Use Of Geospatial Project Information Management Systems On Diaphragm And Secant Pile Walls
By Andrew Higgins, Jamey Rosen
This presentation will demonstrate some recent advancements in the applications of Project Information Systems (PIMS) technology to seepage barrier walls in the context of evolving Owner Specification
May 1, 2022
-
Construction Of The Drilled Shaft Foundations For The Huey Long Mississippi River Bridge, New Orleans
By Dan A. Brown
The foundations at the Huey P. Long Bridge in New Orleans presented special challenges for construction due to the requirements for very deep drilled shafts in the Mississippi River beneath the existi
Jan 1, 2010
-
Keynote Lecture 5: Giovanni Lombardi Grouting of Rock Masses
By Giovanni Lombardi
In order to get a clear overview of the grouting works carried out, to avoid misinterpretations of the data and functions shown on the display of the grout monitoring device, it is recommended to keep
Feb 10, 2003
-
Excavation-Induced Movement of Adjacent Foundations
By Hugo Meggitt, Damian R. Siebert, Wystan Carswell
Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras
Jan 1, 2019
-
Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean
By Ihab Allam PE, Meeok Kim. PE. Ph. D
The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa
-
Risks Associated With Finite Element Modelling Of Cut And Cover Structures
By Tony Suckling
The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This
Jan 1, 2010
-
Geo-Foundations Project Information Management Systems on a Budget
By Jamey B. Rosen
As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech
Jan 1, 2019
-
Numerical Analysis Of The Osterberg Cell Loading Test
By Brunella Recinto
Pile loading tests are carried out with two main objectives: 1) evaluating the ultimate resistance; 2) checking the behaviour of the pile under live load. In the first case and particularly for large
Jan 1, 2003
-
Geospatial Project Information Management System At Herbert Hoover Dike
By Jamey Rosen
A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of
-
A Study Of Failure Mechanism And Uplifting Capacity Of Tension Pile Foundation ? Synopsis
By K. J. Yang
Based on investigations and model tests combined with pile foundation on Code compilation of drydocks, we present this report to give informations against uplift pressure of piles beneath floor of dry
Jan 1, 2010
-
Realizing The Benefits Of LRFD For Deep Foundations
By Bernard H. Hertlein
The introduction of LRFD methods for structural design has been a gradual process by AASHTO, ACI, AISC, ASCE, and the FHWA, which has largely been ignored by the deep foundations industry. In 2007, ho
Jan 1, 2007
-
Session 15 "Jet Grouting IV"
By Mitsuhiro Shibazki
I can't answer that question but I am looking at Andy, my co-author, and he says we didn't measure it. No movement. If I understand it correctly, how do we handle lateral forces in shear? T
Feb 10, 2003
-
“Digital Specialist Foundations”- Using The Digital Twin During Project Execution
By Marcus Daubner
This paper explains how BAUER Spezialtiefbau GmbH uses digital methods on projects - starting from work preparation to completion of works. More precisely, the advantages of BIM-based planning during
Sep 1, 2022
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone Dam
By Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Session 14 "Deep Mixing Method III"
By Stefan Dahlin
The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation
Feb 10, 2003
-
Using Dynamic Pile Testing To Overcome Surprising Soil Variations
By H. (Sam) Salem
A site investigation for a wide and tall hotel building, in the San Juan Bay area, Puerto Rico, indicated a soil profile of silty clay on sand, soft and loose enough to require piled foundations. The
Jan 1, 2008
-
Behavior Of Pile Foundation Under Impact Lateral Loads
By Hajialilue Bonab M.
The soil-pile interaction under lateral impact loads is not yet completely well known. Many tests on single piles under static lateral loads in centrifuge have been performed and P-y curves have been
Jan 1, 2002
-
Non-Destructive Testing Of Piles - A Case History - Summary
By Manish Kumar
One of the recent advances in the field of testing of concrete piles is the Non-Destructive testing (NDT) of piles. This paper deals with a specific project where this technique was employed along wit
Jan 1, 1996
-
Session 12 "Deep Mixing Method II"
By Helen Ahnberg
The scope of the present paper is limited to report the experimental evidence and not for describing the analytical assumptions. However, the idea behind the experimental program is that the deteriora
Feb 10, 2003
-
Behaviour Of Laterally-Loaded Piles Centrifugal And Numerical Modelling ? Synopsis
By W. H. Craig
Techniques have been developed for installing model piles into beds of soil under high sustained acceleration levels aboard a centrifuge. These piles have been subjected to static and/or cyclic latera
Jan 1, 2010