companies and individual blasters are risk management, safety of company personnel and the general public, regulatory compliance, and liability protection. On a daily b

    Jan 1, 2018

  • IIMP
    Energy efficiency in the industry: A step to increase productivity

    By Elizabeth Cruz

    The paper point out innovative energy management techniques that lead to energy recovery and uses it back in the process as heat, mechanical work or power with a consequent impact on operating cost

    Sep 14, 2009

  • AIME
    Institute of Metals Division - Relationship Between the Mu Phase and the Sigma Phase in the Mo-Mn-Co System

    By B. N. Das, P. A. Beck

    THE o phases have a complex tetragonal structure with Lo/ao = 0.52 and 30 atoms per unit cell.1 A large number of such phases are now known to occur in various binary systems of the transition elemen

    Jan 1, 1961

  • CIM
    Water Management Design for Cigar Lake Uranium Mine

    By Ken Dyck Sr.

    "Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to

    Jan 1, 2006

  • SME
    A Case Study of Geological Characterization of Co-rich Ferromanganese Crusts over a Giant Guyot "Takuyo No.5," the Northwestern Pacific

    By H. Sato, B. Thornton, K. Nishi, A. Usui

    "Northwestern Pacific submarine seamounts are believed to be future marine mining areas of ferromanganese crusts, which contain hi-tech industrial metals, such as Co, Ni, Te, Ti, Pt, and REEs. The Tak

    Sep 1, 2014

  • AUSIMM
    The Application of Probabilistic Keyblock Methods for Support Design in Blocky Rock Masses

    Support design in jointed or blocky rock masses is often approached by the use of either 'rules of thumb', rock mass classification systems such as the Q-system (Barton, Lien and Lunde, 1974

    Nov 25, 2010

  • AIME
    Institute of Metals Division - Close-Packed Ordered Structures in Binary AB3 Alloys of Transition Elements

    By A. E. Dwight, P. A. Beck

    A search was made for ordered phases of AB3 composition in various combinations of Ti- and V-group elements with CO-and Ni-group elements. Three new TiNi3-type phases ZrPd3, HfPd3, and HfPt3 were foun

    Jan 1, 1960

  • ISEE
    Quake, Quarry, or Quack

    By Dominic Orf, Gregory Poole

    On December 12, 2018 at 4:14 AM EST, an earthquake registering a 4.4 magnitude on the Richter Scale occurred in central Tennessee. According to a survey posted on the USGS website, this earthquake was

  • CIM
    Pavoncelli Tunnel Case Study

    This paper describes the back analysis of the Pavoncelli tunnel, an hydraulic tunnel which was excavated between 1904 and 1915 in South of Italy and experienced severe damages during the 1980 Irpino-L

    May 1, 2009

  • AUSIMM
    Rock-Drill Developments

    THE following notes, compiled in the first instance for the makers of rock-drIlls, were read by Mr. Hanton at a meeting of the Broken Hill Branch on 12th Septelnber, 1922. It was decided that all Brok

    Jan 1, 1923

  • CIM
    Improving Raisebore Stability Assessments and Risk

    By B. M. Coombes

    The McCracken and Stacey (1989) method of assessing geotechnical risk for largediameter raisebored shafts has been the basis for most Australian pre-construction raisebore investigations for the past

    May 1, 2011

  • SAIMM
    Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and Construction

    By F. B. Samani, B. Stabel

    The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the

    Jan 1, 2003

  • SME-ICGCM
    Overmining In Kailuan, China Mining Area (d9eb7d79-18c1-4a77-a59a-53706a90764b)

    By Jun Han

    Coal has been mined in the Kailuan mining area for more than 130 years. The remaining reserves consist of, in large part, coals that would have been considered economically unminable or technically no

    Jan 1, 2009

  • CIM
    The Business Case for LHD Automation at Kidd Creek ? the World?s Deepest Base Metal Mine

    By Zachary Mayer

    Agenda ? Kidd Mine ? Background ? Problem & Opportunity ? Challenges associated to depth - Production Rates - Productive Work Time - Operational Delays - Transfer Levels - Mucking Time - Impa

    Aug 1, 2013

  • DFI
    Research on the Influencing Factors of Driving Super Long Piles in Bohai Gulf

    By Liu Run, Jia Zhao-lin, Yan Shu-wang

    "Piles with diameter larger than 2m in engineering can be defined as large diameter pile, and piles used for oil platform foundation in Bohai Gulf, are usually over 100m long and 2m in diameter. Such

    Jan 1, 2014

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • ISEE
    Florida Mining Blast Vibration Study Part 1: Do RI8507 Vibration Limits Apply in Florida?

    By Tristan Worsey, Nathan Rouse

    Florida is one of the major limestone producing states in the United States. The state has unique regional geology and groundwater characteristics that require equally unique mining methods to extract

    Jan 1, 2019

  • SME
    Copper Electrowinning In The Absence Of Acid Misting Using The Ferrous/Ferric-Sulfur Dioxide Anode Reaction-A Pilot Study (PRIPRINT 95-16)

    By W. J. Dolinar

    The U.S. Bureau of Mines implemented the Fe2+ /Fe3+-SO2 anode reaction in a Cu electrowinning cell with full-size electrodes. Electrowinning was conducted using industrial electrolyte at 258 A/m2 (24

    Jan 1, 1995