Rockburst Risk Management To Make Tunnel Construction Feasible In High Stress Environments, Codelco El Teniente - RASIM 2022

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 3457 KB
- Publication Date:
- Apr 26, 2022
Abstract
El Teniente Mine expansion plans are currently under development and construction stages through an integrated project strategy that will allow the continuity of future mining. The deepest sector corresponds to Andes Norte Project that faced rockburst risks during tunneling in a completely different manner, implementing different actions for the mitigation of seismic hazard and seismic risk management, based on the following main aspects: rock mass preconditioning techniques such as destress blasting and hydraulic fracturing, improvement of rock support design with the inclusion of elements with higher energy dissipation capacities, use of mechanized equipment for the most critical activities in addition to re-entry protocols and improvements in geological, geomechanical and seismic data collection procedures to reduce the uncertainty of rock mass behavior. The current seismic risk management strategy integrates all of these elements and is the basis of construction methodologies in use, supporting the technical feasibility of tunneling in high-stress environments.
Citation
APA:
(2022) Rockburst Risk Management To Make Tunnel Construction Feasible In High Stress Environments, Codelco El Teniente - RASIM 2022MLA: Rockburst Risk Management To Make Tunnel Construction Feasible In High Stress Environments, Codelco El Teniente - RASIM 2022. Society for Mining, Metallurgy & Exploration, 2022.