Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Evaluation Of The Safety Factor Under Static And Pseudo-static Conditions For Slope Stability And Redesign Of Mining Phases In An Open Pit Mine In The Southern Highlands Of Peru - SME Annual Meeting 2022By Y. T. M. Ocsa, V. O. Tenorio
This research is the result of a geotechnical study carried out in a natural slope in an Open Pit mine in Southern Peru, highlighting earthquakes as an important cause of instability within the case s
Mar 2, 2022
-
Evaluation of the coal strength for pillar calculationsBy K. P. Unrug, E. Thompson, S. Nandy
The method of coal pillar design involves primarily two aspects: the geometry of the pillar and the strength of the coal. However, the strength of the coal has to be emphasized with respect to the ent
Jan 1, 1987
-
Modular Carbon Adsorption PlantBy K. R. McGinnis
A major cost to a mining company is funding of an exploration program. It is a necessary cost to insure the company's future. But if the exploration effort does not discover an economic are body,
Jan 1, 1988
-
The Imperative Case for Innovation in the Mining IndustryBy Peter Bryant
"The case for innovation in the mining industry has never been more compelling—whether you believe the industry is in a sharp dip in a significant ‘sawtooth’ cycle or in the midst of a bust — the impe
Jan 1, 2015
-
Simplified Tailings Recovery Utilizing A Lewis EconosizerBy W. M. Lewis
Product losses to tailings ponds have long been a source of frustration for the mining and utilities industries. The utilization -of the Lewis Econosizer to recover lost products has proven to be very
Jan 1, 1998
-
Structural Retrofitting of Older German Road Tunnels—Possibilities to Fulfill Current Requirements Regarding Structural Fire ProtectionBy Ingo Kaundinya
"INTRODUCTION Tunnels are important elements of the German federal road network which have to cope with an increasing traffic load especially of heavy goods vehicles. In order to ensure a high availab
Jan 1, 2016
-
Financial Benefits Of Training At Cyprus Sierrita (6fb84046-b941-49d4-bf57-f0a86d00e2fa)By C. M. Jones
The training program developed at Sierrita over the last twelve months has led to several significant improvements in both safety performance and productivity. Our most easily quantified results have
Jan 1, 1998
-
Rockburst Risk Management To Make Tunnel Construction Feasible In High Stress Environments, Codelco El Teniente - RASIM 2022By Eduardo Rojas, Pedro Landeros
El Teniente Mine expansion plans are currently under development and construction stages through an integrated project strategy that will allow the continuity of future mining. The deepest sector corr
Apr 26, 2022
-
Clean Air Act Amendments of 1990 – An Eastern Coal Producer’s ViewBy G. W. Luxbacher
Acid rain legislation included in the Clean Air Act Amendments of 1990 caused a great deal of uncertainty regarding the price, source and production quantities of coal supplied to the eastern coal mar
Jan 1, 1992
-
Perceptive driving assistant system for opencast mines during foggy weatherBy Swades Kumar Chaulya, Vikash Kumar, Sushma Kumari, Naresh Kumar, Girendra Mohan Prasad, Monika Choudhary
Opencast mines are vulnerable to inclement weather conditions as it disrupts the day-to-day activities at these mines. To address the problem, a perceptive driving assistant system (PDAS) has been dev
Apr 1, 2023
-
Cobalt Recovery From Copper Solvent Extraction Raffinate Using Ion Exchange ResinsBy M. Rodgers
Dow Water & Process Solutions (DW&PS) was approached by ASARCO Inc. to attempt to recover cobalt and copper from their copper solvent extraction (SX) raffinate. Cobalt is added to many copper electrow
Jan 1, 2010
-
Wellfield Design Considerations For Copper Oxide In-Situ LeachingBy D. R. Baughman
Copper oxide deposits that may be considered for in situ leaching exist in unique geologic settings, different from uranium deposits. A large number of interrelated factors must be considered in wellf
Jan 1, 1988
-
Life Cycle Inventory Methodology In The Mineral Processing IndustriesBy I. Douni
In the last decade there is a growing interest from the society about the rational use of raw material resources and the minimization of the environmental impact of production processes and products w
Jan 1, 2003
-
Meeting US Minerals And Metals Needs For Energy ProductionBy John Hayden
The nation runs on energy. It is essential for the economic growth and national security of the United States that the nation has an adequate, sustainable, environmentally acceptable and economically
Jan 1, 2012
-
Current Practice Of Pillar Design In US Coal MinesBy K. Biswas, P. Tsang, S. S. Peng
A survey was undertaken in late 1993 and early 1994 to gain insight into the current status of pillar-design practice in underground coal mines in the United States. A total of 552 room-and-pillar min
Jan 1, 1997
-
A New Method Of Blind Hole Boring In A Mining EnvironmentBy W. Todd
The Robbins Company has developed a boring machine, with a rubber packer serving as the gripper system, for blind boring of raises without using drill pipe. This machine is the BorPak and has many app
Jan 1, 1994
-
Resources In Space - Prospects (9c657158-73f6-48c9-b708-9a3b3c93eebb)By R. J. Miller
The current National commitment to expanding the human presence into the solar system will clearly require major facilities in Earth orbit or possibly on the moon. Such facilities will need large amou
Jan 1, 1992
-
Some Applications Of Seismic Bedrock Investigations In Ore ProspectingBy John C. Stam
During the past 20 years, the seismic refraction method has been used for depth to bedrock investigations. Its usefulness, however, has been recognized mainly in engineering applications, for instance
Jan 1, 1959
-
Robotics Technology in Mine Disaster Reconnaissance, Rescue and RecoveryBy M. A. Trevits, G. W. Luxbacher, L. D. Patts
"It is almost a given that post-disaster mine conditions will have compromised the mine ventilation system, resulting in a hazardous atmosphere in portions of the mine, and often complicated travel th
Jan 1, 2018
-
The CMS Continuous Loader Development And Application In TunnellingBy Richard Crawshay, Duncan Hutchison
Continuous Mining Systems Limited have developed an efficient, high-capacity, in-line loading unit capable of handling shot rock in tunnel driveages at extraction rates up to 970 tonnes (1,000 tons) p
Jan 1, 1987