Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Concentrate Dewatering Modernization at the INCO Thompson Smelter

    By Mika Muinonen

    "Dewatering of nickel concentrate at the INCO Thompson integrated mine-metallurgical site takes place within the smelter plant. The eight original 60 foot diameter cable torque thickeners of which fou

    Jan 1, 2006

  • CIM
    Geomechanical Studies of an Alpine Rock Mass

    By Tiziana Apuani

    The study refers to an area of about 70 km2, extended in the Italian Central Alps along the the San Giacomo Valley where different civil and mining works are present The regional geological setting is

    May 1, 2009

  • CIM
    Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, Turkey

    By C. O. Aksoy

    There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary

    Jan 1, 2005

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • CIM
    Treatment and History of Arsenic Bearing Ores at Con Mine

    By Adrian Daniel

    "Dating back to 1934, Con Mine is located directly south to the city of Yellowknife in the NWT, Canada. With mill operations ceasing in 2004, a challenging surface remediation situation resulted which

    Jan 1, 2009

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • CIM
    Feasibility of controlled recirculation of exhaust air to reduce heating costs at Ruttan Mine, Manitoba

    By J. -P. Saindon, L. D. Nel, A. E. Hall, S. G. Hardcastle

    "This paper reports on an investigation into gas and dust concentrations in Ruttan Mine's exhaust air. The values obtained indicate that there is excellent potential to recirculate approximately

    Jan 1, 1988

  • CIM
    100 Years of Blowing Bubbles for Profit

    By Jan E. Nesset

    It is just over 100 years since the practice of blowing small bubbles into a mixture of ground ore and water revolutionized the mining industry, resulting in uneconomic deposits becoming highlyprofita

    Jan 1, 2009

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • CIM
    Precious Metal Refinery Process Selection - An Overview

    By G. Warren

    "In the past, smelting and refining of the precious metals recovered from ore has been generally looked upon as a small and relatively minor component of the business of gold mining. This is not surpr

    Jan 1, 2001

  • CIM
    Borehole seismic survey for mineral exploration: Case histories from Norman West and Halfmile Lake

    By G. Bellefleur, K. Stevens, E. Adam, D. Synder, G. Perron, C. Müller

    The Downhole Seismic Imaging consortium was initiated by the Geological Survey of Canada and three Canadian mining companies to assess the usefulness of borehole seismic techniques for the exploration

    Jan 1, 2004

  • CIM
    New Mill Design for Large Grinding Mills

    By Kjell Winther

    "Hydralift Scanmec introduced early in the eighties a new and different mill design for very large grinding mills. The design described has actually no size limitation upwards and is so far suggested

    Jan 1, 1995

  • CIM
    A Method to Assess Size Reduction by Grinding

    By Daniel Hodouin, Claude Bazin

    "A graphical method to assess the size reduction by grinding is presented and illustrated with data collected from laboratory grinding tests and industrial grinding circuits. The method lies between t

    Jan 1, 2004

  • CIM
    Operating Practices at Peñoles Concentrators – Mexico

    By Rodolfo Espinosa

    "Industrias Peñoles, S.A. de C.V. in Mexico, has nine mining operations, six managed by Peñoles (base metal mines) and three managed by Fresnillo plc (precious metal mines). Seven of the operations us

    Jan 1, 2011

  • CIM
    New Developments in Process Mineralogy of Platinum-Bearing Ores

    By Louis J. Cabri

    "Mineralogical evaluation of ores containing platinum-group elements (PGE) is fraught with difficulties because of the low grades (often 1-3 g/t PGE), dispersal of PGE (usually as finegrained platinum

    Jan 1, 2004

  • CIM
    Indusmin Limited Dust Abatement

    By D. E. Gorse, R. G. Anderson

    "Indusmin's history dates back to 1937 when they developed the Blue Mountain Nepheline Syenite deposit at Nephton, Ontario, and began supplying material for the glass, fiberglass, paint, ceramics and

    Jan 1, 1980

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    Rate Dependence of Flexural Tensile Strength of Laurentian Granite

    By F. Dai

    Due to difficulties associated with gripping in direct tension, indirect methods are commonly used to measure rock tensile strength. In this work, we adopt an innovative indirect tensile test method:

    May 1, 2009

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • CIM
    Corrosion test results and application of coil coated Galfan

    By R. F. Lynch, F. E. Goodwin, A. F. Skenazi

    "The Gal/an alloy has been developed for continuous galvanizing of steel. The choice of the eutectic zinc-aluminum alloy with addition of misch metal gives a coating with specific characteristics as f

    Jan 1, 1987