Development Of A Hydrometallurgical Path To Recovery Of Critical Materials From Spent Lithium Ion Battery Black Mass - SME Annual Meeting 2022By J. R. Klaehn, M. Shi, T. E. Lister, L. A. Diaz, J. S. McNally
Since 2019, approximately two dozen international battery recycling companies have been operating at the commercial or pilot scale [1]. However, current process capacity does not exceed 100,000 tons o
Mar 2, 2022
-
Electrowinning Of Gold And Silver From Copper-Bearing Cyanide Solutions (PREPRINT NUMBER 93-16)By F. H. Nehl
The U.S. Bureau of Mines investigated the selective electrowinning of Ag and Au from cyanide solutions contaminated with Cu with the goal of decreasing the amount of Cu co-deposited. Decreasing Cu co-
Jan 1, 1993
-
Probable Cost Estimating and Risk ManagementBy John Reilly
Costs of complex/underground projects have been consistently underestimated and delivery on time and on budget has been problematic. This has been attributed, to inadequate cost estimates and unidenti
Jan 1, 2008
-
The Nancy Creek Tunnel: Hard Rock Tunneling in AtlantaBy Jamie Bonner, Ray Hutton, Taro Nonaka
The Nancy Creek Tunnel is a deep tunnel, designed to store and convey wastewater by diverting flows from trunk sewers currently at or near capacity in the northwest of the City of Atlanta. The tunnel,
Jan 1, 2005
-
Experimental research on the behavior of ventilation air around shafts during a fireThe safety of personnel is the most important matter during a mine fire. However, there is not enough research on a case when a fire occurs near a shaft and the behavior of the fire gas is not well un
Jan 1, 2009
-
Updating The Los Pelambres Overland Conveyor SystemBy Linda Frederick
In July 1997, Krupp Canada obtained the contract to design and supply the conveyor system for Chile's Los Pelambres copper mine expansion project. Progress on the overland conveyor system is curr
Jan 1, 1999
-
Processing researchers continue efforts to streamline US miningBy P. Rosten
US mine production of iron ore in 1984 showed some improvements compared to 1983. But reduced demand from the iron and steel industry caused temporary shutdowns of many iron ore mines and pelletizing
Jan 5, 1985
-
Queens Bored Tunnels, East Side Access, New YorkBy David Smith, Bernie Martin
The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr
Jan 1, 2005
-
Waterproofing of a Subsea Tunnel with a Unique Sprayable Membrane— The Nordöy Road Tunnel, Faroe IslandsBy Sigurd L. Lamhauge, Karl Gunnar Holter, Svein E. Kristiansen
An innovative sprayable waterproofing membrane in combination with the traditional Nordic method of waterproofing with polyethylene foam sheets was used for the waterproofing of the tunnel. The spraya
Jan 1, 2007
-
Design And Construction Of The Lenihan DAM Outlet Tunnel And ShaftBy Hemang Desai
A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig
-
Expansion And Modernization Of An Iron Ore Pelletizing Plant In Northern SwedenBy M. Ahrens
The paper describes the main drive systems of an iron ore pelletizing plant and related important design aspects. It is shown how today?s drive systems provide the desired flexibility for the process
Jan 1, 2008
-
Ventilation and atmosphere control inside a 3-bar compressed air TBM headingBy B. R. Zernich
Advances in tunneling technology, such as Earth Pressure Balance and Slurry Shield methods, have allowed the tunneling industry to construct tunnels in increasingly difficult ground conditions. In rec
Jan 1, 2009
-
Auxiliary Ventilation in Underground MinesBy L. K. Marshall
Last month's engineering fundamentals article discussed some general considerations of underground mine ventilation. This month's article takes a look at auxiliary ventilation-brattice, fans
Jan 2, 1982
-
Observation, Forecasting And Measurement Of Ground PressuresBy Stanislaw Siewierski
One of the major problems in the exploitation of deep copper ore deposits in the Legnicko-Glogowski Copper Field is ground control and, in particular, roof control of the headings. The depth of copper
Jan 1, 1982
-
Hydrocyclone Modelling: Large Eddy Simulation CFD ApproachBy Jose A. Delgadillo
The hydrocyclone problem has been a challenging task for the last 30 years. In the 80’s and 90’s Computational Fluid Dynamics solution to this problem began to appear. These were unsuccessful due to o
Jan 1, 2005
-
Methane Explosion Modeling In The Sago Mine - Preprint 09-092By W. McMahon
Following the Sago Mine accident, the Mine Safety and Health Administration (MSHA) asked the U.S. Army Engineer Research and Development Center to study several possible methane explosion scenarios in
Jan 1, 2009
-
Exploration: Both a Boom and Bust Year - 1980 Annual ReviewBy Paul Russell, M. M. Kimberley, Erick F. Welland, Louis Cope, C. C. Mosher, William M. Shepard, William C. Larson, Graham Closs
Exploration activities in 1980 felt the effects of unstable economic conditions and oscillating metal prices. In the cyclical, boom-or-bust precious metals and uranium markets, precious metals activit
Jan 5, 1981
-
Mine Wide Protection For Miners, Equipment And InfrastructureBy W. H. Schiffbauer
The protection of miners, equipment, and infrastructure is discussed. While the primary focus of the described technology is to prevent miners from being injured, struck-by, or crushed by heavy equipm
Jan 1, 2011
-
Reducing Blasting Damage By Expanding Delay Timing ? IntroductionBy R. D. Rein
The Henderson mine is a large continuous panel caving operation in central Colorado. The orebody is roughly 760 m by 910 m and will be extracted from two production levels. Each level is divided into
Jan 1, 1985
-
Newmont Gold Company Post Mill Grinding CircuitBy David L. Hill
Newmont Gold Company's Mill No. 4 is located along the Carlin trend, about 25 miles North of Carlin, Nevada. The plant consists of a primary grinding circuit using a 7.2 m (22 ft) diameter by 2.6
Jan 1, 1993