Search Documents

  • SAIMM
    Bateman Mega DMS Modules- Successes And Challenges - Introduction

    By N September, R Abate

    Bateman Modular (previously Van Eck and Lurie) has been building and supplying the mining industry with modular DMS plants for the last 30 years. These DMS modules range in capacity from 1 tph to 200

    Jan 1, 2006

  • SAIMM
    An analysis of the practical and economic implications of systematic underground drilling in deep South African gold mines

    By D. G. Krige

    Using chip sample data and spatial structure parameters from a large mined-out section of a South African gold mine the advantages to be gained from a regular underground borehole drilling programme h

    Jan 1, 2003

  • NIOSH
    MLA 16-88 - Mineral Resources Of The West Big Hole Study Area, Beaverhead County, Montana ? Summary

    By David A. Lipton

    In the summer of 1985, at the request of the U.S. Forest Service, the U.5. Bureau of Mines examined the 109,000-acre West Big Hole study area to evaluate its identified mineral resources. The study ar

    Jan 1, 1988

  • ISEE
    Advanced Blast Modeling for Mining Steeply Dipping Coal Seams

    By Dan L'Heureux, Joe Haid, Stephen H. Chung

    Most coal deposits in Western Canada involve steeply dipping multiple seams. An efficient way to recover coal seams would be to drill through the seams and blast both the overlying and underlying wast

    Jan 1, 1998

  • ISEE
    Increasing Productivity Through Field Control and High-Speed Photography

    By David G. Borg

    "Although researchers have realized varying degrees of success in numerics modeling, computer blast simulations and small scale in-situ testing, most will agree that the greatest uncertainty in total

    Jan 1, 1989

  • DFI
    A Proposal Of Calculation Of Piled Raft Foundations

    By Andrzej Tejchman

    Calculation of pile foundations should possibly truly reflect its real work, mainly with respect to the value and distribution of settlements, pile internal forces and bending moments within a slab. M

    Jan 1, 2002

  • CIM
    The Shortage of Engineers -Are We Working on the Solution or Are We Part of the Problem?

    During the past decade, the miner-al industries have been faced with an increasing shortage of engineers. The point has now been reached where the shortage may be termed critical. This shortage may be

    Jan 1, 1965

  • CIM
    Reducing Water Management Risks Through Processing Changes

    By C. Kennedy, S. Jensen

    Traditionally, mineral processing plants are designed to achieve the highest recovery of valuable material with limited regard for the cost of managing waste products-both solid and water components.

    Jan 1, 2014

  • AUSIMM
    The Selection Design and Application of Mill Liners for Large Wet Grinding Mills

    By C Thompson, D Connelly

    The history of mill liners has evolved over time and this paper tracks the changes and development of liner technology. It provides an overview of the primary types of liners, the design and the mater

    Jul 15, 2013

  • TMS
    Plant-Wide Process Control For The Collahuasi Project

    By Alex Del Castillo

    The mineral processing industry has followed the development of database control systems, and various systems have been installed in existing and new plants. The goal is to improve product quality, ra

    Jan 1, 1999

  • CIM
    Paracatu Gold Mine - Successful Processing of a Large Low-Grade Ore Body

    By Wayne Phillips, Anatalia Silva, Robert Henderson, Tondo. Luis

    "Kinross’ Paracatu Mine has 20 years of operational success as one of the lowest grade milloperated gold mines in the world. At year end 2005, Paracatu’s Proven and Probable Reserves were 1.18 billion

    Jan 1, 2007

  • NIOSH
    Stoping Methods And Costs - Introduction

    By Chas. F. Jackson

    This bulletin is one of a series of Bureau of Mines reports dealing with mining methods, practices, and costs. A study of this subject was undertaken by the Bureau in cooperation with a large number o

    Jan 1, 1936

  • SME
    8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

    By Antonio Raschillà

    On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p

  • SME
    Discussion - Commercialization of eastern US oil shales — a review - Technical Papers, MINING ENGINEERING, Vol. 97, No. 12, December 1985, pp. 1381-1385

    By V. Rajaram

    R.K. Leininger, N.R. Hasenmueller, and D.D. Carr The content of the paper by V. Rajaram does not fulfill the expectations of the title. But Rajaram submitted the article in October 1983, and he cou

    Jan 10, 1986

  • SME
    Integration Of Real-Time Survey, Mine Planning Software, GIS & Machine Control GPS For Mining Operations Management

    By Barry A. Hillman

    The rapid evolution of computer and field sensor technology is now providing the ability to integrate mine and office operations. Digital maps and mine plans as well as CAD and GIS can be transferred

    Jan 1, 1998

  • CIM
    Development of the automatic GO-60 drill

    By R. England

    "This paper describes the objectives and design parameters for the operation of a computerized In-The-Hole (I. T.H.) Drill. The principal objective is to add computer control to an Inco 00-60 I. T.H.

    Jan 1, 1987

  • ISEE
    A Case Study of Dimensional Stone Blasting in Korea

    By Choon Sunwoo, Chang-Ha Ryu

    There are various methods available for the recovery of dimensional stone in open pit quarries. Explosive blasting has more advantages in the economic point of view over the other methods but was not

    Jan 1, 2003

  • CIM
    Parallel Surface Fan Operation At Hoyle Pond Mine

    By M. Desjardins

    The Hoyle Pond underground mine, located in the Porcupine Gold Camp, east of the city of Timmins, Ontario, Canada, is the cornerstone of Goldcorp Canada Ltd?s Porcupine Gold Mines. Cut and fill, shrin

    Aug 1, 2013

  • DFI
    Evaluation Of Design Methods For Tieback Retaining Walls In Seattle - Introduction

    By John P. Turner

    The behavior of tieback retaining walls depends on many factors, including soil properties, groundwater conditions, construction sequence, spacing and stiffness of tiebacks and soldier piles, tieback

    Jan 1, 1990

  • AUSIMM
    Regional and Tectonical Geology in Relation to Australian Ore Deposits

    The extent of regional stratigraphic and structural geological mapping so far carried out in Australia is likely to be greatly overestimated by uncritical inspection of the latest authoritative geolog

    Jan 1, 1950