Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Desensitization and Malfunction of Coal-Mine ExplosivesBy Michael S. Wieland
Underground coal-mine explosives (permissibles) can be substantially degraded by the underground stress waves from the explosion of neighboring borehole charges. This cross-borehole interaction genera
Jan 1, 1987
-
Municipal Blasting: Blast Design, Vibration Monitoring & ControlBy Frank Lucca
This paper includes research and investigation into blast design and blast optimization for vibration control in municipal and tight blasting situations, where specifications were extremely stringent.
Jan 1, 2004
-
The Pioneer Use of ANFO in Small BoreholesBy Raymond V. Adolphson
The introduction of a new explosive component in 1955-56, called ANFO, featured much safer, effective blasting characteristics when compared to dynamite, accompanied by a notable reduction in cost. Th
Jan 1, 1983
-
Large-Diameter AN-FO Priming TechniquesBy Richard A. Dick
Few topics in the blasting industry are more controversial than the proper riming procedure for large-diameter ammonium nitrate-fuel oil (AN-FO) charges, despite the considerable amount of research th
Jan 1, 1976
-
Vibration Analysis for Blasting on a 16th Century Environment in Toledo - SpainBy Jesus Pascual, Benjamin Cebrian
A new Convention Center is going to be built in the millenary city of Toledo, right in the old city limits. The workings will need to excavate some 80.000 cubic meters of granite, which has, a trench-
Jan 1, 2004
-
Mass Blast of Pillars Using New Blasting TechniqueBy Ingvar Hansson, Bjorn A. Jonsson, Bernt Larsson
In the Kiruna Research Mine, Sweden, four large open stopes have been mined, leaving intermediate piIlars and crown pillars. At the final stage of mining mass blasting of the crown pillars above two o
Jan 1, 1986
-
Seismic Monitoring During Blastings of Building Pit for WTC at RijekaBy D Vrkljan, Z Ester
Excavating the building pit for the World Trade Center at Rijeka, it was necessary to blast over 160000 m3 of hard mass in fused condition. The building pit is located at a densely populated residenti
Jan 1, 1999
-
The Development and Testing of a New Mechanical Stemming AidBy Paul Worsey, Terry Nixon
The development and testing of a simple mechanical stemming aid (Patents pending) resulting from a Joint venture by Incubator Technologies Inc. and the University of Missouri-Rolla and funded by the U
Jan 1, 1988
-
Technical Review of Safe Blasting Design at Limited DistanceBy Agus Setiabudi
East Pit Wira II Project in South Kalimantan, Indonesia with a radius of <500 meters (1,640 ft) from residential has about 454,168 tonnes of coal reserves, with a total remaining reserves of 3,369,383
Jan 1, 2014
-
Reducing Blast Vibration Amplitudes Close-In to Structures of Sub-Standard ConstructionBy Enrique Munaretti, Cathy Aimone-Martin, Vitor Rosenhaim, Jair Koppe
Production blasts at one of Copelmi’s coal mine operations will be carried out 100 m (330 ft) from a neighborhood located in the town of Butiá, southern Brazil. Mine management is concerned about the
Jan 1, 2013
-
Benchmarking Drill and Blast Compliance to Design, A Case StudyBy Alan Tordoir, Mark Roberts
The drill and blast process is a critical function within the production cycle which significantly impacts the ability of an operation to effectively meet its safety and production targets. Acknowledg
Jan 1, 2019
-
Controlling Overbreak Through Vibration MonitoringBy Kaushik Dey
Bord and pillar is the most predominant method of wining of coal in Indian underground coal mines. Development heading in coal mines often encounters roof stability problem and results in roof overbre
Jan 1, 2008
-
Near-Field Vibration MonitoringBy R Yang, P D. Katsabanis, W F. Bawden
Understanding the mechanisms which are taking place during the propagation of a stress wave generated by an explosive charge is of high importance in the detection, characterization and prediction of
Jan 1, 1993
-
Innovative Landmine NeutralizationBy Everett Clausen, Richard Walker
CIL/EVANinc and the Canadian Explosives Research Laboratory of the Government of Canada have evolved a concept developed by Research Energy of Ohio, into a landmine neutralization system that is the m
Jan 1, 1999
-
Electronic Detonator Failed by Electromagnetic Waves Emitted on Detonation of Nearby Explosive ChargesBy Tuan Nguyen, Dirk Hummel, Ruilin Yang
In a tunnelling site in Japan, it was found that detonators failed to initiate with their shells and primary explosive intact. Their capacitors, however, were discharged due to some damage on the appl
Feb 6, 2023
-
Peabody Study: Optimizing Cast Blasting Efficiency Using ANFO With LinersBy Stafan Rose, Art Madsen
Four years ago, Peabody’s North Antelope Rochelle Mine (NARM) site started experimenting withANFO and Liners in its Cast Blasting operations. The motivation to use ANFO was based on the following:1. A
Jan 1, 2007
-
The 8 Millisecond Rule is Dead – Or Is It?By Daniel Richards, Dr Rob Farnfield, Dr Geoff Adderley
The 8-millisecond rule has been in use for many years as a basic technique to help minimize vibration levels from surface blasting operations. The rule was based on work carried out in the 1960’s by t
Jan 21, 2025
-
Disposal of Old Munition - Part 1. - A Research Method for the Estimation of Heavy Metal Deposit Range of Open Sur-face Mass DetonationsBy Martti Hagfors, Mervi Hokkanen
The Finnish Defence Forces has destroyed obsolete and spoiled ammunition in open surface mass detonations at Hukkakero fell, in municipality of Kittilä, in Lapland since 1988. The de-struction method
Jan 1, 2011
-
The Use of Nonel Reefmaster AssembliesBy Kfw Eick
The paper describes the use of the Nonel millisecond delay blasting system in narrow, deep, tabular ore bodies and briefly describes the standard stoping method as used on Harmony Gold Mine and compar
Jan 1, 1990
-
Effects of Blasting Vibrations on Uncured Concrete FoundationsBy Thomas A. Simpson, Yung-Kwaun Jow, Dennis L. Gamble
Construction of the $200 million Riverchase Galleria Mall in Hoover, Alabama was started in early 1984. The construction area consists of about 70 acres. The extensive building complex requires heavy
Jan 1, 1985